|
The October 1 meeting that the Nevada Division of Water Resources and the State Engineer in Orovada was well attended by interested participants from the Northern Humboldt County area. The session was aimed at informing the public about water-related issues while also offering a public forum for the community to share their comments, suggestions and ask questions.
A number of local concerns were raised and the State Engineer, Adam Sullivan shared several points of how different areas of Nevada water law are carried out. He noted that Humboldt County has the most groundwater use/pumping in the state.
He pointed out that the Division of Water Resources are planning on bringing forward legislation in the next session of the Nevada Legislature and he outlined the concepts that are going to be covered in the bill. He has shared these concepts with past meetings that Nevada Farm Bureau has discussed with his office, dealing with a more simplified approach for how forfeitures on non-used water would be carried out.
The concepts roughly work on the basis that after five years of non-use of any amount of the water connected to a water right, the water right owner would be notified that their water right was subject to forfeiture of non-use. Over the course of the next five years (although this time might be changed going forward – depending on input and discussions with stakeholders), the water right owner would have the chance to put the un-used water to the beneficial use that the water right covers. The present system of extensions after the notification of non-use would be sought to be changed under the proposed legislation.
Until the actual legislation comes forward in November through the pre-filed process, we don’t know what the exact language will say, but county Farm Bureaus are reviewing current Farm Bureau policy and considering possible changes regarding the possible direction Nevada Farm Bureau policy will go. Of specific attention are the criteria now in state law which pertains to the requirements of what is used for consideration of an extension of time (click on the link above to see what the criteria now part of state law).
|