Featured in the Ashburn District
Monthly Wrap-Up Flyer
| |
Proposed Transmission Line Projects
-
Proposed Transmission Line Project: Aspen to Golden (Scroll Down for More Information)
| | | |
Loudoun County and Virginia News
| | | |
Upcoming Opportunities &
Community Engagement
| | | |
Comprehensive Plan Amendments & Zoning Ordinance Amendments | |
-
Data Center Standards & Locations; CPAM-2024-0001 and ZOAM-2024-0001 (Scroll Down for More Information)
-
Comprehensive Plan Amendment to Remove the planned Gloucester Parkway Extension from the Countywide Transportation Plan (CTP) CPAM-2024-0006 (Scroll Down for More Information)
| | | |
Legislative Applications for Development | |
Significant By-Right Developments | |   |
The link for this edition of the Ashburn District Flyer can be found under today's date, which is located above the table of contents. | |   |
From the Office of the Ashburn Supervisor | |
|
Greetings Ashburn/Lansdowne:
I have three interesting but unrelated items for you in this edition:
First, some late breaking but particularly impactful news for Loudoun County. A small Chinese startup company, DeepSeek, announced about a month ago that it has developed a new open Artificial Intelligence (AI) technology that could revolutionize the data center industry. A New York Times article explained what happened (the article is behind a pay wall, so the following is a layman’s explanation). DeepSeek released a research paper explaining its revolutionary AI logic process, and it sent shock waves throughout the tech industry. Their new AI design allows users to do AI computations at a fraction of the computing power (2,000 AI chips used versus 16,000 AI chips used). Why does this matter? An 87.5% reduction in AI chips needed means an 87.5% reduction in the amount of electric power needed to do the AI computations. Why does this matter to Loudoun County? Because an 87.5% reduction in power needed by our 199 data centers would radically alter our power grid landscape and have a major impact on Dominion Energy’s planned infrastructure buildout for the county. I specifically address this in scenario #2 in the January 1st update to my data center white paper in which I have predicted that three simultaneous developments will occur in the near future within the Loudoun County data center community: 1) the utilities will likely cap the amount of power being supplied to data centers, 2) technological advancements will significantly reduce the amount of power needed, and 3) data centers will begin generating their own power on their sites through the use of microgrids. Scenarios #1 and #3 are already happening now in Loudoun County, and it appears scenario #2 is about to unfold as well. This new development is only two weeks old, so no one in the industry has any idea what the long-term implications are. As the article points out, data centers are almost certainly not going away. But the ripple effects of this development could be significant, and anything that affects data centers has an outsized impact on Loudoun County.
Second, the county released a report recently outlining the results of a tree canopy survey of our county from 2012 to 2023. Here’s the amazing results: during those 11 years, Loudoun’s tree canopy actually increased three percent! That may not seem like a big deal, but it blew me away. Here’s why. For the past 20 years, Loudoun County has been the fastest growing county in Virginia and one of the top 25 fastest growing counties in the nation. And yet, despite that high growth rate involving historic increases in population, housing, roads and commercial enterprises, especially data centers, the outstanding land-use planning by three different Boards of Supervisors enabled our tree canopy to grow by three percent. Interestingly, for 8 of those 11 years, our county was governed by two bi-partisan Boards.
Finally, at the January 7th Board of Supervisors meeting, Chair Phyllis Randall nominated me, and the Board unanimously approved my appointment as Vice Chair of the Loudoun County Board of Supervisors. I am immensely honored and profoundly grateful. I truly love this county, and I love my job. It is, in fact, the best job I’ve ever had. Being the Vice Chair will in no way affect my work as the Ashburn Supervisor, and in truth, I have always felt every Supervisor wears two hats: a district hat and a county hat. But there is no question being the Vice Chair has already broadened my perspective on the issues each of us deals with every day. I look forward to working closely with Chair Randall, one of the most effective leaders I’ve ever known, and with my colleagues, whom I greatly respect, as together we tackle some of the most challenging issues Loudoun County has ever faced.
Cheers, my friends!
