|
NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.
Bridges & Tunnels:
Hampton Roads Bridge-Tunnel, I-64:
- Alternating, single-lane closures from 9 p.m. to 5 a.m.:
-
Westbound Sept. 19-20
- Eastbound Sept. 20-22
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Single-lane closures northbound Sept. 16-18 beginning as early as 9 p.m., including brief, intermittent stoppages between 11:59 p.m. and 6 a.m.
- Alternating, mobile, single-lane closures northbound Sept. 20 from 9 a.m. to 2 p.m.
James River Bridge, Route 17:
- Alternating, mobile, single-lane closures from 9 a.m. to as late as 3 p.m.:
- Northbound Sept. 19
- Southbound Sept. 20
- Both directions Sept. 22
HRBT Expansion Project:
-
For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.
Elizabeth River Tunnels (Downtown/Midtown Tunnels):
-
Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
|