|
The updated iDX from Polara is now available to order for midblock crosswalks and other uncontrolled crossings.
Orders are being accepted immediately, with an anticipated lead time of approximately 8 weeks. Initial units are expected to begin shipping on February 6, 2026.
Availability for these applications was previously paused after rainy conditions were found to cause unintended activations through the radar-based iDetect feature.
Since that time, their engineering team has refined the iDetect system and completed extensive testing, confirming that rainy conditions no longer result in unintended activations.
Click here to download the updated iDX Datasheet
|