RELEASE: IMMEDIATE 



CONTACT:

Darragh Frye

540-907-8409 cell

July 2, 2026



VDOT FREDERICKSBURG DISTRICT WEEKLY TRAVEL ALERT

July 5 – 11, 2026

For updated information, check 511 Virginia

I-95 Northbound


Exit 143 (Aquia/Garrisonville)

Monday – Friday, 9 p.m.-4:30 a.m. Milling and paving near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin at 9 p.m. and double lane closures begin at 10 p.m.. All northbound lanes reopen by 4:30 a.m.

Caroline County


Route 1

Monday – Thursday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Fiber installation under permit.


Route 17 (Tidewater Trail) Northbound

Monday – Friday, 7 a.m.-5 p.m. Road resurfacing. Alternating lane closures between Hazelwood Lane and Mount Creek Bridge.


Route 207 (Rogers Clark Boulevard)

Monday – Friday, 8 a.m.-7 p.m. Milling and paving. Alternating lane closures on northbound Route 207 between Polecat Creek bridge and Devils Three Jump Road.


Route 676 (Devils Three Jump Road)

Monday – Friday, 7 a.m.-5 p.m. Road resurfacing. Alternating lane closures between Route 207 and Nelson Hill Road.

City of Fredericksburg


Route 1

Tuesday – Friday, 10 p.m.-5 a.m. Alternating lane closures on Route 1 northbound and southbound between Fall Hill Avenue and Falmouth Bridge. Intersection improvement project.


Fall Hill Avenue

Tuesday – Friday, 9 a.m.-3 p.m. and 10 p.m.-5 a.m. Alternating lane closures on Fall Hill Avenue between Bridgewater Street and Wallace Street. Intersection improvement project.


Princess Anne Street

Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Princess Anne Street between Route 1 and Amaret Street. Intersection improvement project.

Essex County


Route 17 Northbound

Monday – Thursday, 7 p.m.-5 a.m. Bridge repairs on Route 17 northbound between Tappahannock and the Caroline County line. Alternating lane closures.

Gloucester County


Route 14 (Adner Road)

Tuesday, Noon - 7 p.m. Mobile operation for pavement markings between Route 17 and King and Queen County line.



Route 17

Tuesday – Friday, 9 a.m.- 8 p.m. Bridge repairs with alternating lane closures near Route 17 Business intersection and Route 198 at Route 33 intersection.


Route 17 Northbound

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work with right lane closures at various locations near Route 198.


Route 606 (Ark Road)

Tuesday - Friday, 9 a.m. - 2 p.m. Mobile operation for paving with flaggers alternating one-way traffic near Route 17 and end of state maintenance.

King George County


Route 3

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Single lane closure on Route 3 eastbound near Route 694 (Lambs Creek Church Road). 

King and Queen County


Route 14 (Buena Vista Road)

Tuesday, Noon - 7 p.m. Mobile operation for pavement markings between Route 33 and Gloucester County line.


King William County


Route 360

Tuesday – Friday, 9 a.m.-3 p.m. Single lane closures on Route 360 eastbound and westbound at the intersection with Route 647 (Mill Road).

Lancaster County


Route 3

Tuesday – Wednesday, 9 a.m.- 7 p.m. Mobile milling and paving operation with alternating lane closures between Devils Bottom Road and Hawthorne Avenue.


Route 3 (Main Street)

Monday – Friday, 7 a.m.-5 p.m. Shoulder closures on Route 3 near the Route 200 intersections (Irvington Road and West Church Road) to install pedestrian crossing signal equipment.


Secondary Road Resurfacing

Monday – Thursday, 7 a.m.- 7 p.m. Surface treatment. Flagging crew will direct one-way, alternating traffic on the following routes:

  • Route 607
  • Route 614
  • Route 641
  • Route 671
  • Route 700
  • Route 738
  • Route 750
  • Route 775
  • Route 792
  • Route 1037
  • Route 1074

Mathews County


Route 626 (Ridge Road)

Tuesday, Noon - 7 p.m. Mobile operation for pavement markings between Route 14 and Route 198.


