Issue taken care of with the irrigation valve stock on irrigation station #15 from controller # 8 Behind the rec center along the red brick wall at Red crest Dr.
Mud and dead leaves were removed from the gutters and cleaned.
Shelves were built for the Garland Workshop.
Setup for Board Meeting.
Trash was picked up around lake.
Lake Management:
During today's maintenance visit, the following was conducted: The crew collected trash and debris from all lakes and shorelines on the Stone Gate side of the community.
Entry Water Features: The crew cleaned all the debris baskets. We also corrected an issue with high pressure on the East feature by adjusting the flow valves.
Island Shores (Lake 1): The fountain is running and flowing properly. The lights and timers are functional and accurate. We recorded the well meter reading.
Island Shores (Lake 2): The fountain is running properly. The lights and timers are functional, the outfall was cleared of blockages. The water level is normal.
Bluff Springs (Lake 3): The fountain is running properly. The lights and timers are functional. The water level is about a foot low, so we turned the well on to refill the lake.
Bluff Springs (Lake 4): The fountain is running and flowing properly. The lights and timers are functional and accurate. The outfall is clear of debris.
Harmony Springs: The back fountain is still down due to an underground electrical line that was cut during some utility boring. Centerpoint disconnected the meter because the line was still live during the incident and will return to restore the meter once the line has been repaired. The Entry fountain is running properly. The lights and timers are functional and accurate. We recorded the well meter reading. The outfall is clear of debris.
Danbury Bridge: All three fountains are running and flowing properly. The lights and timers are functional and accurate. We cleared the outfall of blockages.
Additionally, we found fountain #4 in Switchback tripped as we drove through at the end of maintenance. We reset it and will continue to monitor its functionality for additional issues. All other fountains on the Canyon Lakes side of the community were running when we drove through at the end of today's visit.
Gate Maintenance:
Tuesday:
Checked status of repair bids.
Verified updated firmware installed on all callboxes and controllers.
Painted recently finished gate arms.
Thursday:
Mariners Bay:
Removed gate and all hardware. Replace screen, reinstalled hardware, and remounted gate. Tested and gate is functional.
Grease:
Couple of gates needed a touch of grease in the hinges.
7&8:
Trimmed the tree branches that were impeding the exit overview camera.
Friday:
Newlight Bend:
Witnessed the exit gate randomly open simultaneously as someone was entering through the entry gate. Troubleshoot the call button error with tech support.
7&8
Troubleshoot the call button error with tech support.
Mariners Bay:
Troubleshoot exit gate randomly opening and closing. Identified issue with the gate that was partially blocking the beam. Reset the limits on the exit operators. Gate operational.
|