|
SACRAMENTO – As work on the final phases of the $511.1 million U.S. Highway 50 (US 50) Multimodal Corridor Enhancement “Fix50” Project continues, a 12-hour lane reduction of the southbound Interstate 5 (I-5) to eastbound US 50 connector is scheduled from 9 p.m. Saturday, September 12 through 9 a.m. Sunday, September 13.
Construction crews will be working on the joint seal across the connector to eastbound US 50. Due to the location of the hinges, one lane from the southbound I-5 connector to eastbound US 50 will be closed for the safety of drivers and workers.
Closures: The #2 lane of the southbound I-5 connector to eastbound US 50 will be closed, the #1 lane will remain open. During this 12-hour period, eastbound US 50 lanes #5 and #6, the Riverside Boulevard on-ramp to eastbound US 50 and the 16th Street on-ramp to eastbound US 50 will also be closed.
Suggested Alternate Route: Drivers can use the southbound I-5 connector to westbound US 50/Interstate 80 and take the off-ramp to South River Road (Exit #3). Motorists will turn right on South River Road and then take the on-ramp to eastbound US 50.
|