Community Update | 8.22.2024

Critical Infrastructure Improvement Projects To Begin 9.3.24


Phase 5, the final phase of the Sea Pines Drive Infrastructure Improvement Project and Phase 1 of the Lighthouse Lane Infrastructure Improvement Project are scheduled to begin the week of September 3rd. (Pictured: Existing conditions of the stormwater drainage system, estimated to be over 60 years old, in the Lighthouse Lane project area.)

Project work zones will include the below roadways:


Roadway demolition and stormwater drainage work to begin on South Sea Pines Drive and on Lighthouse Lane Tuesday, September 3rd, weather permitting.

  • Please note, due to the nature of major infrastructure improvement work, planned and unplanned water and or utility outages in the work zone may occur.
  • Well-pointing dewatering operations (lowering groundwater levels to provide more stable working conditions) and water pumping will be in place daily.


Traffic Management for South Sea Pines Drive and Lighthouse Lane:

  • Heavy construction equipment and vehicles will be traveling to and from the project sites.
  • Single-lane road closures and flagging operations will be in place daily, weather permitting. Temporary full lane closures may be required at times.
  • Motorists should expect traffic delays, traffic detours, and be prepared to share the road with bike riders and pedestrians in the project work zones.
  • Follow posted speed limits and travel with caution in the work zones as construction crews will be working in the roadway.
  • Sidewalks and leisure trails in the project areas will be closed as needed. Pedestrians and bike riders should expect delays and be prepared to stop and follow detours.
  • For safety, bike riders will be required to dismount and walk bikes around the active work zones. Keep a safe distance from construction equipment. 


For more information on critical infrastructure and capital projects, please visit seapinesliving.com/projects.

Labor Day Office Hours & Commercial Access Restriction Reminder

Labor Day Office Hours for the Sea Pines CSA Admin Office, Maintenance Office, ARB & Sea Pines Community Center:


  • Friday, August 30: Closing at 2:00 PM
  • Monday, September 2: Closed

 

All other Sea Pines CSA offices will remain under normal operating hours.


Commercial Vendor Holiday Access Restriction: Vehicles with commercial decals or commercial passes are not permitted in Sea Pines on Labor Day. This restriction does not apply to pool companies, housekeeping, and deliveries to commercial entities. For emergency access for service providers, please contact Sea Pines Security at 843.671.7170.

Sea Pines CSA Gate Pass Office Seasonal Hours To Begin 9.8.24

 

Beginning Sunday, September 8, 2024, the Sea Pines CSA Gate Pass Office at 32 Greenwood Drive will observe the below seasonal hours:

 

  • Sunday – Thursday: 7:00 AM - 9:00 PM
  • Friday & Saturday: 7:00 AM - 11:00 PM


For questions, please contact the Sea Pines CSA Gate Pass Office at 843.671.7277.

Maintenance Projects & Services


Seasonal Mosquito Control Program: Our next mosquito treatment will take place on Monday, August 26th, during overnight hours. For more information on this service please click here.


Tree Care Management: Leisure trail tree trimming along North Sea Pines Drive, starting at the Ocean Gate and working towards Lighthouse Road, will begin next week.


Roadway Asphalt Repairs in various locations throughout the Greenwood Forest neighborhood and along Royal Tern Road will begin next week.

Stormwater Repair: Our team is currently investigating repair options for a sinkhole that was discovered over a stormwater drainpipe on Mizzenmast Lane.


Please note, all work is weather permitting. For questions, please contact our Maintenance Department at 843.671.7849 or at csamaintenance@csaseapines.com.

How To Contact The Community Standards Department

To ask the Community Standards staff a question, report a concern, or request a timeline extension for a courtesy notice, please utilize the Community Standards Request Form available on our website. Click here to access the form or visit seapinesliving.com/communitystandards.

Beaufort County Sheriff's Office: Missing Person Alert

Stanley Kotowski has been missing from South Sea Pines Drive area since Friday, August 16, around 10:30 A.M. Sea Pines Security has been collaborating closely with the Beaufort County Sheriff's Office and offering support and resources in their search efforts over the past week.


Stanley Kotowski was last seen wearing a dark in color, possibly gray, Coors Light t-shirt, dark in color shorts, possibly dark blue or black, and no shoes. Kotowski did not take any personal items with him such as wallet or phone. He is approximately six feet tall and weighs around 200 pounds. He has short brown hair and brown eyes.


The Beaufort County Sherrif's Office is requesting people to review their cameras back to August 16th to see if they can observe Kotowski and to check their personal properties. Anyone with information about Stanley Kotowski is encouraged to contact their non-emergency dispatch line at 843-524-2777.

 

WWW.SEAPINESLIVING.COM

Online Service Requests | Email Archive | Online Guest Pass Request Portal | Contact Us