CONSTRUCTION UPDATE

Week of December 22, 2025

 

Winter Holiday Roadway Closures Moratorium


In observance of the winter holidays, there will be no roadway closures during the following periods:


  • Wednesday morning, December 24, through Sunday evening, December 28
  • Wednesday morning, December 31, through Sunday evening, January 4


Normal construction activities and roadway closures will resume on Monday, January 5.


Safe Driving Tips for the Holidays


  1. Plan Ahead – Check traffic and allow extra time for holiday congestion and construction delays.
  2. Make Safety Your Tradition – If you plan to celebrate, arrange a ride or use a rideshare service. Never drink and drive.
  3. Stay Focused and Keep Space – Avoid distractions by keeping your eyes on the road and maintain a safe distance between vehicles, especially in heavy traffic.
 

Project Overview

The California Department of Transportation (Caltrans) is making improvements to Interstate 405 (I-405), between Interstate 5 (I-5) and Harbor Boulevard. The project will improve safety for all modes of travel, increase the life expectancy of pavement, enhance traffic operations, and mitigate congestion.

Project Improvements

Enhance safety for traveling public and maintenance crews.


Repair and replace concrete slabs, lanes, traffic loop detectors, and bridge rehabilitation.


Traffic management system improvements, including ramp and roadway enhancements, and an updated metering system.


Irrigation and landscape enhancements.


NEW! Park and Ride facility located on Bristol Street at SB I-405.

Contact Us

Email:

Info@revivethe405.com


Helpline:

714-868-6998


Website:

www.ReviveThe405.com

 
 

Nightly lane, ramp, and connector closures are scheduled* as follows:

  • Monday night, December 22, through Tuesday night, December 23, from 9 p.m. to 5 a.m.
  • Monday night, December 29, through Tuesday night, December 30, from 9 p.m. to 5 a.m.


*Construction schedule is subject to change.

Crews are conducting curb and ramp work, paving, and electrical activities at night on northbound (NB) and southbound (SB) I-405. These activities require nightly intermittent lane, ramp, and connector closures.


Please be advised that this work may be loud. Follow detour signs in place to navigate around closures.

Intermittent Freeway Lane Closures:

  • NB I-405 from I-5 to Sand Canyon Avenue
  • SB I-405 from MacArthur Boulevard to I-5


Intermittent Ramp Closures*:

  • NB I-405 loop on-ramp from EB Irvine Center Drive
  • NB I-405 off-ramp to Entertainment/Irvine Center Drive
  • NB I-405 on-ramp from WB Sand Canyon Avenue
  • NB I-405 loop on-ramp from EB Sand Canyon Avenue
  • NB I-405 off-ramp to Sand Canyon Avenue
  • NB I-405 on-ramp from WB Culver Drive
  • NB I-405 loop on-ramp from EB Jamboree Road
  • NB I-405 loop on-ramp from NB Harbor Blvd
  • NB I-405 off-ramp to Harbor Blvd
  • SB I-405 off-ramp to Irvine Center Drive
  • SB I-405 loop on-ramp from WB Irvine Center Drive
  • SB I-405 off-ramp to Jamboree Road
  • SB I-405 off-ramp to MacArthur Boulevard
  • SB I-405 on-ramp from EB MacArthur Boulevard


Intermittent Connector Closures:

  • NB I-405 Connectors to NB & SB SR-55
  • NB I-405 Connector to SB SR-133
  • NB SR-133 Connectors to NB & SB I-405
  • SB SR-55 Connector to SB I-405
  • SB I-405 Connectors to NB & SB SR-133
  • SB SR-133 Connector to SB I-405



* Consecutive ramps will not be closed at the same time.

 
Facebook  X  Instagram  Email  Web