Are you following the progress of the construction of the new Buffalo Bills Stadium? We are!
Here are a few images of some of the equipment being delivered that will be used in the snow-melting systems in the canopy - specifically designed to manage the heavy snowfall that occurs in the Buffalo area.
Want to know more? Click the link below to view a brief video that explains the building design of the canopy (and keep an eye on our website for updates).
The Centrotherm Polypropylene Vent System is designed to handle the diverse needs of high-efficiency appliances, ensuring proper airflow and safe venting. The system is built with high-quality, corrosion-resistant polypropylene, making it ideal for handling temperatures up to 230°F / 110°C, and acidic condensate produced by modern gas appliances.
Engineered Venting Design:
Centrotherm Eco Systems has added VentBOM to create safe, accurate vent systems. A finished VentBOM layout will contain a full bill of materials, list pricing, and both a schematic and 3D model of the layout.