|
1.) Innovative Solution to a Design Problem / Best Use of New Products
Heath & Lineback, a BCC Company
West Nancy Creek Drive Emergency Bridge Replacement
Long Engineering, LLC (an Atlas Company)
CR38/Shallowford Bridge RD at Toccoa River South of Morganton, Fannin County
WSP USA Inc.
Sardis Road Connector with Turbo Roundabout
2.) Planning and Design of an Alternative Mode Transportation Facility
Aviation Infrastructure Solutions
Runway 9L End Around Taxiway, aka Taxiway Whiskey
GDOT District One
SR 17 Pedestrian Improvements Helen, White Count
Kimley-Horn
Firefly Trail Bridge Over Trail Creek
3.) NEPA, Environmental Protection, Preservation, Restoration and/or Enhancement
Adrian Collaborative
Rome-Cartersville Development Corridor
United Consulting
Atlanta Beltline Southside Trail; Segment 1
Arcadis, Inc.
State Route 119 at the Ogeechee River and Ogeechee Overflow, Bulloch and Effingham Counties
4.) Context Sensitive Planning and Design Including Public Participation Plan
WSP USA Inc.
I-285 and I-20 West Interchange Reconstruction
WSP USA Inc.
SR 8/US 278 From SR280 to CS 6701/Stiff Street - Donald Lee Hollowell Parkway Traffic Calming Project
Kimley-Horn
Firefly Trail Bridge Over Trail Creek
5.) Bridge/Structural Design
CHA Consulting, Inc., Edwards-Pitman Environmental, Thomas & Hutton, United Consulting
Rogers Bridge
Parsons Transportation Group, Inc.
SR 10 @ Sweetwater Creek
Kimley-Horn
Firefly Trail Bridge Over Trail Creek
6.) Traffic Safety and/or Intersection Design
Columbia Engineering and Services, Inc.
SR 53 Elliptical Roundabout
GDOT District One
SR 11 @ Old Swimming Pool Rd, Jackson County
WSP USA Inc.
SR 8/US 278 From SR280 to CS 6701/Stiff Street - Donald Lee Hollowell Parkway Traffic Calming Project
7.) Highway Design - Large Project (Greater than or equal to $20 million)
GDOT Office of Roadway Design
S.R. 316 @ S.R. 53 Interchange
VHB/Thomas & Hutton
Jimmy DeLoach Parkway Extension and Interchange
Moffatt & Nichol
Brampton Road Connector from SR 21/SR 25 to SR 21 Spur
8.) Highway Design - Small Project (Less than $20 million)
KCI Technologies, Inc.
SR 22/US 80/JR Allen Parkway at Bradley Park Drive
Parsons Transportation Group, Inc.
SR 4 @ North Fork Spirit Creek
GDOT District One
SR 60 Bus @ Oak Grove Rd, Lumpkin County
9.) Design-Build
Infrastructure Consulting & Engineering, PLLC
I-85 Widening Phase II
Heath & Lineback, a BCC Company
SR 135 over Altamaha River Bridge Replacement
Michael Baker International
Cheshire Bridge Road Bridge over South Fork Peachtree Creek
10.) Right of Way Acquisition
Gresham Smith
MARTA Summerhill/Capital Avenue BRT ROW
Jacobs
Jones Bridge Right of Way Acquisition
Keck & Wood
City of Villa Rica Bypass
|