Mike
Ashburn District Supervisor
Vice Chair | Loudoun County Board of Supervisors
| |
Resources for Federal Workers | |
Information Regarding Bird Flu Prevention | |
|
Over the past several months, Loudoun County’s Animal Services, Health Department and Virginia Cooperative Extension have been working closely to prepare for and respond to concerns about highly pathogenic avian influenza (HPAI), also known as bird flu.
Current guidance is for residents to notify their local or state government if they observe:
- Five or more dead vultures, waterfowl, shorebirds, or seabirds in the same area within five days,
- Sick or dead eagles, hawks, owls, or turkeys, excluding carcasses found on the road, or
- Ten or more dead wild birds of any other species in the same area within five days
Additionally, the recommendation is that residents do not touch ill or dead animals with their bare hands. In addition to wearing rubber gloves, individuals disposing of a dead animal should wear a mask and eye protection, and should either bury the animal or double bag it before disposing in the trash.
Residents concerned with sick and injured wildlife can contact Animal Services at 703-777-0406. Additionally, they can contact the Health Department at health@loudoun.gov for human health concerns or Extension Services at stuart.vermaak@loudoun.gov for issues with livestock.
Additional resources are available from:
Virginia Cooperative Extension
Virginia Department of Agriculture and Consumer Services
Virginia Department of Health
Virginia Department of Wildlife Resources
| |
Proposed Transmission Line Projects | |
|
New Update: On February 5, 2025, the SCC announced its final decision, approving both the Aspen to Golden and Apollo-Twin Creeks applications for above-ground high-voltage transmission lines. The Aspen to Golden Project decision was consolidated with the Apollo-Twin Creeks Project decision, and the final order can be downloaded here.
-
Previous Update: The SCC Examiner recommended to the SCC on November 1, 2024, to approve of the Aspen-Golden transmission line without any portion being underground. Click here to access the PDF of the SCC’s Hearing Examiner’s recommendation from 11/01/2024.
The county responded to the SCC Hearing Examiner’s Report. Here is a short summary of the county’s rebuttal. The rebuttal can be accessed here, the following summary is from page 33 of the PDF.
Undergrounding Aspen-Golden along as much of Route 7 as possible will not only conform with the County’s 2019 General Plan, preserve the Belmont Viewshed Easement, promote economic development, minimize adverse impacts to the extent reasonably practicable, and be responsive to public opinion. It will also educate the Company, the County, the Commission, and all of us, about the technical and logistical aspects of undergrounding, so that we do not look back on these proceedings ten years from now, throttled by criss-crossing transmission lines, wondering what could have been.
Background:  Dominion Energy has developed proposals for a project named “Aspen to Golden,” a potential transmission route that calls for the construction of new transmission lines that will run from a future Leesburg substation (Aspen) to a future Ashburn substation, near Loudoun County Parkway (Golden). During their virtual and in-person meetings on January 9, 2024, and January 11, 2024, Dominion announced updated proposed routes along Route 7 and Loudoun County Parkway. To view a picture of the proposed routes for Aspen to Golden, click here. For an interactive map of the proposed routes, click  here, scroll down and click "Continue as guest".
Stay Informed:
-
General information landing page for Dominion’s NOVA projects: dominionenergy.com/nova
-
“GeoVoice,” an interactive mapping tool that gives members of the public the ability to review and provide feedback on Dominion’s proposed project routes: geovoice.com/dominion/LoudounCounty
-
“NOVA Virtual Open House,” an interactive website that includes information about all of Dominion’s transmission route plans for Loudoun County: engage.com/novareliability
Contact Dominion Energy:
Dominion Energy has provided the following contact information for questions:
| | | |
2025 Renewal Forms for Loudoun County's Tax Relief Program for Older or Disabled Adults Mailed | Loudoun County Commissioner of the Revenue Robert S. Wertz Jr. announces that participants in the county’s tax relief program for residents who are 65 or older or who are permanently and totally disabled should soon begin receiving their renewal forms. Applications and certifications for tax year 2025 were recently mailed to applicants who are already in the program and to residents who have requested an application for the Loudoun County Tax Relief program for Older or Disabled Adults. | | | |
Broadband Initiative Makes First Connection; Announces Availability to First Area in Western Loudoun | An initiative to expand broadband service to underserved and unserved areas of Loudoun County has connected the first customer in the county—Doukenie Winery in Hillsboro—to All Points Broadband (APB). In addition, another 64 addresses will have the opportunity to connect as work continues. | | | |
Office of the Treasurer to Close One Hour-Early March 13, 2025 | Both locations of the Loudoun County Office of the Treasurer will be closed to the public for one hour, 4:00 – 5:00 p.m., Thursday, March 13, 2025, for a staff meeting. As a result, in-person services and phone services will not be available during that time at the Treasurer’s Office at the Loudoun County Government Center in Leesburg or at the Eastern Loudoun Service Center in Sterling. | | | |
Upcoming Opportunities & Community Engagement | |
Opportunities to Serve: Loudoun Seeks Applicants for Board of Zoning Appeals, Other Boards | |
Loudoun County is seeking applicants to serve on the Board of Zoning Appeals (BZA). There are two openings for members whose term would begin immediately.
