At the first location, Celerity designed a route of approximately 10,000’, comprised of both aerial plant on existing joint use poles as well as new underground plant for Big Spring School District. Small sections of underground plant using existing conduit will be utilized to access the buildings on both ends.
At the second location, the designed route consists of approximately 11,305’ and is comprised of entirely underground plant and utilizes existing conduit entranceways into both schools.
To read more about this project, view the article below.