Councilmember Justin L. Jones
|
|
May 24, 2024
Greetings Neighbors,
Join tomorrow's festivities at La Pintoresca Park for Family Fun Day from 11 a.m. to 3 p.m. Additionally, USC Pacific Asia Museum is offering free admission for the month of May in celebration of AAPI Heritage Month - be sure to stop by and see the new mural, titled "The Momentous Moment in Time of Passage and Landing."
Pasadena residents and businesses are reminded that City Hall and many City services and administrative business offices will be closed on Monday, May 27, in observance of Memorial Day. Please read details below.
City Council will not meet on May 27. The next council meeting will be held on Monday, June 3. Pasadena City Council will hold a public hearing on Monday, June 3, 2024, at 5:30 p.m. to consider the adoption of adjustments to the existing water rates and rate structure. The public is encouraged to participate. Additional information and "Bill Estimator" can be found in this newsletter below.
As a reminder, to view the recommended operating budget visit the city website: https://www.cityofpasadena.net/finance/operating-budgets/ Share any comments, ideas and/or recommendations for consideration via the public engagement form, or share your questions and input with my office.
In this newsletter, you will find information on:
- Family Fun Day
- USC PAM - Free Admission for the month of May
-
Paseo de Seguridad Familiar y Picnic/Family Safety Ride and Picnic
- Memorial Day Commemoration
- Pasadena Minimum Wage Set to Increase on July 1, 2024
- Proposed Robinson Family Memorial
- Pasadena Demonstration Gardens Self-Guided Tour
- Playhouse Village: Play in the Park
- Pride Flag Raising
- Accessible Housing Town Hall
- Glenarm Street Water Main Infrastructure Improvements Scheduled to Begin June 2024
- Sensory Art & Water Play
- Jackie Robinson Community Center - Building Dedication
- Home Enhancement Loan Program (HELP)
- Parent Cafe: Building yourself up one block at a time
- Message from the Fire Marshal
- City Manager's Weekly Newsletter
- District 3 Community Meeting Recording - April 30
- Storm Damage Repairs Continue on Two Sections of Angeles Crest Highway
- Off the Shelf May/June 2024
- Microsurfacing Schedule
-
Video: opening of the public hearing on the City’s Operating Budget
- Join The Ripple Effect: Celebrate Water Awareness Month in May
-
Pasadena Water and Power (PWP) Fraud Alert/Alerta de fraude
- Water Rates Community Meetings
- Pasadena Water & Power Issues Notice of Public Hearing (June 3rd) for Water Rate Structure and Adjustments
- Pasadena Water & Power (PWP) Unveils Online “Bill Estimator”
- PWP Water Rates Virtual Community Meeting April 2024—Recording
- Educational workshop video on the new rental housing laws
- Community Classes and Workshops for Older Adults
- Dena Juneteenth, June 15
- Amplify: Reconnecting Communities' Oral History Project and Survey
- Brenner Park Playground Improvement Project
- Pasadena Paramedic Subscription Service
- City Service Center - One Call to City Hall
Warmly,
|
|
Councilmember
Justin L. Jones
|
|
Memorial Day Closures and Reminders,
Proposed Robinson Family Memorial, updates and more!
|
|
 |
Family Fun Day
Saturday, May 25
11 -3p.m.
La Pintoresca Park
45 E. Washington Blvd.
Enjoy arts and crafts, tiny tot area, bubble zone, free food, bingo, skateboarding expo, and much more!
|
|
 |
 |
USC Pacific Asia Museum
FREE ADMISSION for the Month of May in celebration of AAPI Heritage Month.
|
|
 |
|
Paseo de seguridad familiar y picnic,
27 de mayo
¿Tiene curiosidad sobre el carril bici protegido de Union Street? ¿Tiene preocupaciones sobre la seguridad? Traiga a los niños a este paseo familiar especial.
lunes 27 de mayo de 2024
10:00 a. m. - 12:00 p. m.
Playhouse Village Park - 701 Union St
Este evento es parte del #PasadenaBikeMonth hecho posible por el Departamento de Transporte de la Ciudad de Pasadena, Day One, y la Coalición de Calles Completas de Pasadena. Los detalles de todos los eventos se encuentran en bit.ly/PasadenaBikeMonth
|
|
Family Safety Ride and Picnic, May 27
Are you curious about the Union Street protected bike lane? Do you have concerns about safety? Bring the kids along for this special family ride.
