CONSTRUCTION UPDATE

Week of September 15, 2025

Reminder: Weekend Full Closure

I-405 Jeffrey Road On-Ramp


A full weekend closure of the northbound (NB) I-405 Jeffrey Road on-ramp is scheduled for Friday, Sept. 19 at 10 p.m. through Monday, Sept. 22 at 5 a.m.* for crews to safely perform paving and drainage work at the on-ramp.


Additionally, the NB I-405 Jeffrey Road loop on-ramp and NB I-405 Jeffrey Road off-ramp will be intermittently closed at night throughout this closure period. 


Detour routes will be posted to help motorists navigate through the area during the closure. Please follow all temporary construction signage and reduce your traveling speed through our construction zone.


*Construction is a dynamic process. Closure times and construction activity is subject to change.

Detour Routes:



  1. Southbound (SB) Jeffrey Rd. > Westbound (WB) Alton Pkwy. > SB Culver Dr. > NB I-405 Culver on-ramp
  2. SB Jeffrey Rd. > SB University Dr. > NB Culver Dr. > NB 405 I-405 Culver loop on-ramp


Project Overview

The California Department of Transportation (Caltrans) is making improvements to Interstate 405 (I-405), between Interstate 5 (I-5) and Harbor Boulevard. The project will improve safety for all modes of travel, increase the life expectancy of pavement, enhance traffic operations, and mitigate congestion.

Project Improvements

Enhance safety for traveling public and maintenance crews.


Repair and replace concrete slabs, lanes, traffic loop detectors, and bridge rehabilitation.


Traffic management system improvements, including ramp and roadway enhancements, and an updated metering system.


Irrigation and landscape enhancements.


NEW! Park and Ride facility located on Bristol Street at SB I-405.

Contact Us

Email:

Info@revivethe405.com


Helpline:

714-868-6998


Website:

www.ReviveThe405.com

 
 

Nightly lane, ramp, and connector closures are anticipated Monday night, September 15, through Friday night, September 19, from 9 p.m. to 5 a.m.*


Nighttime lane and ramp closures are anticipated Saturday night, September 20, from 11 p.m. to 6 a.m.*



*Construction schedule is subject to change.

Crews are conducting curb and ramp work, drainage, roadway, and electrical activities at night on northbound (NB) and southbound (SB) I-405. These activities require nightly intermittent lane, ramp, and connector closures.


Please be advised that this work may be loud. Follow detour signs in place to navigate around closures.

Intermittent Freeway Lane Closures:

  • NB I-405 from Sand Canyon Avenue to Fairview Drive
  • NB I-405 from MacArthur Boulevard to Fairview Road
  • SB I-405 from SR-73 to MacArthur Boulevard
  • SB I-405 from Jamboree Road to I-5 Connector
    

Intermittent Ramp Closures*:

  • NB I-405 on-ramp from WB Sand Canyon Avenue
  • NB I-405 off-ramp to Sand Canyon Avenue
  • NB I-405 off-ramp to Jeffrey Road
  • NB I-405 on-ramp from EB Jeffrey Road/University Drive
  • NB I-405 loop on-ramp from WB University Drive/Jeffrey Road
  • SB I-405 loop on-ramp from WB Culver Drive
  • NB I-405 off-ramp to Culver Drive
  • NB I-405 loop on-ramp from EB Culver Drive
  • SB I-405 off-ramp to Jamboree Road
  • SB I-405 loop on-ramp from WB Jamboree Road
  • NB I-405 on-and off-ramps to Jamboree Road
  • NB I-405 loop on-ramp from WB MacArthur Boulevard
  • NB I-405 on-and off-ramps to Bristol Street
  • NB I-405 loop on-ramp from WB Bristol Drive
  • SB I-405 on-ramp from EB Irvine Center Drive
  • SB I-405 loop on-ramp from Irvine Center Drive
  • SB I-405 on-ramp from Irvine Center Drive
  • NB I-405 on-ramp from Irvine Center Drive
  • SB I-405 off-ramp to Irvine Center Drive
  • SB I-405 on-and off-ramps to Jamboree Road
  • SB I-405 off-ramp to MacArthur Boulevard
  • SB I-405 on-ramp from EB MacArthur Boulevard



Intermittent Connector Closures:

  • NB SR-55 Connector to SB I-405
  • SB I-405 Connector SB I-5



* Consecutive ramps will not be closed at the same time.

 