Hello SLC3 Community,


Hello SLC3 Community,


I truly hope you are enjoying the cooler weather that has finally sprinkled in! Whether you are reluctantly letting go of summer or eagerly awaiting “real” fall, I hope you are finding time to enjoy the season.


On October 10, we hosted a fantastic, insightful program focused on something that touches all of us in the AEC community: how we adapt, communicate, and work together to improve project outcomes. In this newsletter, we are sharing key takeaways so the learning can continue beyond the room—and, hopefully, spark useful conversations within your own teams.

That has been central to SLC3’s purpose since our founding. We bring people together to share experiences, exchange best practices, and help our region’s design and construction community improve. From thoughtful program planning and knowledgeable speakers to meaningful follow-up, we want each educational opportunity to give you something you can put to work.


As you consider future programs, know that we are listening to the challenges you face and planning discussions around what matters to our industry. Bringing different perspectives to the table, including those of owners, helps us better understand how decisions affect everyone involved in a project. Your participation adds to that conversation, and sharing what you learn with your team extends its value.


With that in mind, our upcoming Owner’s Roundtable is taking a new approach! The program will include both a panel discussion and roundtable conversation, giving participants a broader opportunity to hear the concerns, priorities, and perspectives of participating owners.


Through our Owner Chats and individual conversations, I have had the unique opportunity to hear what is on owners’ minds. This format will help bring more of those insights directly to you, with practical takeaways to inform your relationships, your organization, and your projects.


Please explore the events below and consider who on your team would benefit from attending. Continuing education and connection deserve a place on our calendars, even when schedules are full. The feedback we receive reminds us that these opportunities make a difference.


Last week, our Safety Committee met and we had 10 owners participating and just two contractors. I know Safety matters to all, so this is your chance to have a seat at our table. Take advantage.


Lastly, please take a moment to respond to this week’s survey. I am curious to see the results and will share them with you. I am noticing shifts in the industry and some hesitation around “business as usual.” Your input will help us better understand what you are experiencing and where SLC3 can provide the most value. The more we know, the better we can serve you.

Have a fantastic week, and make time to take advantage of the opportunities to learn, grow, and connect. If you are joining us at the Clay Shoot this Friday, I look forward to seeing you there


Warmly,

Kelly

Kelly Jackson

Executive Director

St. Louis Council of Construction Consumers (SLC3)

What is most affecting your organization today?

AT A GLANCE...

INSIDE THIS ISSUE


News & Updates

Building a Legacy of Giving: Helmkamp Cares Surpasses $1 Million


Great Rivers Greenway's Next Wave of Investment


Beyond Construction Inclusion Week: Building a Workplace Where People Can Thrive


Lambert's Next Chapter: Planning an Airport for the Future



Training & Education

Built to Adapt: SLC3 Brings Industry Leaders Together to Explore Project Adaptability


The Capacity Reset: The Power of “Not Right Now”


Lessons Learned: The Most Valuable Project Is the One That Improves the Next One

Facebook  LinkedIn  Instagram

ARE YOU WANTING TO BE AN ANNUAL SPONSOR?

Want to sponsor our newsletters? Contact us! 65% Open Rates! Great opportunity for visibility and showing support!

PLATINUM SPONSOR

 
 

UPCOMING PROGRAMS & EVENTS

 

THIS FRIDAY!!! LAST CHANCE TO REGISTER TODAY!!! CHANCE TO WIN $500 CASH FOR ATTENDING!

DESCRIPTION OF EVENT:

This program is very similar to the Owner's Roundtable! However, we are asking our owners to share key topics that is most on top of mind in which they will go into greater depth at their hosted table. You will be able to join their table on a first come first serve basis. shortly after the break. Don't miss this inventive way to connect, learn and support your client's needs!

MEMBER HIGHLIGHTS

Member Highlight: Ryan Perryman Joins Holland Construction Services


Congratulations to SLC3 member Ryan Perryman on his new role as Senior Vice President at Holland Construction Services!


With more than two decades of experience in building design and construction, Ryan brings extensive industry knowledge, leadership, and valuable relationships to his new position.


After spending the past five years leading infrastructure projects across the Midwest, Ryan describes his return to the building construction industry as a homecoming.


SLC3 congratulates Ryan on this exciting next chapter and wishes him continued success at Holland Construction Services!


Building Connections: Great Rivers Greenway's Next Wave of Investment

OWNER MEMBER SPOTLIGHT | GREAT RIVERS GREENWAY


A greenway may look like a simple path through a neighborhood. Behind it is a coordinated investment in transportation, engineering, public space and community connections.


For Great Rivers Greenway, an SLC3 owner member, that work continues to take shape across the region. An August funding approval committed approximately $10.5 million in federal investment to projects along the Brickline, Hodiamont and Centennial greenways, supporting future construction in St. Louis City and St. Charles County.


The projects offer a useful look at the infrastructure behind a connected region, from safer street crossings to wider bridges and improved drainage.