Monday, May 27, 2024
10:00 AM - 12:00 PM
Playhouse Village Park - 701 Union St
This event is part of #PasadenaBikeMonth made possible by the City of Pasadena Dept. of Transportation, Day One, and the Pasadena Complete Streets Coalition. Details for all events are at bit.ly/PasadenaBikeMonth
|
|
City of Pasadena Announces Memorial Day Closures and Reminders
PASADENA, Calif.—Pasadena residents and businesses are reminded that City Hall and many City services and administrative business offices will be closed on Monday, May 27, in observance of Memorial Day, a national day of remembrance for the brave men and women of the U.S. military who died in the line of duty. Specific closures and exceptions are noted below.
Pasadena Police and Fire Departments will continue to be staffed for all patrol, jail, fire, paramedic and other emergency services. For life-threatening emergencies, dial 9-1-1. If you see something, say something; report suspicious activity to the police department at (626) 744-4241.
City Council will not meet on May 27. The next council meeting will be held on Monday, June 3.
The City of Pasadena will have trash collection on Monday, May 27. There will be no delay to trash, recycling and yard waste collection; however, bulky item pickups will not be available.
Pasadena Water and Power (PWP) will also be closed. Residents and businesses with any power emergencies should call the Power Emergency Line at (626) 744-4673. For water-related emergencies, call the Water Emergency Line at (626) 744-4138. PWP’s regular Customer Call Center will be closed for the holiday, but customers can access their accounts and pay bills online at PWPweb.com or by calling (626) 744-4005.
The City’s Municipal Services Payment Center and Parking Office will be closed on May 27. All parking meters not posted as a "No Parking" zone will be free on May 27, and time limits will not be enforced. Violations for overnight parking, red curb parking, "No Parking" zones, and blocking fire hydrants will be enforced. All regular enforcement will resume Tuesday, May 28.
Pasadena Transit bus service and Dial-A-Ride transportation will not operate on Monday, May 27. Regular service will resume Tuesday, May 28.
All Pasadena Public Libraries will be closed on Sunday, May 26, and Monday, May 27, and will reopen at 10 a.m. on Tuesday, May 28.
All recreation and community centers operated by the City’s Parks, Recreation and Community Services Department will be closed on Monday, May 27, but all parks will be open for picnics, fun and play. No site reservations are being accepted for the holiday.
The City of Pasadena and the Pasadena Veterans Day Committee will honor the sacrifice of our fallen heroes at the Pasadena Memorial Day Commemoration on Monday, May 27 from 10:30 a.m. to 1:30 p.m. at Memorial Park, 85 E. Holly St. The ceremony is open to the public and will include the acknowledgment of veterans from Pasadena who lost their lives in combat, a missing man formation flyover by the Condor Squadron, and funeral honors performed by the 2nd Battalion, 23rd Marines. The event is sponsored by the City of Pasadena Parks, Recreation and Community Services Department, The Rose Bowl Stadium, and the Pasadena Management Association.
Stay connected with the City of Pasadena! Visit us online at CityOfPasadena.net follow us on Twitter at @PasadenaGov, and Instagram and Facebook at @CityOfPasadena; or call the City Service Center Monday through Friday during business hours at (626) 744-7311.
|
|
|
Pasadena Minimum Wage Set to Increase on July 1, 2024
PASADENA, Calif.—The City of Pasadena wants local employers and employees to know that the city’s minimum wage is set to increase from $16.93 per hour to $17.50 per hour for all businesses, regardless of size, on July 1, 2024.
On March 14, 2016, the Pasadena City Council adopted its own minimum wage ordinance. Pasadena’s minimum wage rules were approved prior to the State of California’s action, and the state’s minimum wage does not preempt Pasadena’s minimum wage ordinance. Pasadena’s minimum wage is different from the state’s and provides for a steeper increase in the minimum wage. After a series of prescribed annual increases, Pasadena’s minimum wage is now adjusted by an amount equal to the change in the consumer price index. The new wage rate will remain in effect until June 30, 2025, when it will again be adjusted.
On April 1, 2024, the minimum wage set by the State for all “national fast-food chain” establishments is $20.00 per hour. California’s fast-food worker’s minimum wage applies to all national fast-food chain establishments within the geographical boundaries of Pasadena and supersedes the local minimum wage rate if the employer meets the definition of “national fast-food chain.” For more information about California’s minimum wage for fast-food workers please visit the California Department of Industrial Relations at Dir.Ca.Gov/Dlse/Minimum_Wage.htm.
