What's Happening
Crews have completed the installation of all sewer pipes and required connections. During this work, unforeseen conditions were encountered that required adjustments in the field, which has extended the construction timeline
Over the next few weeks, crews will remove the temporary pipes near the pump station, take out an older pipe located beneath the bridge and begin restoring the roadway to its previous condition.
Traffic Changes
Lane closures are currently in place on both the north and south sides of the bridge on Pine Tree Drive near 51 Street. These closures reduce traffic to one lane in each direction and are expected to remain in effect for the next 3–5 weeks. Please find maps of the road reconfigurations on the north and south sides below.
South of 51 Street on Pine Tree Drive
- A short section of Pine Tree Drive just south of the 51 Street bridge is closed for the work zone. Southbound traffic is being routed into one of the northbound lanes, which has been temporarily reconfigured to provide one lane in each direction through this segment. Southbound vehicles will then transition back to the designated southbound lane beyond the work area.
|