|
Tierra Contenta Trail
Construction is underway on the Tierra Contenta Trail from the existing trail terminus near Buffalo Grass Road to South Meadows Road. When the trail is completed, it will help connect neighborhoods to Sweeney Elementary School and Ortiz Middle School, both located on South Meadows Road.
Acequia Trail
The Acequia Trail from the South Meadows and Rufina Street roundabout to San Felipe Road and the El Camino Real Trail at Agua Fria is currently undergoing design with construction slated to begin this fall. This project is one leg of an envisioned loop in the southside that will open the door to safer transportation and recreation options.
Arroyo Hondo Trail
The County Arroyo Hondo Trail (pictured above) is under construction! The new, primarily east/west segments are part of a picturesque network that will ultimately connect the 599 Rail Runner Station, Highway 14, and the Santa Fe Community College. Construction from the Turquoise Trail Sports Park to the Community College should be completed later this year.
River Trail
Regular readers of our newsletter will already know that the next segment of the River Trail, from Siler to San Isidro, is estimated to open this summer following the completion of the river restoration and the paving of Pasada San Juan.
|