October 16, 2026

{View as Webpage}

Alderman Reilly Reports

This Week at City Council

At the October 14th City Council meeting, Alders considered several measures affecting Chicago’s finances, public safety, and city services.


Bond Ordinance Veto Override Falls Short

The City Council fell one vote short of overriding Mayor Brandon Johnson’s veto of an ordinance that would have increased the number of votes needed to approve city borrowing. The measure would have raised the threshold from 26 votes to 30, requiring broader Council support before the City could take on additional debt. The Council originally approved the ordinance 32-15 last month, but the override attempt was unsuccessful, leaving the mayor’s veto in place. Alderman Reilly discussed the importance of fiscal accountability and the City’s borrowing practices during the meeting. Watch Alderman Reilly’s remarks at City Council.


Smart Streets Program Expansion Approved

The City Council approved an expansion of Chicago’s Smart Streets program, which uses automated cameras to enforce parking restrictions in bike lanes, bus lanes, crosswalks, and bus stops. Alderman Reilly introduced and helped pass the original pilot ordinance in 2023 and co-sponsored the expansion, continuing efforts to improve street safety and keep designated travel lanes clear for pedestrians, cyclists, and transit users. The expanded program is expected to roll out in phases, reaching citywide coverage by 2028. 


City Council Passes Honorary Designation for “Mother Jones Plaza”

The City Council approved Alderman Reilly’s ordinance designating the north side of East Wacker Place, between East Wacker Drive and North Wabash Avenue, as “Mother Jones Plaza,” honoring the renowned labor organizer and advocate for workers’ rights. A groundbreaking ceremony will take place Wednesday, October 28th, at 11:00 a.m. Community members are invited to attend.

Early Voting Begins in All 50 Wards

Monday, October 19, 2026

Early voting expands to all 50 Chicago wards on Monday, October 19th, ahead of the November 3rd General Election. In the 42nd Ward, voters can cast their ballots at Historic Lawson House, 803 N. Dearborn St. Voters may use any early voting location in Chicago, regardless of their ward of residence.


Early voting is also available at the Chicago Board of Elections Downtown Voting Supersite, 137 S. State St., and the Board of Elections office, 69 W. Washington St., 6th Floor.


For a complete list of early voting locations and hours, voter registration information, and details on voting by mail, visit chicagoelections.gov.

Clark Street Extended Outdoor Dining Ends October 31, 2026

The Clark Street Extended Outdoor Dining (EOD) program will conclude for the season on October 31st. Since May, participating restaurants along Clark Street between Grand Avenue and Kinzie Street have been permitted to operate outdoor dining platforms in the curb lanes while keeping traffic lanes open.


The modified program, first introduced in 2024, supports local restaurants while maintaining traffic flow through the corridor. As the season wraps up, diners and businesses should plan accordingly for the transition back to regular curbside use.

Open House Chicago: October 17-18, 2026

Open House Chicago returns October 17–18th, celebrating 16 years of architecture, culture, and community. This free annual festival offers behind-the-scenes access to more than 200 sites across the city, including historic buildings, architectural landmarks, and spaces not typically open to the public. Explore the places that make Chicago unique, discover hidden gems throughout downtown and beyond, and capture your favorite finds for a chance to win the 2026 OHC Photo Competition. Plan your weekend at Open House Chicago.

2026 Fall Bridge Lift Schedule

The City of Chicago began the Fall bridge lifts on Wednesday, September 30 at 9:30 a.m.



These lifts allow sailboats and other recreational boats to make their annual trip from the open waters of Lake Michigan to their winter storage facilities. The Chicago Department of Transportation (CDOT) oversees these bridge lifts each year, in the spring and fall seasons.  


Delays are expected at bridges from DuSable Lake Shore Drive to 18th Street. 


The Fall 2026 bridge lift schedule is as follows: 

  • Saturday, October 17 at 9:00 a.m.
  • Tuesday, October 27 at 9:30 a.m.
  • Thursday, October 29 at 9:30 a.m.
  • Saturday, October 31 at 9:00 a.m.
  • Wednesday, November 4 at 9:30 a.m.
  • Saturday, November 7 at 9:00 a.m.
  • Saturday, November 14 at 9:00 a.m.

CAPS Meetings

1st District: (312-745-4381 / CAPS.001District@chicagopolice.org)

  • There are no remaining 1st District CAPS meetings this month in the 42nd Ward.