The deadline to apply is March 14, 2025. More information, including a link to the online application form, is available at loudoun.gov/bza.
| | | |
Loudoun County to Host Public Sector Job Fair March 18 | |
The Loudoun Workforce Resource Center will host a Loudoun Job Fair on Tuesday, March 18, 2025, 10:00 a.m. - 1:00 p.m., at the Dulles South Recreation and Community Center, 24950 Riding Center Drive in South Riding.
The job fair will primarily focus on the public sector, featuring more than 15 state and local government employers with opportunities in administration, aviation, education, engineering, fire and rescue, health care, law enforcement, transportation, and other fields.
| | | |
Loudoun Offers Mental Health Education & Substance Abuse Prevention Trainings in March | Loudoun County offers ongoing mental health education and substance abuse prevention trainings. All trainings are free, but seats are limited and registration is required, with the exception of Rapid REVIVE! | | | |
Public Input Sought on Proposed Commuter Bus Routes into Loudoun | Loudoun County encourages residents of Prince William County, Virginia, and Frederick County, Maryland, to take a survey to assist with route and schedule planning for Loudoun County Transit’s pilot commuter bus program in those localities. Earlier this year, the Loudoun County Board of Supervisors approved a commuter bus pilot program to provide service from Dale City, Virginia, and Frederick, Maryland, to employment centers within Loudoun County. | | | |
Loudoun County Seeks Applicants for Tourism Grants | Loudoun County’s annual Tourism Grant Program competitive process is underway with the posting of the Fiscal Year 2026 grant application at loudoun.gov/GrantOpportunities. The grant program is designed to support local tourism events and initiatives that drive tourists to Loudoun County. | | | |
Loudoun County Accepting Property Tax Exemption Applications from Charitable Nonprofits | Loudoun County Commissioner of the Revenue Robert S. Wertz Jr. is accepting applications from charitable nonprofit organizations seeking an exemption from Loudoun County real and/or personal property taxes for the 2026 tax year. The deadline to apply for the exemption is Monday, April 1, 2025. | | | |
Comprehensive Plan Amendments & Zoning Ordinance Amendments | |   |
|
The Loudoun County Board has the authority to make changes to the 2019 Comprehensive Plan and the Loudoun County Zoning Ordinance through a Comprehensive Plan Amendment (CPAM) and a Zoning Ordinance Amendment (ZOAM) process.
The Zoning Ordinance regulates land use throughout the county and is the primary implementation tool for the 2019 Comprehensive Plan, a policy document that provides a flexible framework and implementation strategy to meet the county’s future land use and transportation needs. Although CPAMs and ZOAMs are frequently undertaken together, not every project requires both.
The priority for this section is to provide our constituents with up-to-date information about any Board initiated CPAMs and ZOAMs that will impact the Ashburn District
|  
|   |
|
Data Center Standards & Locations
CPAM-2024-0001 and ZOAM-2024-0001
| |
|
On February 6, 2024, the Loudoun County Board of Supervisors directed staff to move forward with a Comprehensive Plan Amendment (CPAM) and an associated Zoning Ordinance Amendment (ZOAM) to update the policies and standards for data center and electrical substation uses.