Recognizing the importance of the local minimum wage and particularly its impact on low-wage earners and members of the immigrant community, Planning & Community Development Director Jennifer Paige noted that workers at all levels bring vibrance and vitality to the local economy. Employees can share in Pasadena’s prosperity made possible, in large part, by the City Council’s vision in requiring payment of a fair and just minimum wage.
Stay connected with the City of Pasadena! Visit us online at CityOfPasadena.net follow us on Twitter at @PasadenaGov, and Instagram and Facebook at @CityOfPasadena; or call the City Service Center Monday through Friday during business hours at (626) 744-7311.
|
|
|
|
Proposed Robinson Family Memorial
|
The City is proud to announce the proposed installation of the Robinson Family Home Memorial and Historical Marker at 123 Pepper Street.
The goal of this project would not only be to recognize the home in which Mack and Jackie Robinson grew up but to honor Mallie Robinson and her family as a whole. Currently, the site is memorialized by a plaque imbedded on the concrete parkway in front of the house. At the urging of the late Councilmember John J. Kennedy, staff was asked to develop a more visible memorial that better signified the site and could be a point of pride for the city and the neighborhood. The proposed memorial will stand approximately five feet tall, is ADA accessible, and will have three plaques with language that honors the entire Robinson family, including Mack and Jackie. City staff worked closely with Robinson family members in developing the language for the plaques.
This project was presented to the Northwest Commission at their May 14, 2024 meeting, and was well received. It will be presented to the City Council on June 10, 2023.
|
|
|
|
Pasadena Demonstration Gardens
Self-Guided Tour
Join the Ripple Effect: May is Water Awareness Month.
|
|
|
|
Playhouse Village invites the community to get ready to unleash your competitive spirit and join us for an unforgettable day of fun and games at Play in the Park, presented by the Playhouse Village Foundation! Mark your calendars for Sunday, May 26th, from 1 PM to 4 PM, and head over to Playhouse Village Park for an epic experience.
GAME ON! Challenge your friends and family to GIANT versions of your favorite classic games. Whether you're a board game enthusiast or just looking for a fun-filled day outdoors, Play in the Park has something for everyone. Our oversized game lineup includes giant Monopoly, Sorry, Scrabble, Candyland, Checkers, Uno, Operation, blocks, and many more.
|
|
Playhouse Village Park is located at 701 E Union St, Pasadena, CA. For more information about Play in the Park, visit our website at www.playhousevillage.org/play or contact us at (626) 744-0340.
|
|
|
|
The City of Pasadena’s Pride Flag Raising Ceremony in honor of Pride Month on Monday, June 3 at 12:30 p.m. at City Hall.
For more information, please contact:
Araceli Mellem at AMellem@CityofPasadena.net or call (626) 744-7210
|
|
|
|
|
|
The City of Pasadena Accessibility and Disability Commission is hosting a Town Hall Meeting to hear from the Community about accommodations that would help create accessible housing of all types, including Accessory Dwelling Units (ADUs). The input provided at this meeting will be used by the Commission as they create an Accessible Housing Guide for community use.
The Commission looks forward to hearing from people with disabilities, their family members, caregivers, service providers, or anyone with ideas on improving accessibility for all.
Date: Thursday, May 30, 2024
Time: 7-9 PM
Location: City of Pasadena Council Chambers, 100 N. Garfield Ave., Room S249
Join Virtually:
Telephone:
Dial(for higher quality, dial a number based on your current location):
+1 669 444 9171 US
+1 669 900 6833 US (San Jose)
Webinar ID: 161 482 446
If you are not available to join the meeting in-person or virtually, you can still provide your thoughts by completing this brief survey.
For more information or to request a disability-related accommodation, please call (626) 744-3829 or e-mail sgoldman@cityofpasadena.net.
|
|
Glenarm Street Water Main Infrastructure Improvements
Scheduled to Begin June 2024
PASADENA, Calif.— Pasadena Water and Power (PWP) will be replacing a 100-year-old water main along Glenarm Street as part of a major water infrastructure upgrade beginning in June 2024. The project will span from Arroyo Parkway to El Molino Avenue along Glenarm Street. When completed, the upgrades will enhance water service reliability for the area.