18th District: (312-742-5778 / CAPS.018District@chicagopolice.org)

  • There are no remaining 18th District CAPS meetings this month in the 42nd Ward.


To find your appropriate beat to attend your CAPS meeting, please click here.

42nd Ward Traffic Closures & Construction Projects

Filming Notice

Chicago Med will be filming next Friday October 23rd between 3 am and 3 pm at the following locations:


  • Kinzie between State and Wabash 
  • South side of Kinzie from 21 W Kinzie to State
  • West side of State from 348 N State to Kinzie
  • South side of Wacker from State to Wabash
  • West side of Wabash from Wacker to Lake
  • Sidewalk of west side of State from Wacker to Lake


Helicopter Lift 103 E Oak Street

On Sunday, October 25, Midwest Helicopter will conduct a lift at 103 E Oak Street from 9 am to 11 am. During the helicopter lift, the following streets will be closed:


  • E Oak Street from N Rush Street to E Lake Shore Drive
  • N Michigan Avenue from E Bellevue Street to E Walton Street
  • E Lake Shore Drive from N Michigan Avenue to E Walton Street
  • Southbound Lake Shore Drive exit onto N Michigan Avenue 


CTA Infrastructure Maintenance in the Loop

Please be advised that CTA Infrastructure Maintenance Department will be making various repairs to the tracks and stations throughout the Loop and train traffic in the Loop will be shut down from Saturday 10/24 @ 2am until Monday 10/26 at @ 3am. Most work will be done during daytime hours, but some work may also be done overnight. Parking spots in the work zone area will be taped off as necessary, to allow our cranes and work vehicles to move and work freely. Businesses will remain open.


Canal Street Viaducts and Roadway Rehabilitation Construction Project - Adams to Madison

On Monday evening, October 12, there will be traffic staging and prep work in advance of the first weekend of demo work, which begins Friday, October 16, from 8:00 PM to 5:00 AM on Monday, October 19. There will be nighttime noise, and the demo work will start at Madison and work southbound. 



This work will continue on weeknights and weekends going forward. Please click here for more information.

 

Upcoming work and CTA service interruption/West Leaf Float

October 13–26: Crews will remove the existing west bridge leaf and install the pre assembled replacement leaf. This phase of work requires a continuous 24-hours-per-day, seven-days-per-week construction operation throughout the shutdown period.


CTA Green and Pink Line service: CTA Green and Pink Line service will be suspended between Clinton and Clark/Lake Stations for the full duration of the bridge-leaf replacement work, beginning October 13 and continuing through 4:00 am on October 26. The service interruption will be in effect 24 hours a day throughout the shutdown period, not only during daytime construction hours.

 

CTA will provide shuttle-bus service and other alternate-routing options during the closure. Riders should review CTA’s official information for current service details, shuttle stops, detours, and alternate travel options:



Upcoming CDOT Work - Lower Wabash Avenue from Illinois Street to Hubbard Street

CDOT is installing temporary shoring towers on the lower level of Wabash Avenue viaduct. On October 14th southbound traffic lanes on Lower level Wabash Avenue will close between Illinois and Hubbard Streets. Access to buildings from the lower level will be maintained via a detour from Illinois to Hubbard along State Street and back north on Lower Wabash, sidewalks will remain accessible. 


The shoring will remain in place until a repair can be completed on the deteriorated steel. Currently the repair work is estimated to begin in Spring 2027 and be completed by mid-2027.


Concrete Repairs on Upper-Level Randolph

Project: The project includes partial and full-depth concrete repairs to the north sidewalk and repairs to the underlying steel. Work will be performed by CDOT In House Construction.


Impacts: Beginning on Monday, October 5th, the north curb lane and the north sidewalk of upper-level Randolph will be closed between Field Blvd and the west building driveway at 400 E Randolph. The westbound bus stop at Field Blvd will be temporarily relocated west of the intersection. CDOT has coordinated this with CTA. Additionally, the intermediate-level sidewalk and curb lane will be closed for the duration of the project. The sidewalk on lower-level Randolph will also be closed for the duration of the project. The closure limits will be the same as on upper-level.


Reason: The north sidewalk and some underlying structural steel exhibit significant deterioration. Repairs are necessary to maintain a safe sidewalk walking surface and prevent further corrosion of underlying structural steel. Intermediate level closures are required to perform the steel repairs. Lower-level closures are required to protect pedestrians below from any potential hazards from the construction above.


