VOL XXVI, ISSUE 2

 

Building Condition Assessments

The construction industry is at a crossroads, faced with a critical decision: replace or renew, demolish or restore. On one hand, new construction can bring exciting opportunities for innovation and growth. On the other hand, preserving and maintaining existing infrastructure can be a more sustainable and cost-effective approach. As institutions and organizations weigh their options, building assessments are becoming increasingly important in determining the best course of action.


By evaluating the condition of their facilities, decision-makers can strike a balance between replacing what's worn out and investing in new construction. In this edition of Plains Talk, we’ll share how building condition assessments play a critical role in informing decisions and shaping the future of facilities. 



In This Edition


From Assessment to Action: Morningside University Master Plan


Building Smarter: The Benefits of Regular Assessments


Balancing Building Needs With Budget: Thermopolis Middle School MEP System Assessment


Assessing Systems (for) Health: Virginia Gay Hospital Assessment, Master Plan & Upgrades


WPE News & Notables

Know someone who would benefit from our bi-monthly newsletter?


Click the button below to Subscribe on their behalf, or forward them this email and encourage them to check it out for themselves!

Subscribe!

From Assessment to Action

Morningside University Master Plan

In 2023, Morningside University embarked on a master planning initiative to ensure the long-term viability and efficiency of its campus buildings and infrastructure. To determine the best path forward, the Iowa university elected to conduct a comprehensive assessment of its existing facility inventory.


West Plains Engineering worked as part of a multi-disciplinary team to evaluate all 24 buildings across campus, including all academic and administrative spaces, residence halls, Rosen Field, Elwood Olsen Stadium and Rosen Verdoorn Sports Center. The primary MEP objective was to assess the current condition of the mechanical and electrical systems, estimate their remaining service life, and identify recommended repairs and replacements with associated cost estimates.


The project's findings supported the master planning activities by providing data-driven insights to inform decision-making for future investments. In essence, it allowed the university to know exactly where they were, so they could better plan where they wanted to go. By identifying and addressing infrastructure needs, Morningside University can optimize its resources and support its mission of providing a high-quality educational experience.



Jonathan Kennedy, P.E. (left) and Stuart Oster, P.E. (right) are the Electrical and Mechanical Department Heads, respectively, in our Sioux Falls office. Jon and Stu were the lead engineers on the assessment and master planning efforts at Morningside University.

Email Jon

Email Stu

Building Smarter

The Benefits of Regular Assessments

While new is nice, certain situations simply support a more conservative approach to construction. Some institutions and organizations have begun reevaluating their view on facilities management, considering maintenance and repair over new construction, or a combination of the two. Building assessments are becoming increasingly important in this decision-making process, allowing facilities managers to make informed choices about where to allocate resources.


Aging infrastructure is a significant driver of the increase in building assessments. Many facilities are reaching the end of their design life, requiring upgrades and repairs to ensure they continue to function safely and efficiently. By conducting regular assessments, facilities managers can identify areas of need and consider the pros and cons of repairs versus replacement.


Budget constraints are also playing a role in the shift toward building assessments. Institutions are looking for ways to stretch limited resources. By understanding the condition of their facilities, managers can optimize resource allocation, prioritize repairs, and make informed decisions about investments.


The benefits of building assessments extend beyond cost savings and efficiency gains. They also enhance occupant safety and satisfaction. By identifying and addressing potential issues before they become major problems, facilities managers can create a safer, healthier environment for building occupants. This is particularly important in educational and healthcare settings, where occupant well-being is paramount.


Supply chain issues may also have a lesser impact on the maintenance and repair (M&R) type projects that can result from these assessments than new construction. Building reports allow facilities managers to prioritize critical assets, creating predictable inventory so owners can avoid supply chain disruptions by stocking up on essential equipment in advance. This minimizes delays and cost overruns.


As the industry continues to evolve, it's clear that building assessments will play a critical role in shaping the future of facilities management. By prioritizing M&R work, institutions can support the longevity and efficiency of their existing infrastructure, reduce waste, and minimize environmental impact. 

Article authored collaboratively by WPE engineers and staff.

Balancing Building Needs With Budget

Thermopolis Middle School MEP System Assessment

West Plains Engineering recently completed a comprehensive assessment of the MEP systems at Thermopolis Middle School for the Hot Springs County School District in Wyoming.


Our goal was to identify potential issues before they become major problems, allowing the district to prioritize maintenance and upgrades effectively. We identified areas where equipment is nearing or has exceeded industry standard lifetimes, potentially impacting efficiency and reliability. We also evaluated current equipment efficiencies compared to modern standards and highlighted environmental concerns, such as refrigerant usage.