To minimize impacts on area residents and businesses, construction efforts will be contained to approximately one block at a time. Occasional, temporary lane closures will happen during work hours. Traffic control signage and flag workers will assist motorists when traffic is temporarily reduced to only one driving lane. Otherwise, at least one driving lane will remain accessible in both directions. Work is scheduled to occur Monday through Friday, 9 a.m. to 4 p.m.
During construction, crews will use a variety of heavy equipment, including excavators, backhoes, loaders, and construction trucks, which may cause some noise and dust in the area. Traffic signs and delineators will be used to minimize the impact of traffic flow along Glenarm Street. PWP asks residents to please observe and adhere to posted no parking zones, construction signs, and flag workers.
Travel lanes will be reduced during phases of construction. Left/right turns will be restricted at certain intersections. In addition, during certain phases of construction, the 110 Freeway on-ramp and off-ramp at Glenarm Street and Arroyo Parkway, will be closed. To expedite travel and access to the 110 FWY, please detour and use Fair Oaks Avenue, or Orange Grove Boulevard on ramps. To expedite east/west travel, please use California Boulevard or Del Mar Boulevard. Please expect traffic delays during construction. Pasadena Transit Route 20 will detour and use Raymond Avenue instead of Arroyo Parkway to avoid delays.
Construction will intermittently affect water service. Notices of any water interruptions will be given at least 48 hours in advance, and special efforts will be taken to keep any other inconveniences to a minimum. For more information, please visit PWP’s website, which will be updated regularly as the project progresses, at PWPweb.com or call PWP Water Distribution at (626) 744-4456.
About Pasadena Water and Power
Pasadena Water and Power (PWP) provides electricity to more than 65,000 customers within Pasadena. PWP delivers water to nearly 38,000 households and businesses in Pasadena and adjacent communities in the San Gabriel Valley. As a community-owned utility, PWP is a not-for-profit public service owned and operated by the City of Pasadena for the benefit of its customers and the community.
|
|
Sensory Art & Water Play
Saturdays, May 25, June 22 and July 20
10:30 - 11:30am
Jefferson Branch Library
1500 E. Villa St.
To register contact: Marie Plug
MPlug@CityofPasadena.net
(626) 744-4027
|
|
Save The Date:
Jackie Robinson Community Center
1020 N. Fair Oaks Ave.
50th Anniversary of Building Dedication
Saturday, June 15, 2024
12-2pm
|
|
 |
Need to Make Repairs to Your Home?
The Home Enhancement Loan Program (HELP) provides loans up $100,000 to low-income single-family owner-occupied households for necessary repairs and rehabilitation to bring their house up to code, eliminate critical health and safety concerns, replace systems that are at the end of its useful life, increase efficiency and accessibility thereby enhancing livability and preservation of the home. The 20-year loans are 0% interest with deferred payments during the term.
Virtual Community Workshop
June 5, 2024 at 6:00 pm
|
|
 |
 |
Parent Cafe:
Building yourself up one block at a time.
Thursday, June 6
5-7:30pm
Pacific Clinics Early Head Start
136 W. Peoria St.
To register, visit: Bit.y/LINK or
call (626) 744-6386
|
|
 |
|
MESSAGE FROM THE FIRE MARSHAL
It is vital that Pasadena residents and property owners are vigilant against dry, poorly maintained vegetation which creates an extreme fire danger to their homes. Well-placed, well-maintained vegetation beautifies and controls erosion in residential neighborhoods. Poorly maintained vegetation can be a volatile fuel for fast-spreading wildfire – an invitation to disaster.
Property owners and residents can help protect their homes by joining in partnership with their neighbors and the City to ensure compliance with the City’s Hazardous Vegetation Ordinance. The goals are to maintain trees and vegetation that beautify and benefit a property, and to remove hazardous vegetation that provides a volatile fuel supply for wildfire. These preventive measures are very important for every resident of Pasadena, where the fire season is throughout the year.
The Pasadena Fire Department wants to work with you to create the most fire-safe community possible. Please join us by completing your brush clearance and ornamental vegetation maintenance. For additional information, please contact the Pasadena Fire Department at (626)744-4668, or visit our website at CityOfPasadena.net/Fire.