Middlesex County


Route 33 (General Puller Highway)

Tuesday - Friday, 9 a.m. - 8 p.m. Mobile operation for paving with alternating lane closures and flagging between Irmas Lane and Timberneck Road.

Northumberland County


Route 614 (Walmsley Road)

Monday – Friday, 7 a.m.-7 p.m. Mobile operation for paving with flaggers to alternate one-way traffic between Ridge Road and Route 360.

Richmond County


Route 690 (Menokin Road)

Thursday – Friday, 7 a.m.-7 p.m. Mobile operation for paving between County Bridge Road and Westmoreland County line. Expect alternating lane closures with flaggers alternating one-way traffic through the work zone.

Spotsylvania County


Route 1

Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure on Route 1 southbound between Ladysmith Road and Massaponax Church Road for fiber installation under permit.


Route 1 Northbound

Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.


Route 1 Northbound

Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Crossing Court and Market Street. for construction on I-95 exit 126 area improvements.


Route 1 Southbound

Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction on I-95 interchange area improvements.


Route 3 Westbound

Tuesday, 8:30 p.m.- 5 a.m. Right lane closure to widen the shoulder between Andora Drive and Montpelier Drive.


Route 3 Eastbound

Tuesday, 8:30 p.m.- 5 a.m. Right lane closure to widen the shoulder between Route 20 (Constitutional Boulevard) and Orange Plank Road.


Route 17 (Mills Drive)

Monday – Friday, 7p.m. - 6 a.m. Guardrail work. Alternating lane closures on southbound Route 17 near Route 608 (Massaponax Church Road) and Crossroad Parkway, as well as, Old Dominion Parkway and Massaponax Church Road.


Route 608 (Robert E. Lee Drive)

Monday – Friday, 9 a.m.-7 p.m. Paving, following recent shoulder widening work. Flagging crew will alternate one-way traffic between Route 208 and Catharpin Road.


Route 608 (Benchmark Road)

Monday – Thursday, 9 a.m.-3:30 p.m. Guardrail work. Flagging crew will alternate one-way traffic near Massaponax Creek.


Route 610 (Old Plank Road)

Tuesday - Friday, 9 a.m.- 3 p.m. One-way, alternating traffic between Ziyad Drive and Gordon Road. Road widening project.


Route 620 (Harrison Road)

Tuesday - Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Gordon Road and Old Plank Road. Road widening project.


Route 627 (Gordon Road)

Tuesday - Friday, 9 a.m.- 3 p.m. One-way, alternating traffic between Legacy Woods and Old Plank Road. Road widening project.


Route 634 (Flippo Drive)

Monday – Thursday, 9 a.m.- 5 p.m. Cape seal. Flaggers will alternate one-way traffic between Guinea Road and Massaponax Church Road.


Ashleigh Park subdivision

Monday – Tuesday, 9 a.m.-7 p.m. Application of shoulder stone. Flagging crew will direct traffic on various routes.

Stafford County


Route 1 Northbound

Monday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Bells Hill Road/Coal Landing Road.


Route 17

Monday – Friday, 9 a.m.-3 p.m. Median improvements under permit. Expect alternating northbound and southbound lane closures on Route 17 between Poplar Road and the entrance to the Cardinal Forest subdivision.


Route 17 Southbound

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Single lane closure near Tensley Lane.


Route 606 (Ferry Road)

Monday – Friday, 9 a.m.- 7 p.m. Paving. Flagging crew will direct traffic between Route 3 Business and White Oak Road.


Route 610 at Aquia Creek Bridge

Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Flagging crew will alternate one-way traffic at the Aquia Creek bridge.


Route 627 (Mountain View Road)

Thursday – Friday, 9 a.m.-7 p.m. Milling and paving. Flagging crew will direct one-way, alternating traffic between Carter Lane and Poplar Road, as well as Kellogg Mill Road and Wood Road.


Route 652 (Truslow Road)

Tuesday – Friday, 9 a.m.- 3 p.m. Milling and paving between Route 1 and Enon Road, as well as Berea Church Road and Poplar Road. Flaggers will alternate one-way traffic through the work zone.


