|
Additionally, crews will conduct nightly electrical work beginning Monday, September 14 through Friday, September 18 at E. Hillsdale Boulevard and Eastbound SR-92/Mariners Island Boulevard, which will require traffic control at various locations and times.
Westbound SR-92 Mainline (1 Lane will be Closed)
- One lane on westbound SR-92 will be closed between the northbound US-101 off-ramp and the southbound US-101 loop ramp.
- Nightly on September 14 – 18
- Traffic control in place: 9:00 PM – 5:00 AM.
Southbound US-101 Mainline (1-3 Lanes will be Closed)
- 1 to 3 lanes will be closed, between the SR-84 junction and the SR-92 junction.
- Nightly on September 14 – 18
- Traffic control in place: 8:00 PM – 5:00 AM.
Northbound US-101 Mainline (1-3 Lanes will be Closed)
- 1 to 3 lanes will be closed, between the SR-92 junction and Broadway.
- Nightly on September 14 – 18
- Traffic control in place: 10:00 PM – 5:00 AM.
Eastbound SR-92 (from the NB/SB US-101 Connector Ramp to east of Mariners Island Boulevard)
- Nightly on September 14 – 18
- Traffic control in place: 10:00 PM – 7:00 AM.
|