Why Don't We Start With a Building Size?
Programming allows the Town to establish the amount of space required for each function and then consider the additional space necessary to make the building work, including corridors, restrooms, mechanical and electrical systems, stairs, elevators, walls, storage, and other support areas.
Together, those requirements establish a preliminary building size that is based on actual municipal needs.
This is also an important part of controlling project costs. Every square foot of a municipal building has both an initial construction cost and a long-term cost to operate and maintain. The goal is not simply to build more space. It is to provide the right amount of space, arranged in the right way, to serve New Marlborough effectively for decades to come.
Looking at Today—and Tomorrow
A renovated Town Hall is a long-term investment. Programming therefore considers more than how the existing building is being used today.
The process looks at current operations, known deficiencies, accessibility, technology, public access, staffing and potential future needs. It also identifies opportunities for departments to share resources and spaces rather than unnecessarily duplicating them.
That balance is important.
We want to avoid building a Town Hall that is too small or inflexible shortly after it opens. At the same time, we do not want to construct and maintain space that the Town does not reasonably need.
|