The Project Plan for Data Center Standards and Locations (CPAM-2024-0001 and ZOAM-2024-0001) will move forward in two phases, click here for more information on the phases.
On July 2, 2024, the Board approved an Intent to Amend the Zoning Ordinance as well as the Revised Project Plan to proceed to a September 24, 2024, Planning Commission public hearing.
On December 12, 2024, the Planning Commission forwarded this to the February 12, 2025 Board of Supervisors Public Hearing.
On February 12, 2025, the Board of Supervisors directed staff to return to the March 4, 2025, Board Business Meeting with draft Grandfathering Resolution options.
Click here for the action report to see the motions for the March 4, 2025 meeting.
On February 12, 2025, the Board also forwarded the CPAM and ZOAM to the March 18, 2025 Board of Supervisors Business Meeting for action.
| |
Comprehensive Plan Amendment to Remove the Planned Gloucester Parkway Extension from the CTP
CPAM-2024-0006
| |
Description: During the January 10th, 2024 Board of Supervisors Public Hearing, a motion was made by Supervisor Turner, and supported by the Board of Supervisors, that directed county staff to initiate and prepare a Comprehensive Plan Amendment to remove the planned Gloucester Parkway extension from the Countywide Transportation Plan (CTP). This planned extension requires construction of a bridge over the Goose Creek to connect Gloucester Parkway to Crosstrail Boulevard.
New Update: On March 4, 2025, the Board decided to remove the eastern segment of the extension of Gloucester Parkway, between Belmont Ridge Rd and Cochran Mill Rd. The item will now come to the May 27, 2025 Planning Commission Public Hearing.
-
Previous Update: The Gloucester Parkway CPAM will be coming to the March 4, 2025 Board of Supervisors Business Meeting.
-
Previous Update: Estimated completion is Spring 2025.
-
Previous Update: The proposed amendment will be referred to the Planning Commission for a future public hearing.
|  
| | |
LandMARC Progress Updates | |
|
On August 14, 2023, Loudoun County launched LandMARC (Land Management, Applications, Research, Coordination). LandMARC is the county's online land management system. More information about LandMARC can be found here.
Stay Informed
Beginning September 26, 2023 there will continue to be twice-weekly updates to share the progress in processing permits. These updates will be posted online at Loudoun.gov/bdpermits. The link to this information is also posted in the LandMARC self-service portal. Loudoun.gov/LandMARC remains the landing page for all industry to get information about the system, including system status, help and how-to guides, and read important updates on the LandMARC blog.
| | | |
Legislative Applications for Development in the Ashburn District | |
Luck Stone Leesburg Plant
Application Number LEGI-2023-0084
| |
Description: "Luck Stone Leesburg Plant" is a Zoning Concept Plan Amendment (ZCPA) Application to amend proffers and development conditions to allow for expansion of mining operation in quarry B, on the east side of Goose Creek, underneath the current processing plant, resulting in the processing plant and point of sale to move to the west side of the property. On the west side of Goose Creek, the application is amending the development conditions to allow for Stonewater Lane to be used for shipping mined materials off-site and to rezone a portion of Luck Stone’s property to allow for data center uses. According to Luck Stone, if this application is approved, the timing of the relocation of the point of sale to Stonewater Lane and the expansion of mining operations in quarry B is subject to several variables but is not currently anticipated for approximately 25 years.
Status remains the same since the 05/23/2023 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
Belmont Cove Rezoning
Application Number: LEGI-2023-0074
| |
Description: “Belmont Cove” is a Zoning Map Amendment application to rezone 8 acres to allow for the construction of 80 multifamily residential units. The residents are currently zoned to Newton-Lee Elementary School, Belmont Ridge Middle School, and Riverside High School.
Status remains the same since the 02/19/2025 newsletter: The Planning Commission has forwarded this application to the March 14, 2025, Planning Commission Work Session.
-
Previous Update: This application is scheduled to come to the January 28, 2025, Planning Commission Public Hearing.
-
Previous Update: This application has been removed from the July 30, 2024, Planning Commission Public Hearing schedule, and another date has yet to be determined.