FIRE PREVENTION PARTNERSHIP
A working partnership between property owners, their neighbors and the City of Pasadena is the best defense against disastrous fires. Pasadena’s Hazardous Vegetation Ordinance is designed to minimize fire danger by controlling the density and location of flammable vegetation. The ordinance does not recommend indiscriminate clearing of native chaparral and other vegetation that plays an important role in erosion control. Fire hazard reduction can be achieved if all members of the Fire Prevention Partnership do their part.
The ordinance requires property owners to:
Remove all dead trees and keep grasses and weeds mowed within 100 feet of any building (including those on adjacent property), and within 10 feet of any roadway used for vehicular travel. This does not apply to ornamental shrubbery, trees or cultivated ground cover.
Grasses and other vegetation located more than 30 feet from any building and less than 18 inches in height may be maintained where necessary to stabilize soil and prevent erosion. Large trees and shrubs in that area should be 18 feet apart.
Remove leafy foliage, dead wood, combustible groundcover, twigs or branches within three (3) feet of the ground from mature trees located within 100 feet of any building or within 10 feet of any roadway used for vehicular travel.
Remove dead limbs, branches and other combustible matter from trees or other growing vegetation adjacent to or overhanging any structure.
Maintain five (5) feet of vertical clearance between roof surfaces and any overhanging portions of trees.
Remove any portion of a tree that extends within 10 feet of a chimney or stovepipe.
Trim and maintain all vegetation away from curbline up to a height of 13.5 feet to accommodate emergency vehicles.
These minimum standards are established to manage both fire and erosion hazards and to protect lives and property. Pasadena Fire Department personnel may require greater protection levels in high danger areas.
ENFORCEMENT
The goal of the Pasadena Fire Department is to establish a fire-safe community through voluntary compliance of informed property owners and residents. Fire Inspectors assess properties to determine hazard levels. Owners of property on which a hazardous vegetation condition exists are required to correct the problem. If a property owner does not comply with the ordinance, a contractor will be hired to complete the necessary work. Inspection and administration fees will be charged and the cost of correcting the hazard will be recovered as stated in the ordinance.
Enforcement involves several steps (PMC 14.29 Flammable Vegetation):
A. The Fire Department shall inspect, upon such schedule as its resources permit, those properties on which flammable vegetation is present or on which the possible presence of flammable vegetation may pose a potential fire hazard to persons or property.
B. A fee in the amount of $190.00 is charged to each property inspected. This fee will be waived if there are no violations found during the inspection. If violations are found, the fee will be waived if the property owner corrects the problem within thirty (30) days.
C. In the event that the violations identified to the property owner are not abated within the allotted time period, the property owner shall be charged a reinspection fee of $810.00 (in addition to the initial inspection fee of $190.00). These fees compensate the City for time spent on the inspections, including evidentiary photography, inspector follow up, additional documentation, and processing of misdemeanor charges if necessary.
D. Should more than two (2) reinspections of a parcel be necessitated by the failure of the property owner to comply with the provisions of this chapter, an additional fee of $386.00 will be assessed foreach such additional inspection. (Ord. 6444 § 2 (part), 1991)
ALL FEES SUBJECT TO CHANGE
REFER TO PASADENA FIRE DEPARTMENT WEBSITE FOR CURRENT INSPECTION FEES
EMERGENCY ENFORCEMENT
The Flammable Vegetation Ordinance provides that emergency action may be taken where the Fire Chief or designee determines that the condition of a structure or property poses an immediate hazard to life or property.
In such cases, efforts will be made to contact the property owner to request voluntary removal of the hazard at least 24 hours before abatement work is done.
THE PASADENA FIRE DEPARTMENT CONDUCTS HAZARDOUS VEGETATION INSPECTIONS ANNUALLY BEGINNING ON MAY 1ST.
Fire Zone Map:
For additional information, call:
CITY OF PASADENA
FIRE DEPARTMENT
215 N. Marengo Ave., #195
Pasadena, CA 91101-1530
Phone: 626-744-4668
|
|
The web-based, City Manager's Weekly Newsletter is now live.
The City Manager’s Weekly newsletter provides information on departmental programs and services as well as upcoming events. The newsletter is also used to expand upon any issues which may have been raised during previous City Council meetings.
|
|
|
|
District 3 Community Meeting Recording
April 30. 2024
Grabación de la reunión comunitaria del Distrito 3
30 de abril de 2024
|
|
Storm Damage Repairs Continue on Two Sections of Angeles Crest Highway
Angeles National Forest- The California Department of Transportation (Caltrans) announces storm damage repairs to two segments of State Route 2 (Angeles Crest Highway, SR-2) in Angeles National Forest will continue with highway closures in place.
