|
This month, we're spotlighting utilization, one of the most misunderstood data points in HMIS. At its core, utilization measures how fully a project’s available inventory (beds or units) is being used over time. While the calculation itself is straightforward, the data behind it often reveals deeper workflow and data quality issues that can affect federal reporting, funding conversations, and system-level planning.
Understanding how utilization is calculated and what drives over/under utilization can help agencies identify and correct data issues before they surface as flags in HUD reporting.
What Is Utilization? In HMIS reporting, utilization is calculated as:
Bed Utilization: Daily Average Number of People Served / Daily Average of Number of Beds Available.
The resulting rate is evaluated at both the project and household type level.
This calculation relies on two foundational data sources:
-
Enrollment data (entries, exits, household type, and move-in date (PH only))
-
Inventory data (beds/units, inventory dates, household type)
If either side of that equation is inaccurate, utilization will be skewed.
Note: Utilization applies to all residential projects (Interim Housing, Time Limited Subsidy and Permanent Housing), not just projects that are using the inventory module.
Why Utilization Matters: Utilization impacts multiple HUD related processes, including:
High or low utilization flags may prompt additional review, targeted outreach, or data correction requests. Utilization data also feeds directly into the Annual Homelessness Assessment Report (AHAR), which HUD uses to produce national estimates of homelessness. Accurate utilization ensures system performance is interpreted correctly and that programs are not misrepresented in federal reporting.
|