April marks the annual National Safe Digging Month, reminding Nevada residents to call the statewide 811 hotline (“Call Before You Dig” program) or place online requests through usanorth811.org two working days before beginning digging projects. The Public Utilities Commission of Nevada (PUCN) supports the efforts of the Nevada Regional Common Ground Alliance, sponsors of National Safe Digging Month in Nevada.
“Because state utility regulators and the Pipeline and Hazardous Materials Safety Administration have authority over miles of underground pipe, we cannot stress enough the importance of following safety measures before digging underground,” said Tammy Cordova, Nevada PUCN Commissioner and National Association of Regulatory Utility Commissioners (NARUC) Committee on Gas Chair. “The spring season inevitably brings with it an increase in outdoor projects that can result in hitting buried utility lines. NARUC and state regulators strongly urge anyone undertaking outdoor residential or business projects to call 811 beforehand. The costs of striking and damaging underground gas, electric, communications, water and sewer lines reach billions of dollars annually. A simple call can help prevent these issues and avoid serious health risks.”
Senate Bill 27 (2023) requires contractors to obtain a dig ticket if using mechanical equipment or hand tools. Noncontractors also always need a dig ticket if excavating with mechanical equipment or digging more than 12 inches deep with hand tools. However, it is good practice for everyone to call for a dig ticket whenever excavating regardless of depth.
When calling 811, homeowners and contractors are connected to USA North, Nevada’s 811 call center. USA North notifies the appropriate utility companies of the homeowner’s or contractor’s intent to dig. Professional locators are then sent to the requested dig site to mark the approximate locations of underground lines with flags, paint, or both. Homeowners are encouraged to take the following steps when planning a digging project this spring:
- Always call 811 a few days before digging, regardless of the depth or familiarity with the property.
- Plan ahead. Call on Monday or Tuesday for work planned for an upcoming weekend, providing ample time for the approximate location of lines to be marked.
- Confirm that all lines have been marked.
- Consider moving the location of your project if it is near utility line markings.
- If a contractor has been hired, confirm the contractor called 811. Don’t allow work to begin if the lines aren’t marked.
When natural gas pipelines have been damaged and natural gas is escaping, the following steps are the most important to take, according to PUCN Senior Gas Pipeline Regulatory Engineer Neil Pascual: “Immediately cease work, evacuate the impacted area to minimize the hazard presented by the damaged pipeline, telephone emergency 911 services from a safe area, and contact the utility operator.”
Striking a single line can cause injury, the need for costly repairs, fines, and inconvenient outages. The depth of utility lines can vary for several reasons, such as erosion, previous digging projects, and uneven surfaces. Utility lines need to be properly marked because even when digging only a few inches, the risk of striking an underground utility line still exists. Every six minutes, an underground utility line is damaged because someone decided to dig without first calling 811. In Nevada, about one underground gas line is damaged every day.
For more information about safe digging procedures, please visit call811.com, usanorth811.org, or puc.nv.gov.
|