Segment 1:
The section of SR-2 from just north of Mt. Wilson Red Box Road to just south of Upper Big Tujunga Canyon Road has been closed since March of 2023. This segment may remain closed through July to complete repairs to a slope drapery protection system.
The detour to access Angeles Crest Highway north of Upper Big Tujunga Canyon Road has been Angeles Crest Highway to Angeles Forest Highway to Upper Big Tujunga Canyon Road back to Angeles Crest Highway. However, Upper Big Tujunga Canyon Road is owned and maintained by the County of Los Angeles. Check https://dpw.lacounty.gov/roadclosures/ for road closures and lane restrictions before using Upper Big Tujunga Canyon Road as a detour route.
Segment 2:
The section of SR-2 from Islip Saddle to Vincent Gulch has been closed since November of 2022. Work here was discontinued over the winter due to hazardous road conditions. Work will resume after Memorial Day weekend and includes construction of retaining walls and slope repair at two locations within the closure. This section is expected to remain closed into fall.
Caltrans appreciates the patience and cooperation of the public as they continue to repair Angeles Crest Highway and make it safe and accessible to the public. Go to https://twitter.com/CaltransDist7 for updates.
|
|
|
|
|
|
City of Pasadena Microsurfacing Schedule
|
|
|
|
Below is the video of the presentation for the opening of the public hearing on the City’s Operating Budget:
|
|
Join The Ripple Effect: Celebrate Water Awareness Month in May
PASADENA, Calif.— During the month of May, Pasadena Water and Power (PWP) joins utilities across the nation in celebrating Water Awareness Month, an annual outreach campaign to raise awareness about the value of one of Southern California’s most precious natural resources: water. Throughout the month, PWP is highlighting water sustainability and resilience in the community with educational events, tours, and workshops.
Water Awareness Month is also part of PWP’s The Ripple Effect campaign, which includes inviting the community to become local water stewards for Pasadena and the region. All events are free and open to the public.
Garden Show and Tell
Now - Friday, May 31
Members of the community are encouraged to share photos and information on their garden's transformations from thirsty turf to drought-tolerant beauty. Every week, a garden will be selected and featured on PWP’s website and social media channels as the Garden of the Week. Must be a PWP customer to enter. Participants will receive a free native plant while supplies last. To participate, please visit PWPweb.com/TheRippleEffect and click on the Garden Show and Tell tile.
“Water is Life” Art Contest
Submissions due Friday, May 31
All K-12 students attending school in Pasadena are encouraged to submit artwork for the annual “Water is Life” contest, sponsored by PWP and the Metropolitan Water District of Southern California. Each year, participating students submit artwork portraying a water-wise theme, along with a short message about water conservation. All entries must be submitted by May 31, 2024, via email or mail. Visit PWPweb.com/ArtContest to learn more.
Self-Guided Walking Tour of PWP-Sponsored Community Demonstration Gardens
Follow a self-guided tour map of unique gardens that demonstrate the beauty and diversity of drought-tolerant, native plant landscapes. Learn about water efficient landscaping and water capture features like hügels, berms and swales, dry streams, and rain barrels. A digital map is available online at PWPweb.com/TheRippleEffect.
For more information about these events, Pasadena’s water supply, infrastructure, conservation resources and programs, visit PWPweb.com/TheRippleEffect.
About Pasadena Water and Power
Pasadena Water and Power (PWP) provides electricity to more than 65,000 customers within Pasadena. PWP delivers water to nearly 38,000 households and businesses in Pasadena and adjacent communities in the San Gabriel Valley. As a community-owned utility, PWP is a not-for-profit public service owned and operated by the City of Pasadena for the benefit of its customers and the community. Its priorities are reliability, responsiveness to customers, competitive rates, and environmental stewardship.
Stay connected to the City of Pasadena! Visit us online at CityOfPasadena.net; follow us on Twitter at @PasadenaGov, and Instagram and Facebook at @CityOfPasadena; or call the City Service Center Monday through Friday during business hours at (626) 744-7311.
|
|
Fraud Alert
People posing as Pasadena Water and Power (PWP) employees are trying to enter homes claiming to need to test water. Legitimate employees carry a City badge, will be wearing a City uniform, and will not ask to enter your home.
