To allow interior work to proceed uninhibited by the severe weather, Wallworks was engaged by ARCO/Murray to construct a temporary enclosure around the entire building. The wood frame and reinforced plastic enclosure allowed work to proceed within a weather-tight and temperature-controlled temporary structure. .