Colleagues,
In my second installment on the role of the Physical Environment consultant during our mock surveys, we will discuss the Emergency Management Session.
As was stated a couple of weeks ago:
-
Emergency Management: One of the critical responsibilities of our Physical Environment consultants is to conduct the Emergency Management tracer. This task, which is crucial for ensuring the safety and preparedness of our facilities, is carried out with the utmost professionalism and expertise.
- During an actual survey, depending on the size of your facility, this activity may be performed by the Nurse or Physician surveyor rather than the Life Safety surveyor.
Firstly, the entire Emergency Management (EM) chapter was reformatted and revised effective July of 2022. Here is a link to that chapter.
Additionally, The Joint Commission developed a 2022 reference guide on emergency management standards. Here is a link to that guide. The guide is intended to assist facilities in navigating the old standards and elements of performance as well as the new or revised standards. There have been some adjustments including cancellations, additions, and (in many cases) several elements of performance were rolled up together. The biggest goal accomplished with this update was achieving greater alignment with both the CMS appendix Z requirements and items on emergency management addressed in NFPA 99.
Many of us start with this session that kicks off with a review of the organization's Emergency Operations Plan (EOP). I believe it is important to note that if the EOP is strictly a response-based document (the "what" we do during an emergency), then we will expect to find a formal written EM program, much like a regular Environment of Care management plan.
We are looking for a document that addresses the "how," the EM program is managed and implemented. After reviewing the "how" we manage the EM program, we review the EOP, look at the Incident Command program and policies that address 1135 waivers, and the assigning of disaster privileges and Continuity of Operations Planning. During this part, we are also asking questions regarding communications, resources and assets, patient clinical support and, of course, Utilities including how we prepare for emergencies involving the loss of utilities.
Once we complete the EM written program assessment, and the EOP, we typically jump right in an assessment of the Hazard Vulnerability Analysis (HVA). We are looking at how the HVA was developed, who participated in the development, and how leadership and the community are involved. The HVA cannot be developed and approved in a vacuum. When I perform the review of the HVA, I am taking notes. I'm looking at what the organization identified as their highest vulnerabilities in the category of natural, manmade, and utility losses. I use those vulnerability scores to ascertain what the organization has done to minimize the impact or mitigate the potential. For example, I would expect an organization that has only one generator to have identified a loss of that generator as high risk. To mitigate I would expect to find a formal agreement with a vendor to provide a temporary unit very quickly, and for the organization to have planned how they would tie that temporary generator into their emergency power system.
Before opening up the EM session for questions and answers, we review the last several After Action Reports (AAR's) of implementations of the EOP. Specifically, I'm looking to ensure that the AAR's were (of course) completed, that they contained an assessment of the "response," and that (at a minimum) they contain reference directly or inferred that the required elements were assessed.
Those elements being:
- Communications,
- Staffing,
- Resources,
- Assets,
- Patient Clinical and Support activities,
- Safety and Security,
- and Utilities.
All components need to be evaluated during an implementation. We look to ensure that the AAR addresses action items / improvement opportunities, and we assess to ensure that the organization has acted upon those identified improvement opportunities. The last part of the AAR review (for me) is to return to my HVA notes and determine if the higher prioritized vulnerabilities were addressed during the implementation. One of our required activities in the EM standards chapter is to take action to minimize those vulnerabilities. If not accomplished in another manner, we would expect that, at a minimum, the organization uses these exercises to lower their risk score by increasing their response capability, which is the purpose of the exercises.
I want to thank you for your time and interest. The next installment will be activities undertaken during the build tour activities.
Harold
|