Fehrs Metal Building Construction began this project with the demolition of existing building structures on site, then began the construction of a new 10,000 square foot building with a wraparound porch for the snack bar area, arcade room, restrooms and rental/sales area that were completed in 2020. The entire miniature golf course, which originally opened in 1955, was completely renovated, with multiple improvements added to it. A new parking lot was added, along with new landscaping and lighting throughout. In 2023, construction began on two additional buildings and a new go kart track, which was completed in January of 2024.

SUBCONTRACTORS/SUPPLIERS

WEST TEXAS AGC MEMBERS

  • RED DEER CONSTRUCTION
  • SCHRADER ROOFING
  • TURF SPECIALTIES

Fletco Construction recently completed a cutting-edge agricultural facility for PBT-ISD, featuring state-of-the-art amenities tailored to enhance productivity and learning. Valued at $4.9 million, the 13,375 square foot facility boasts automated watering systems for pens, along with animal showers equipped with hot and cold water for optimal care. Additionally, the facility includes a modern learning center complete with high-tech interactive displays and Wi-Fi connectivity, fostering a dynamic educational environment. Expansive grazing areas provide ample space for animals to bask in the sun and exercise, ensuring their well-being. This project  stands as a testament to Fletco Construction’s commitment to innovation and excellence in construction for the benefit of PBT-ISD and its community. 

SUBCONTRACTORS/SUPPLIERS

WEST TEXAS AGC MEMBERS

  • FREEDOMS COMPUTER CABLING & ELECTRIC CONTRACTOR
  • J&H PAINTING
  • OVERHEAD DOOR OF PERMIAN BASIN
  • PB MATERIALS
  • PERMIAN PAVING
  • SOUTH WEST MASONRY INC.
  • TERRACON

Lee Lewis Construction recently built this 50,600 square-foot, three-story building that will house a portion of the Investigations Bureau and the Administration Bureau. These consist of the Major Crimes Unit, Special Victims Unit, Communications Center, Records Unit, along with other portions of police administration. The construction of this new facility is part of the ongoing Public Safety Improvements Project and is the fourth building constructed as part of the project. Three police division stations were concurrently built in east, north and south Lubbock as part of the decentralization plan designed to increase community-oriented policing.

SUBCONTRACTORS/SUPPLIERS

WEST TEXAS AGC MEMBERS

  • ACME ELECTRIC COMPANY
  • ALAMO STRUCTURAL STEEL
  • COMFORT MASTERS HEATING & A/C, INC.
  • ENTEC SOLUTIONS
  • GUARDIAN UTILITY CONSTRUCTION LLC
  • LLANO MASONRY LLC
  • LUBBOCK GLASS & MIRROR CO.
  • LYDICK-HOOK ROOFING COMPANY OF LUBBOCK, INC.
  • OVERHEAD DOOR COMPANY OF LUBBOCK
  • THE HALLGREN COMPANY

M & F Litteken constructed a ground-up new facility for a local credit union that included a teller area and drive-thru, ATM & canopy, safe deposit box vault, financing & administrative offices and grand entry. The exterior envelope is composed of combination manufactured stone masonry veneer/EIFS/fiber-cement siding walls with pre-finished metal standing seem roof. Interior finishes include LVT and carpet tile floor coving, ceramic tile, and significant stained red oak trim.

SUBCONTRACTORS/SUPPLIERS

WEST TEXAS AGC MEMBERS

  • BREEGLE BUILDING PRODUCTS
  • COMMERCIAL & INDUSTRIAL ELECTRONICS, INC.
  • FERGUSON VERESH (FORMERLY SNB MECHANICAL)
  • OK CONCRETE
  • SEASON MASTER SERVICES
  • SORGE CONTRACTING
  • TEX-OMA BUILDERS SUPPLY
  • WILSON CONTRACTING
Visit our Website
Facebook  LinkedIn