Crews will construct the center median on Euclid Street between Newhope Street and Mt. Washington.
This work will require Euclid to be reduced to two lanes in each direction at Newhope. The left-turn lane from southbound Euclid to eastbound Mt. Washington Street will also be closed.
The extended lane reductions are anticipated as early as 8 p.m. Tuesday, Oct. 11, to 8 p.m. Monday, Oct. 17.
Sign up for project-wide and bridge-specific construction alerts at
bit.ly/405-signup.