|
The Cost of SGMA Compliance and the Importance of Keeping Local Control
By Steve Sinton, Director, Shandon-San Juan Water District
There are many costs associated with California’s Sustainable Groundwater Management Act (SGMA). In addition to the mandate that groundwater supplies be managed sustainably — with water levels maintained at or above specified thresholds— Groundwater Sustainability Agencies (GSAs) must take actions to sustain those levels, report supporting data to the State of California and demonstrate that their efforts are effective.
These State-imposed mandates require GSAs to develop comprehensive monitoring wells systems to track water conditions throughout the basin. There are detailed annual reports that must be prepared by engineers and hydrologists, as well as updates on the Groundwater Sustainability Plan which are required every five years. If the GSAs fail to fulfill any of these obligations, the State will take over the management of the groundwater basin, impose fees for that management and impose curtailment of pumping at whatever level the State decides.
The Paso Basin GSAs — San Luis Obispo County, the EPC and SSJ Water Districts and the City of Paso Robles — are working to meet the SGMA requirement for sustainability in the most efficient way that it can, with the least impact on local business as possible. If the State takes over, it very well may not consider our local needs and wishes, so we feel that it is critical to keep control of this process in local hands.
What’s at stake? A Cal Poly study conducted at the request of the SSJ and EPC Water Districts answered that very question. It found that the local economy would lose at least $49 million per year and could go as high as $146 million from reduced pumping. The direct losses to the wine industry would be even greater. This is why your Water Districts, along with other GSAs, have decided to agree to a Joint Powers Agreement, which creates and empowers a new governing entity — the Paso Robles Area Groundwater Authority — to get the work done. That entity has to do all the studies, complete all the reports and implement the projects that are mandated by SGMA.
Yes, it will be expensive, but won’t cost nearly as much as if we do nothing.
|