Duration: This work will require full closure of the north sidewalk and a curb lane closure on upper-level Randolph for approximately 7 weeks beginning October 5th.


Sidewalk and Steel Repairs at Upper Randolph Street

Beginning on Monday, October 5th, the north curb lane and the north sidewalk of upper-level Randolph will be closed between Field Blvd and the west building driveway at 400 E Randolph. The westbound bus stop at Field Blvd will be temporarily relocated west of the intersection. CDOT has coordinated this with CTA.


The project includes partial and full-depth concrete repairs to the north sidewalk and repairs to the underlying steel. Work will be performed by CDOT In House Construction. The north sidewalk and some underlying structural steel exhibit significant deterioration. Repairs are necessary to maintain a safe sidewalk walking surface and prevent further corrosion of underlying structural steel.


This work will require full closure of the north sidewalk and a curb lane closure on upper-level Randolph for approximately 7 weeks beginning October 5th.


Hubbard Street Stairwell Closure

Alderman Reilly reported the rusted staircase at E. Hubbard Street and N. Wabash Avenue to the Chicago Department of Transportation (CDOT) due to pedestrian safety concerns. CDOT initially secured and closed the staircase. However, after pedestrians continued using the stairs, Alderman Reilly escalated the issue and urged CDOT to address the safety hazard. He is pleased to report that construction on the stairwell began this week. The stairwell will remain closed until repairs are complete, weather permitting, by spring 2027.


Rehabilitation Work to Sewers

The CIPP sewer rehabilitation work will continue this week in the 42nd ward. The contractor has an anticipated completion date of January 2027. Letter/flyers will be sent to residents located in the immediate area to provide notification of the work once they begin lining the sewer mains. 


  • E Ontario St from N Michigan Ave to N St Clair St
  • E Haddock Pl from N State St to 308' West of N Wabash Ave
  • N Lasalle St (West side sewer) from W Lake St to W Couch Pl
  • E Benton Pl from 204' East of N State St to 41' East of N Garland Ct
  • W Lake St from 208' East of W Wacker Dr to N Franklin St
  • N Wells St from 67' South of W Wacker Dr to 81' North of W Haddock Pl


"No parking" signs will be posted in the immediate area a workday prior to the start of any scheduled work. It will be necessary to close some lanes, but the streets will remain open to traffic. Work is typically completed during working hours and the Cure In Place Pipe (CIPP) being used is non-destructive and requires little to no excavation limiting impact to residents.


Cityfront Plaza Drive

The Cityfront Center West Association Repairs project began and will be continuing through October 2026 (weather permitting). This phase of the project will replace the steel curbs and waterproofing on both sides of Cityfront Plaza Drive. 


During construction, both northbound and southbound lanes of Cityfront Plaza Drive will remain open to automobile traffic while the construction area remains barricaded for public safety. During this time street parking will not be allowed on either side of Cityfront Plaza Drive. 


CTA #22 Temporary Bus Stop - Clark & Kinzie

As a result of the Clark Street Outdoor Dining Program, the southbound CTA #22 bus will now temporarily stop approximately 200' south of the intersection of Clark and Kinzie. This change will be in effect through October 2026. The regular southbound stop at the northwest corner of Clark and Kinzie will remain closed during the Outdoor Dining Program.


Public Assembly:


State / Lake CTA Station Reconstruction

As part of the ongoing State / Lake CTA Station Reconstruction project, a full closure of the southbound lanes has been implemented on State St, from Wacker Dr to Randolph St. Lake St, between State St and Wabash Ave, remains closed. Please click here for the detour map. This closure will remain in place until further notice.


Until the closure is lifted, southbound vehicles will be rerouted to Kinzie St, Clark St, and Washington St to re-access State St. Local business, driveway, and sidewalks access on State St will be maintained during the closures. The underground CTA Red Line train station at Lake will remain open. As a result of the closure on State Street, the following southbound CTA bus stops will be eliminated at State & Lake until further notice:


#2 - Hyde Park Express, #6 – Jackson Park Express, #10 – Museum Science & Industry, #29 – State, #36 – Broadway, #62 – Archer, #146 – Inner Lake Shore/Michigan Express, #148 – Clarendon/Michigan Express.