Beeline and Blue has enjoyed a relationship with FRK Architects & Engineers for over 20 years. They specialize in designing for education, but their work for a new Clinton High School required above-and-beyond plans.
The Clinton High School project will be reconstructed in 5 phases and allow students to go to school during the construction process. The client didn’t want to tear down the whole school, so existing structures, and their plans, also had to be documented.
These photos show the first 50 sets — with 4 volumes of specs and 5 volumes of plans in each set! Thats more than 565 drawings!
We get such joy from seeing prints like these — even if they aren't "blue" anymore!