If you encounter fraud, call the Pasadena non-emergency police line at (626) 744-4241, or PWP at (626) 744-4005. For more information on how to protect yourself from fraud, visit PWPweb.com/Fraud.
Alerta de fraude
personas que se hacen pasar por empleados de Pasadena Water and Power (PWP) están intentando ingresar a casas afirmando que necesitan analizar el agua. Los empleados legítimos llevan una insignia identificacion de la Ciudad, usarán un uniforme de la Ciudad y no pedirán entrar a su casa.
Si se encuentra con fraude, llame a la línea de policía que no es de emergencia de Pasadena al (626) 744-4241. Puede comunicarse con el centro de llamadas de PWP al (626) 744-4005, o en PWPweb.com/Fraud.
|
|
|
|
Pasadena Water and Power Issues Notice of Public Hearing
for Water Rate Structure and Adjustments
Public Hearing Scheduled for Monday, June 3
PASADENA, Calif.—Pasadena City Council will hold a public hearing on Monday, June 3, 2024, at 5:30 p.m. to consider the adoption of adjustments to the existing water rates and rate structure. The public is encouraged to participate. Pasadena Water and Power (PWP) mailed a public hearing notice to water customers. The notice includes a recommended rate structure redesign and adjustment information as well as details regarding the public hearing.
PWP is committed to providing reliable and high-quality water to the community and is proposing the water rate adjustments to help cover rising operating costs and provide funding for critical improvements to water infrastructure.
Individual customer bill impacts will vary based on customer type, water meter size, and amount of water used. To help customers estimate potential impacts the proposed adjustments may have on their water bill, PWP developed an online “bill estimator,” which is a simplified version of all billing inputs (actual bills may vary). The intent is to provide customers with a general sense of how their household budgets might be impacted based on individual projections of their water use. The bill estimator also shows the changes proposed to be effective for sewer and refuse services from the City of Pasadena Public Works Department.
Public Hearing:
Monday, June 3 at 5:30 p.m.
City Council Chambers, 100 North Garfield Avenue, Room S249
For more information on water rate adjustments and the upcoming public hearing, or to use PWP’s new bill estimator tool, please visit the PWPweb.com/WaterRateDesign.
Stay connected to the City of Pasadena! Visit us online at CityOfPasadena.net; follow us on Twitter at @PasadenaGov, and Instagram and Facebook at @CityOfPasadena; or call the City Service Center Monday through Friday during business hours at (626) 744-7311.
|
|
Pasadena Water and Power is proposing adjustments to how and how much we charge for water. Proposed new rates are simplified and promote water conservation while allowing for investments in key infrastructure to sustain a resilient water system. Learn more at PWPweb.com/WaterRateDesign.
|
|
Pasadena Water & Power (PWP) Unveils Online “Bill Estimator”
Ahead of Proposed Water Rates Adjustments
To help customers estimate potential impacts the proposed adjustments may have on their water bill, PWP developed an online “bill estimator,” which is a simplified version of all billing inputs (actual bills may vary). The intent is to provide customers with a general sense of how their budgets might be impacted based on individual projections of their water use. The bill estimator also shows the changes proposed to be effective for sewer and refuse services from the City of Pasadena Public Works Department.
|
|
PWP Water Rates Virtual Community Meeting April 2024—Recording
Pasadena Water and Power is recommending adjusting how and what we charge for water. Watch this virtual community meeting held on April 24, 2024 for information on why the proposed adjustments are needed, and how they may affect you and your neighbors. For more information, visit PWPweb.com/WaterRateDesign.
|
|
Explore the latest educational videos on the new rental housing laws.
This workshop video is designed to help you understand how to navigate Measure H-Pasadena Fair and Equitable Housing Charter Amendment.
|
|
Community Classes and Workshops for
Older Adults.
Classes take place at 9:30 am on the first Wednesday of each moth at the Jackie Robinson Community Center, 1020 N. Fair Oaks Ave. Pasadena, CA 91103
Classes are taught by Independence at Home, a SCAN Community Service.
Open to ages 50+.
