PROJECT SCOPE: The project improvements include installing a six-foot wide concrete sidewalk on the east side of US 1 from 45th Street to south of 53rd Street to enhance safety and connectivity for pedestrians, constructing crosswalks at US 1 and 47th Street to increase pedestrian safety, replacing drainage at various locations throughout the project limits to improve functionality and long-term resiliency, and upgrading signage and pavement markings to boost safety, functionality, and traffic operations.
PROJECT IMPROVEMENTS
• Installing a six-foot wide concrete sidewalk on the east side of US 1 from 45th Street to south of 53rd Street to enhance safety and connectivity for pedestrians
• Constructing crosswalks at SR 5/US 1 and 47th Street to increase pedestrian safety • Replacing drainage at various locations throughout the project limits to improve functionality and long-term resiliency
• Upgrading signage and pavement markings to boost safety, functionality, and traffic operations
TRAFFIC IMPACTS
• Single-lane closures on US 1 are permitted as follows:
• Daily and nightly, Monday through Friday
• 7:00 p.m. to 6:00 a.m. within 600 feet of a signalized intersection, Monday through Thursday
COMMUNITY MEETING
In-Person Pop-Up Event Tuesday, May 20, 2025 11:00 a.m. - 1:00 p.m. Davila’s Pizza at Harbor Point 5240 US 1 Vero Beach, FL 32967. Project personnel will be available to review the project scope and schedule, lane closure information, and address questions one-on-one.
|