Our assessment of the school facility revealed:


  • Domestic piping was severely scaled, reducing water pressure and flow, with a booster pump in failing condition exacerbating the issue.
  • Unit ventilators were malfunctioning, causing temperature complaints, with rooftop condensing units in poor condition due to age and weather exposure.
  • Air handling units in the gym were installed in a way that made regular maintenance difficult.
  • Lighting systems, including exterior security lights and interior egress fixtures, needed replacement.
  • The fire pump, critical for emergency sprinkler system function, was in failing condition due to poor water quality.


Our final report was used to provide the school district with a detailed roadmap for addressing critical equipment and system needs. Our findings will help prioritize maintenance and upgrades, ensuring alignment with budgetary considerations over the next several years.

Matt Stroh, P.E., CHD is a Professional Mechanical Engineer and the manager of our Casper office. He was the Lead Mechanical Engineer on this assessment.


Email Matt

Assessing Systems (for) Health

Virginia Gay Hospital Assessment, Master Plan & Upgrades

West Plains Engineering recently completed a comprehensive HVAC upgrade project at Virginia Gay Hospital (VGH) in Vinton, IA focused on improving indoor air quality, enhancing infection control, and ensuring compliance with industry standards. The project was part of a larger master planning effort with VGH to help the organization plan for the future of its facilities and operations.


The effort began with an initial study phase, where we assessed the existing condition of the hospital and nursing/rehab building air handling systems, evaluated compliance with Facility Guideline Institute and ASHRAE standards, and determined the best options for replacement with minimal disruption to facility operations.


The report identified several recommended upgrades, and we worked with VGH to determine which measures most closely aligned with their facility goals and budget. Ultimately, the design included:


  • Replacing aged equipment past its expected useful life
  • Installing new air handling units with advanced features
  • Upgrading boilers and chiller systems for improved efficiency
  • Implementing UV-C lights and Needlepoint Bi-Polar Ionization for enhanced infection control
  • Redesigning waiting areas to exhaust air to the exterior
  • Upgrading air distribution and temperature controls


VGH now boasts a state-of-the-art HVAC system that supports the health and well-being of patients, staff, and visitors. The upgraded system ensures a safer, healthier environment for everyone, and will serve the hospital well for years to come.

Mike Drahos, P.E. is a Professional Mechanical Engineer and the manager of our Cedar Rapids office. He has more than 30 years of experience and an extensive history working in healthcare system assessment and design. He was the Lead Mechanical Engineer on this project


Email Mike

WPE Projects in the News

Check out some of our projects featured on social media and the news!

Bell Tower Lofts

Marion, IA

Hyatt Place Downtown

Rapid City, SD

Outdoor Campus East

Sioux Falls, SD

Shooting Sports Complex

Rapid City, SD

Traffic, Light & Power Bldg

Sioux Falls, SD

Preacher Smith's

Deadwood, SD

Welcome Kelley Langley!


We're excited to welcome Kelley Langley as our new Accounting Manager! Kelley will take over for Steve Comer, who's heading into retirement (cheers to Steve!). She brings with her 25+ years of finance experience, including an extensive background in financial management, payroll administration, compliance and process improvement. 

Welcome Bill Bruns!


Bill Bruns joined our Cedar Rapids team as is an Electrical Designer with 25 years of experience in electrical engineering and project management. He is a graduate of the University of Iowa, which means one more Hawkeye in our ranks.

The Welcome Wagons Rolls On...

We also expanded our team of interns in March with the addition of Makinleigh Wallenstein. Makinleigh joins our Sioux Falls office as a CAD Tech intern as she works toward finishing her degree at Southeast Technical College this Spring.


Welcome to WPE everyone!


(And stay tuned, because there are lot more new faces coming soon!)

Kindness Ranch Receives $1,000 Casper Donation

Our Casper office selected Kindness Ranch Animal Sanctuary as their 2024 Ways to Give Community Investment recipient. The organization was nominated by CAD Technician, Anthony Barella, who has a long and personal history with the non-profit. Anthony’s childhood was filled with adventures with his father and their beloved Beagle, Lady. After Lady's passing, Anthony searched for a new Beagle companion and discovered the sanctuary for rescued research animals.


We're honored to support Kindness Ranch's incredible efforts and grateful for the opportunity to make a positive impact in our community.


But Wait...There's More!

If you aren't currently following us on social media, you're missing out on daily updates from around our company (plus a few clever memes and wacky anecdotes for good measure).


Click any of the social icons below to see what we've been up to recently and don't forget to Like or Follow!

Facebook      LinkedIn      Instagram

This publication is partially generated using AI but edited and verified by human experts.

 
Rapid City, SD  |  Sioux Falls, SD  |  Casper, WY  |  Cedar Rapids, IA
CHECK US OUT ONLINE
Facebook  Linkedin  Instagram
SUBSCRIBE
Visit our website