Route 709 (Flatford Road)

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Winding Creek Road and Ashbrook Road.


Route 709 (Walpole Street)

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Winding Creek Road and Courthouse Road.


Route 751 (Hampton Park Road)

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Parkway Boulevard and Eustace Road.


Route 1264 (Parkway Boulevard)

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Flatford Road and Route 610 (Garrisonville Road).


Hampton Oaks subdivision

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes for road resurfacing.

Westmoreland County


Route 638 (Leedstown Road)

Monday – Friday, 7 a.m.-5 p.m. Road resurfacing. Flagging crew will alternate one-way traffic through the work zone between Rappahannock Road and Route 3.


Route 645 (Zacata Road)

Monday –Friday, 7 a.m.-5 p.m. Road resurfacing. Flagging crew will alternate one-way traffic through the work zone between Route 3 and Meadow Drive.

Additional Projects in Fredericksburg District 

Caroline County


Route 207 Northbound Bridge Rehabilitation

Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Northbound Route 207 traffic is diverted to cross the Mattaponi River using the Route 207 southbound bridge, with one travel lane open in each direction. During the closure, Route 207 northbound will remain closed until the completion of the project. Project completion expected in July 2026.

City of Fredericksburg


Route 1 at Fall Hill Avenue, and

Route 1 at Princess Anne Street and Hanson Avenue

Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Project completion expected in July 2026.

Gloucester County and Middlesex County


Route 17 Northbound Bridge Replacement at Dragon Run

Bridge replacement is underway at the Route 17 northbound bridge over Dragon Run at the Gloucester County and Middlesex County line. The new bridge will be wider, taller, and longer than the existing bridge, which was built in 1931. Route 17 northbound will remain reduced to a single lane at the bridge while crews construct crossovers for a traffic diversion to the Route 17 southbound bridge planned for summer 2026. Work zone barriers will continue to separate the left and right lanes of Route 17 northbound. The right lane closed in Dec. 2025 after a vehicle crash damaged the bridge rail and guardrail. Project completion expected in Dec. 2027.

King William County


Route 360 at Mill Road

Intersection improvement project to extend the existing left turn lane on Route 360 westbound at Mill Road to provide additional refuge for vehicles slowing down to turn left, and will keep traffic flowing in the through travel lanes on Route 360 westbound. Project completion expected in Aug. 2026. 

Lancaster County


Route 790 (Kamps Mill Road)

Route 790 (Kamps Mill Road) over Camps Millpond in Lancaster County has closed for motorist safety after a routine inspection of a culvert found deterioration. Motorists should use Route 3 as the recommended detour. VDOT will announce an estimated timeline to reopen the road to traffic once the emergency repair project schedule is finalized.

Mathews County


Route 14 over North End Branch Bridge Improvement

A $3.5 million bridge rehabilitation project is under construction to improve the condition of the Route 14 bridge over North End Branch. Temporary traffic signals are directing one-way, alternating traffic through the work zone. A vehicle width restriction of 10 feet is in place through the work zone. Project completion is expected in August 2026.

Northumberland County and Westmoreland County


Route 617 (Gardy's Mill Road)

Gardy's Mill Road is closed at Gardy's Millpond at the Northumberland and Westmoreland line with no reopening date. Gardy's Mill Road closed to through traffic for public safety in May 2025 due to a dam breach at the millpond. Water also damaged the road's travel surface. The Virginia Department of Transportation (VDOT) maintains the road, which runs on top of the dam maintained by the Virginia Department of Wildlife Resources (DWR). Travelers should use Route 202 (Hampton Hall Road) as a detour.

Spotsylvania County


I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.


Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.


Stafford County


Route 1 Bridge Replacement at Chopawamsic Creek

Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction is expected to be complete in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.


Route 1 at Telegraph Road and Woodstock Lane 

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page


Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page. 


Route 644 (Rock Hill Church Road) Bridge Replacement

Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.


Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665. 


(END)


View as Webpage

Facebook  Twitter  Instagram