Work on Phase 1 of the Custom House roof replacement is scheduled to begin October 12 — just two weeks away!
Thanks to your incredible generosity, we have raised a substantial portion of the funds needed for Phase 1 of this vital project. Along the way, however, emergency roof repairs have required a portion of those funds — necessary work to protect this historic building while we prepare for a permanent solution.
Phase 1 will replace the sloped perimeter of the 1933 Custom House roof. Carefully designed modifications to the historic roof will ensure that the Yankee gutters around the roof perimeter and the four interior gutters inside the attic can handle increasingly intense downpours. Your donations and grants will cover much of this work, and the museum will contribute operating funds to cover the remaining Phase 1 costs.
We’re asking for your help to close that gap. Every contribution, large or small, brings us closer to completing this essential work and protecting the Custom House and its contents for future generations.
And we’re not done yet. Phase 2 — replacement of the center flat platform and flagpole and restoration to its 1833 design — will follow as soon as we raise the additional funds needed to complete the entire roof project.
For now, we’re watching tonight’s storm and hoping for as little water as possible inside the building.
If you’ve been waiting for the right moment to help, this is it. Please consider making a donation today and help us get Phase 1 across the finish line before work begins on October 12.
Please donate HERE to our new roof and help protect the Custom House for generations to come!
Thank you for helping us preserve this important piece of our community’s history.
--Susan
|