-
Previous Update: This application is scheduled to come to the July 30, 2024 Planning Commission Public Hearing.
-
Previous Update: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
|
Description: "Century Corner at Goose Creek Village" is an application to amend the concept plan and proffers from a previously approved application (ZMAP-2015-0008) to increase the maximum number of Independent Living (IL) units permitted to be developed from 80 to 120 units (40 additional units) on the Property.
Status remains the same since the 02/19/2025 newsletter: At the February 4, 2025, Business Meeting, the Board of Supervisors voted to approve this application.
-
Previous Update: At the January 15, 2025, Board of Supervisors Public Hearing, the Board voted to send this application to the February 4, 2025 Board of Supervisors Business Meeting.
-
Previous Update: At the November 26, 2024, Planning Commission Public Hearing, the Planning Commission voted to send this application to the January 15, 2025, Board of Supervisors Public Hearing.
-
Previous Update: This application is scheduled to come to the November 26th Planning Commission Public Hearing.
-
Previous Update: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
West Belmont
Application Number: LEGI-2024-0018
| |
Description: "West Belmont" is an application to rezone approximately 27 acres to allow for development of approximately 367 residential units and 11,000 square feet of retail.
Status remains the same since the 07/02/2024 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
National Conference Center Residential
Application Number: LEGI-2024-0024
| |
Description: "National Conference Center Residential" is an application for a Zoning Map Amendment of 46.62 acres to (Suburban Compact Neighborhood-8) SCN-8 (36.42 acres) and (Suburban Compact Neighborhood-16) SCN-16 (10.20 acres) to introduce a mix of single-family detached, single-family attached, and multifamily attached dwellings.
Status remains the same since the 07/02/2024 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
Northstar Square
Application Number: LEGI-2023-0020
(Formerly known as "Mercer Crossing")
| |
Description: "Northstar Square” is a proposed application to rezone 110.86 acres to allow the construction of 1,138 dwelling units. These include 297 single-family attached units, 485 multi-family stacked units, and 356 multi-family attached units. The residents are currently zoned to Newton-Lee Elementary School, Belmont Ridge Middle School, and Riverside High School.
Status remains the same since the 07/02/2024 Newsletter: The applicant has sent an update to the county that they are sending “an updated Land Development Application”.
-
Previous Update: The Northstar Square rezoning application was removed from the September 13th (2023) BOS Public Hearing agenda, by the developer. The developer has indefinitely deferred this application.
-
Please see the application for this parcel in the “Significant By-Right Developments in the Ashburn District” section below, under the application titled "Belmont Landbay KK Data Center."
-
Previous Update: At the June 8th (2023) Planning Commission Work Session, the Planning Commission voted to send the Northstar Square application to the September 13th (2023), Board of Supervisor's Public Hearing, with a recommendation of approval.
-
Previous Update: After the Planning Commission voted to send the Northstar Square application to the Board of Supervisors, with a recommendation of denial, the applicant requested that the recommendation be reconsidered, the recommendation was rescinded, and was sent back to the Planning Commission’s Work Session on June 8th (2023).
-
Previous Update: At the April 13th (2023), Planning Commission Work Session, the Planning Commission voted to send this application to the June 14th Board of Supervisors Public Hearing.
-
Previous Update: At the February 9th (2023) Planning Commission Work Session, the Planning Commission voted to send this application to future work session on April 13th (2023).
-
Previous Update: This application is scheduled to come to the February 9th (2023) Planning Commission Work Session.
-
Previous Update: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with via email at mike.turner@loudoun.gov.
| | | |
Spring Valley Technology Park
LEGI-2024-0074
| |
Description: A Zoning Map Amendment for 362 acres from TR-10 to IP, A Special Exception to establish 3 utility substations "Utility, Major", A Minor Special Exception to allow battery energy storage system on the property and a Minor Special Exception to reduce the setback adjacent to zoning districts permitting residential use.
