Office: 843.671.1343
Sea Pines Security: 843.671.7170
CSA Maintenance: 843.671.7849
www.SeaPinesLiving.com | Facebook: www.facebook.com/SeaPinesLiving
In this message
  • Upcoming Events
  • Volunteers for the Future of Six Oaks
  • Maintenance Updates
  • In Case You Missed It- Helpful Links
Upcoming Events
Community Shredding Event

May 30 | 8 AM- 11 AM
Sea Pines Community Center
Parking Lot

This free community shredding event is open to Sea Pines Property Owners. Commercial quantities are prohibited. Staples are allowed, but paper must be removed from binders.
Sea Pines Community Coffee

June 5 | 9AM
Sea Pines Community Center
71 Lighthouse Road
Suite #120

Join us in person or register for the meeting webinar by clicking  here .

Meeting agenda to come.
Volunteers for the Future of Six Oaks
Call to action from: Mark Griffith, CSA BOD, Chairman

Six Oaks Cemetery was established in 1966 and is Hilton Head’s only full service, public, per petual care cemetery. As Chairman of the CSA BOD for almost 5 years I have also served as President of the Six Oaks Cemetery Board. The cemetery’s board goal is to insure we can perpetually provide a high level of care for the cemetery, which is interwoven into the fabric of CSA and is an inseparable part of the Sea Pines Community.

Since I have been serving as President of the Cemetery Board, we have increased the Perpetual Care Fund by over $400,000, almost doubling the balance that was accrued over the previous 47 years. We have accomplished this largely by sales, which allow us to contribute to the Perpetual Care Fund AND to fund operations.

Currently our primary marketing efforts rely heavily on newspapers. We realize that times are changing and that newspaper circulations are trending down. We need to maintain our sales and to prepare for the additional funding needed for the Perpetual Care Fund.

To help us evolve with our ever changing world, the Cemetery Board is forming a committee to benefit the future of Six Oaks Cemetery. I am requesting that any Board, committee or community member with relevant expertise and experience consider serving. Skills that would help with our needs include: marketing analysis, digital marketing, industry knowledge, fund raising and photography.

Get involved by completing the application form and letting us know how you can contribute to the successful future of Six Oaks Cemetery.
  • Please return the form by July 1, 2019 to the CSA Administration Office, 175 Greenwood Drive, 29928, Attention: David Henderson. or email to: wildlife@csaseapines.com
  • Click here. for the application form.
Maintenance Updates
Beach Walk Repairs Scheduled

  • We have begun repairing eleven (11) boardwalks that sustained storm-damage from Hurricane Matthew.
  • Boardwalk #23 is completed and open for use
  • Work on Boardwalk #22 is under construction and will remain closed into next week. Pedestrians should use boardwalks at #23 and #21 during this time.
  • Construction of Beachwalk #24 will begin following the completion of #22.
  • Our contractor will continue making repairs to the following boardwalks: 20, 21, 25, 26, 29, 31, 32, and 33A.
  • In addition we will be repairing boardwalk #40 as part of our routine maintenance.
  • Hours of work will be from 7:00 AM to 5:30 PM 
Greenwood Drive Roadside Construction Work

  • Construction activity will continue along Greenwood Drive week of May 27th.
  • We do not expect any traffic delays.
  • Working hours will be from 7:00 AM to 4:30 PM.
  • Crews will be working along the roadway, so please drive with caution.
Mosquito Control

  • Applications will begin toward the end of the week of May 27th
  • The applications will take place at night. 
  • We will be working on the marsh side of Sea Pines from Greenwood Drive and Plantation Drive towards the sound.
Resurfacing Spotted Sandpiper Road and Audubon Pond Road

  • Milling operations will begin on May 28th
  • Work hours will be Monday thru Friday 7 AM – 6 PM.
  • The project includes:
  • road milling
  • milling in proximity to driveways
  • applying an asphalt tack coat
  • root intrusion removal
  • installation of new asphalt surface course
  • We expect the work to take up to two weeks to complete weather permitting.
  • Roadways will not be closed off; access will be permitted.
  • Traffic control will be set up for paving operations, flagmen will be on site.
Tree Work Scheduled

  • Scheduled work days are: June 3 - June 7
  • Work will begin at Lighthouse Rd. Leisure Trail (Between Fraser Cir. and Sea Pines Dr.)
  • Once completed, work will move to the leisure trail on Greenwood Dr. from Fraser Cir. To Greenwood Forest.
  • Road and leisure trail will be open, however, we ask residents to use caution when traveling through the area as it may be an active work zone.
  • Our tree contractor will have their crew members help secure and stop traffic/pedestrians as needed.
  • Work hours are between 7:30 AM and 5:00 PM.
Questions about a Sea Pines CSA Maintenance Project?

Contact the Maintenance Department by email at csamaintenance@csaseapines.com or by phone 843.671.7849. 
In Case You Missed It...
  • 2019 ASPPPO & CSA Annual Meetings video Available - Click here to view


  • Sea Pines CSA Community Referendum Survey Results- Click here to view


  • 2018 CSA and ASPPPO Annual Reports - Click here

  • For Beach Shuttle schedule and map information - Click here

  • Sea Pines Critical Needs Referendum Information- Click here

Sea Pines Community Services Associates 
843.671.1343 | Info@csaseapines.com | www.SeaPinesLiving.com