Construction and Maintenance-related lane closures on Sate Road AIA in Hillsboro Beach are expected during the week of July 8 through July 15. Weather permitting, work will be done at the following locations. For around-the-clock, real-time, traffic information, visitwww.fl511.com. For updated lane closure information, please refer to www.d4fdot.com.
TRAFFIC IMPACT REPORT
July 8, 2022 through July 15, 2022
A1A Mobility Improvements Project in Deerfield Beach and Hillsboro Beach
Description:Project improvements milling and resurfacing the existing travel lanes, widening the roadway to accommodate designated bike lanes, adding a sidewalk along the west side of the roadway between Opal Towers and SE 10th Street, upgrading existing mid-block pedestrian crossings with Rectangular Rapid Flashing Beacon Signs, and raising the roadway elevation from 900 Hillsboro Mile to south of Le Baron Apartments. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or rguerrero@corradino.com.
Traffic Impact:One lane in each direction will be closed at a time, from the Hillsboro Inlet bridge to SE 10th Street, Monday through Friday, between 8 a.m. and 6 p.m. for milling and resurfacing operations. Flaggers will be present to direct motorists around the work zone.
State Road (SR) A1A Bridge over the Hillsboro Inlet Project in Pompano Beach
Description: Project consists of installing articulated concrete blocks (ACB) for erosion prevention within the navigable channel and the bridge foundation. Additional improvements include removing and replacing the existing bicycle plates and underwater cabling system. For more information, contact Community Outreach Specialist Jennifer Laxner at (954) 482-4190 or jennifer@valerin-group.com.
Traffic Impact: One southbound lane along State Road (SR) A1A will be closed Tuesday through Friday between 10:00 p.m. and 5:00 a.m. for bicycle plate installation.
Marine Traffic Impact: Half-channel closures can be expected for sediment containment during construction operations from 7:00 a.m. to 5:00 p.m. Access will be maintained at all times.