New Update: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with via email at mike.turner@loudoun.gov.
| | | |
Significant By-Right Developments in the Ashburn District | |   |
By-right: A "by-right" development is an application that does not require approval from the Board of Supervisors. The approval/denial of applications for by-right developments are managed administratively by county staff and must conform to the current zoning ordinance. | |   |
|
Description: “CyrusOne Broadlands Data Center” is a by-right application which plans to build a 41,000sf data center on 58 acres. The underlying zoning in Planned-Development Industrial Park (PD-OP). Data Centers are allowed by-right on PD-OP zoned land.
Status remains the same since the 01/26/2024 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this administrative application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | |
|
Description: “Belmont Landbay KK Data Center” is a by-right site plan approval request to develop data centers on approximately 51 acres that is zoned for Planned Development Office Park (PD-OP). The applicant proposes developing two data center buildings, one substation and one office building.
Status remains the same since the 01/26/2024 Newsletter:
County staff from multiple departments are reviewing this application.
For more information on this administrative application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | |
Road Improvements in the Ashburn District | |
|
Waxpool Road & Faulkner Parkway Roundabout
Application Number: CPAP-2021-0039
(Road Improvement)
| |
Description: CPAP-2021-0039 is a construction plan profile (CPAP) for the design of a two-lane roundabout, to be built at the T-intersection of Waxpool Road and Faulkner Parkway. This roundabout was proffered as a part of the Waxpool Crossing application (ZMAP-2019-0020), which was approved by the Board of Supervisors in 2021.
Status remains the same as the 02/03/2025 newsletter: The Construction Plans and Profiles (CPAP-2021-0039) for the Waxpool Road and Faulkner Parkway Roundabout have received final approval from Loudoun County on November 4, 2024. Please see above for a photo of the final plan. The project, which includes a two-lane roundabout at the intersection, is now ready to proceed, with the following remaining permit requirements:
- Soil Tests & Pavement Approval: Soil tests must be conducted on the constructed subgrade to determine actual CBR values and must be approved before paving.
- Grading Permit: If offsite grading is required, letters of permission must be obtained before submitting the grading permit application.
- VDOT Permit: Any work within the VDOT right-of-way requires a permit from the Leesburg VDOT office before construction begins.
-
Previous Update: The applicant is working to secure permits for this project, as well as acquiring easements from adjoining property owners, and coordinating utility relocations with Dominion Energy, Verizon and Washington Gas. The outstanding permits for this project are a grading permit, a VDOT Right of Way (ROW) permit, as well as VDOT's approval of the proposed Maintenance of Traffic Plan.
-
Previous Update: Engineering plans have been approved. County staff is working with the applicant to complete any outstanding items that remain.
-
Previous Update: Engineering plans were submitted by the applicant and are being reviewed by county staff from multiple county departments.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | |
VDOT 511
511 provides users with real-time, accurate traffic information from the Virginia Department of Transportation (VDOT) about road conditions, traffic congestion, and highway construction anywhere you are, anytime you need it.
More information on VDOT 511 can be found here.
| |
Online Process for Building Permits, Land Development Applications
Homeowners and residential contractors can submit their completed application form and supporting documentation, including drawings and plats, in PDF format for most residential construction projects to the Department of Building and Development online. More information about the online submission process and requirements is available here.
| |
Residential Traffic Calming Guide
Loudoun County’s Department of Transportation and Capital Infrastructure (DTCI) manages an eight-phase process to address traffic calming, which considers residents’ concerns regarding speeding, safety and overall quality of life on publicly-maintained residential streets.
| |
Who Maintains my Street?
To identify which entity responsible for maintaining your road/street, Loudoun County made an online color coded mapping system which helps residents determine who to contact when work needs to be done.
| |
Report a road problem
VDOT created an easy to use online form to report unsafe and hazardous road conditions. Similarly, work requests for state-maintained roads can also be made here.
| |
Paving Schedule
VDOT reports what roads will be paved during the fiscal year and updates their website with progress updates.
See VDOT's Paving Schedule here.
| |   |
As your representative on the Loudoun County Board of Supervisors, my top priority has been to serve your needs and work towards the betterment of our community. Please don’t hesitate to contact me directly or my staff with any input and ideas you may have for the Ashburn District. The best way to reach me is by email, which I monitor on a regular basis. | |   | | | |