WisDOT has released the latest version of ASP-6, which is effective with the February 2026 letting on Tuesday, Feb. 10.
The ASP-6 is included in each contract immediately after the special provisions. It is inserted into all contracts by central office. Designers do not have to ask for it in their design letter.
Please review the changes below and send any questions or concerns to WTBA Director of Engineering Matt Grove.
ASP-6 will accumulate specification changes as they become necessary, with each edition incorporating the previous edition, until they can be included in a complete standard specification update.
This ASP-6 includes the November 2024 and November 2025 ASP-6s and amends WisDOT’s 2025 Standard Specifications for Highway and Structure Construction. The ASP-6 includes an initial table of contents sheet with active links to aid in navigation.
Department staff, contractors and consultants must read the ASP-6 to avoid missing important specification changes. This is a reminder to look at the ASP-6 for each contract along with the other special provisions for technical specification changes.
WisDOT will send an update email whenever it changes the ASP-6. The current version of ASP-6 is available online on the department's Highway Construction Contract Information (HCCI) website at: https://wisconsindot.gov/hccidocs/contracting-info/asp-6.pdf
Provisions added effective with the February 2026 Letting:
104.2.2 Scope of Work – Issuing Change Orders
Replace subsection 104.2.2 to revise and rearrange select information for scope of work issuing change orders.
105.13.3 Claim Process for Unresolved Changes – Submission of Claim
Replace subsection 105.13.3 to revise information within paragraph (1) for claims process for unresolved changes submission of claim.
107.27.1 Drones or Unmanned Aircraft Systems (UAS) – Licensing and Compliance
Replace subsection 107.27.1 to add paragraph (5) to information placed with the November 2025 ASP-6 for licensing and compliance of drones and UAS.
550.3.9.1 Driven Piles - Pre-Boring - General
Replace subsection 550.3.9.1 to add paragraph (2) for driven pile pre-boring general.
646.3.1.1 Pavement Marking – General Marking
Add paragraph (8) to subsection 636.3.1.1 for pavement markings general marking.
646.3.1.6.1 Pavement Marking – Proving Period - General
Replace paragraph (1) of subsection 646.3.1.6.1 for pavement markings proving period general.
646.3.1.6.2 Pavement Marking - Proving Period – Retroreflectivity
Replace paragraph (1) of subsection 646.3.1.6.2 for pavement markings proving period retoreflectivity.
646.3.2.3.2 Pavement Marking – Wet Reflective Epoxy
Replace paragraph (1) of subsection 646.3.2.3.2 for pavement marking wet reflective epoxy.
646.3.3 Pavement Marking – Special Markings
Replace subsection 646.3.3 to add paragraph (1) and renumber remaining paragraphs for pavement markings special markings.
710.4 General Concrete QMP – Concrete Mixes
Replace Table 710-2 (Material Mix Design Modifications) and Table 710-3 (Mix Design Modification Documentation) for general concrete QMP concrete mixes information added with the November 2025 ASP-6.
710.5.6.2 General Concrete QMP – Concrete Mixes – Contractor Control Charts
Replace Table 710-5 (QC Aggregate Testing Frequency) in subsection 710.5.6.2 for general concrete QMP concrete mixes, contractor control charts information added with the November 2025 ASP-6.
715.5.4 QMP Concrete Pavement, Cast-in-Place Barrier and Structures – Payment - Pay Adjustments for Nonconforming Air Content, Temperature, and Delivery Time
Replace Table 715-3 (Price Reductions for Nonconforming Temperature) in subsection 715.5.4 for QMP concrete pavement, cast-in-place barrier and structures payment pay adjustments for nonconforming air content, temperature, and delivery time information added with November 2025 ASP-6.
Bid Items - 600 Bid Items
Remove three bid items for pipe reinforced concrete horizontal elliptical 63x98-inch.
Add bid items for poles type 9 and 10 special over height.
|