For more information, call (626) 744-7300.
|
|
Dena Juneteenth
"Let Freedom Ring"
Saturday, June 15
Metropolitan Baptist Church
2283 N. fair Oaks Ave, 91001
|
|
|
|
CITY OF PASADENA ANNOUNCES 710 RECONNECTING COMMUNITIES’ ORAL HISTORY PROJECT AND SURVEY
An Initiative Capturing Stories Shaped by The State Route 710 (SR 710) Freeway Construction
PASADENA, Calif.— The City of Pasadena has begun the oral history component of the Historic Project for the City’s 710 Stub Master Plan. The oral history portion, one of three parts, aims to capture and acknowledge the diverse stories of community members displaced by the SR 710 Freeway (710) construction project.
In order for Caltrans to create the path for the planned 710 in the 1960s and the 1970s, thousands of residents, local businesses, and community institutions were displaced through the eminent domain process.
Former residents and family members of those personally impacted by the 710 construction are invited to share their experience via an online oral history survey, which includes a Community Input Tool. The tool and survey are designed to capture data, stories, and lived experiences in an engaging manner. These stories and perspectives are important to compiling a comprehensive narrative of experiences from residents who were impacted by the construction of the 710. The City is committed to the inclusivity of its diverse community and understands that every story will contribute to the rich tapestry of the Historic Project’s oral history.
The online survey will open for submissions on Monday, April 29, and will close on Sunday, June 30, 2024. The survey is available in a variety of languages including English, Japanese, and Spanish. It will cover a wide range of topics including, but not limited to:
· Family and personal experiences with the SR 710 Freeway Construction
· Historical significance of the freeway construction on the Pasadena community
· Environmental, social, and economic impacts of the construction project
The information collected in the survey will be analyzed and used to select candidates for preliminary interviews conducted by an experienced historian. Please visit Bit.ly/OralHistoryInput to get started.
Be the storyteller of your experience or of your family’s and contribute to this important collective effort. Alternatively, you may contact our team by phone from Monday through Friday, 9 a.m. to 5 p.m., at (626) 405-4848 to request a printed copy of the survey or to speak with the City's consultant working on this project. A voicemail recording will be available 24/7 if the public reaches us outside the hours mentioned above.
|
|
The Brenner Park Playground Improvement Project provides for the planning and design of new playground play structures, and the installation of a new rubberized play surface for increased safety and ADA compliance.
The existing playground equipment at Brenner Park was installed in 2009. The equipment has since become obsolete and has less play value than the new equipment installed at other parks. The replacement of the play equipment will provide a play environment of consistent quality with those recently installed at McDonald Park, Desiderio Park, and the new Playhouse Village Park. In addition, the new rubberized play surface will increase and enhance ADA accessibility and compliance.
en español:
El Proyecto de mejora del patio de juegos de Brenner Park prevé la planificación y el diseño de nuevas estructuras de juego en el parque infantil y la instalación de una nueva superficie de juego de caucho para mayor seguridad y cumplimiento de la ADA.
El equipo de juegos existente en Brenner Park se instaló en 2009. Desde entonces, el equipo se ha vuelto obsoleto y tiene menos valor de juego que el nuevo equipo instalado en otros parques. El reemplazo del equipo de juego proporcionará un ambiente de juego de calidad consistente con los instalados recientemente en McDonald Park, Desiderio Park y el nuevo Playhouse Village Park. Además, la nueva superficie de juego de goma aumentará y mejorará la accesibilidad y el cumplimiento de la ADA.
|
|
|
Pasadena Paramedic Subscription Service
The Pasadena Paramedic Subscription Program is a voluntary membership program for paramedic services and emergency ambulance transportation. Every dollar received by the program is used to enhance emergency medical services to the community and to improve our local paramedic system.
|
|
City Service Center
"One Call to City Hall"
(626) 744-7311
Call Center Hours of Operation: Monday - Friday 8 a.m. - 5 p.m.
Visit the website and download the CSC App!
|
|
Contact the District 3 Office
Comuníquese con la Oficina del Distrito 3
Call us at/Llamenos al (626) 744-4738
Crime (non-emergency)
If this is an emergency, call 9-1-1
For non-emergencies, call (626) 744-4241
|
|
|
|
Lisa Barrios
District Liaison
626-744-4738
___________
FOR MORE INFORMATION CLICK ON THE FOLLOWING LINKS:
|
|
|
|
CITY OF PASADENA
100 North Garfield Avenue
Suite S228 Pasadena,
California 91101
|
|
|
|
|
|
|
|