When a long-time valued customer came to Container Systems, Inc. with a challenge,

the stakes were high.

This customer operates multiple large-scale HVAC systems responsible for heating warehouses exceeding 300,000 square feet.



When winter weather can be unpredictable, protecting the critical infrastructure of a facility's systems isn’t optional. Comfort, productivity, and ongoing operations can be at risk.




Balancing maximum protection with practical access was a key facet of this project. To deliver the highest-quality result, CSI worked closely with our trusted manufacturing partner, WireCrafters, ensuring the custom fence met the demands of both the environment and the application.

The result?


  • A customized solution included 25' high specialized security fencing
  • Protected HVAC systems
  • Uninterrupted operations
  • Removable panels for safe access to mechanicals
  • A safer, comfortable work environment - even in the harshest winter conditions


If you’re facing a unique safety or infrastructure challenge, our team is ready to help. For this and any other material handling projects, please contact:



Mike Wall

630-542-9994

mike@containersystems.com

Container Systems, Inc.

877-712-1596/630-960-3000

Fax: 630-960-4176

containersystems.com

205 E. Burlington Avenue

Westmont, IL 60559

Facebook  Linkedin