Three Projects, One Connected Vision


On August 26, East-West Gateway Council of Governments’ Board of Directors approved funding for three projects:

NEWS & UPDATES

Building a Legacy of Giving: Helmkamp Cares Surpasses $1 Million

A construction company’s impact can reach well beyond the projects it delivers. For Helmkamp Construction Co., that impact includes scholarships, support for local families, health initiatives, and employees coming together to decide where their generosity can do the most good.


The East Alton-based company announced on October 12 that the Helmkamp Cares Foundation has surpassed $1 million in charitable giving since its establishment in July 2019. Over that time, the foundation has supported more than 100 organizations, bringing together employees, industry partners, and the community around a shared commitment to service.


Behind the milestone is a simple idea: give employees a meaningful voice in giving back.


A vision built into the company’s culture


Helmkamp CEO and Owner Rob Johnes established the foundation one year after taking ownership of the company. His vision was to build on Helmkamp’s long-standing tradition of philanthropy through a formal foundation that could strengthen community relationships and expand its reach.


Marketing Director Jen Jackson served as the inaugural committee chair for the first five years, helping establish the foundation’s direction and core values.


Today, Project Coordinator Alyssa Spa chairs a committee of nine employees whose roles span accounting, project management, safety, superintendent responsibilities, and other areas of the company. Bringing those perspectives together helps ensure giving decisions reflect the interests and passions of the people behind Helmkamp’s work.

Beyond Construction Inclusion Week:

Building a Workplace Where People Can Thrive

Construction depends on people. Every project brings together different skills, experiences, companies, and perspectives. Creating an environment where those people feel respected, supported, and comfortable contributing deserves attention throughout the year.


Construction Inclusion Week, observed October 12–16, 2026, offered the industry an opportunity to focus on expanding career opportunities, supporting professional growth, and building a sense of belonging. As the week concludes, the next step is carrying that focus into daily work.


From Welcoming People to Supporting Their Success


Getting someone interested in construction is only the beginning. What happens after they arrive matters, too.


Does a new employee know whom to ask for help? Can an apprentice raise a question without feeling embarrassed? Are employees given clear guidance and opportunities to develop their skills? Do project partners feel comfortable bringing a concern to the table?


These questions make inclusion tangible. They connect workplace culture to the conversations, decisions, and relationships that shape someone’s experience in the industry.


Construction Inclusion Week encourages participation across the project team, including owners, contractors, subcontractors, suppliers, architects, and engineers. Its emphasis on workforce development connects recruitment with the workplace conditions that help people stay and grow.


PROJECT SPOTLIGHT

Lambert's Next Chapter: Planning an Airport for the Future

PROJECT SPOTLIGHT | ST. LOUIS LAMBERT INTERNATIONAL AIRPORT


An airport transformation begins long before travelers step into a new concourse. It starts with decisions about capacity, infrastructure, operations and how to build for the future while keeping an essential transportation hub moving.


At St. Louis Lambert International Airport, an SLC3 owner member, those decisions are shaping the proposed Consolidated Terminal Program, a major modernization effort intended to bring passenger operations into a single terminal complex.


For the region’s architecture, engineering and construction community, the project offers a look at the coordination behind transforming a working airport.


More Than a New Terminal


Lambert’s proposed transformation reaches well beyond the spaces passengers see at their gates.


The airport’s planning materials and design solicitation identify a connected program of improvements, including:

  • A renovated terminal and new concourse with gates on both sides
  • A centralized security screening checkpoint
  • A new federal inspection facility for international arrivals
  • An all-new baggage system and updated building systems
  • Reconfigured roadways, an improved entrance and expanded parking


Together, these elements address passenger circulation, aging facilities, operational reliability and the infrastructure needed to support a modern airport.


Each component also affects the others. Roadway design influences access to the terminal. Security and baggage systems shape the building’s layout. Gate placement affects aircraft operations and the distance passengers walk.


From a project-delivery perspective, that interdependence makes early coordination essential.

The Grid Behind the Growth:

Why Ameren's Infrastructure Investment Matters to St. Louis Construction

OWNER MEMBER SPOTLIGHT | AMEREN


The buildings attracting the most attention across St. Louis may be data centers, manufacturing facilities, hospitals and major redevelopment projects.


But none of them happen without the infrastructure behind them.


A newly released economic-impact study from Ameren provides a timely reminder that the region’s construction pipeline is increasingly connected to another enormous category of investment: the electric grid.


According to the study, Ameren’s operations, infrastructure improvements and economic-development activity supported approximately 63,000 jobs and $25.9 billion in economic output across Missouri and Illinois in 2025. Ameren also reported spending approximately $2.5 billion with in-state vendors.


Those numbers tell an economic story. For the AEC industry, they also tell an infrastructure story.


Growth Starts Before the Building


As St. Louis competes for increasingly sophisticated projects, site readiness means much more than available acreage.


Owners considering major investments must understand:


  • Available electrical capacity
  • Transmission and distribution infrastructure
  • Substation requirements
  • Utility lead times
  • Redundancy and reliability requirements
  • Future expansion capacity
  • Coordination between utility infrastructure and project schedules


Those questions are particularly important for power-intensive facilities such as advanced manufacturing operations, research facilities, healthcare campuses and data centers.


In other words, some of the most important work determining whether a future St. Louis project moves forward may happen well before a construction trailer arrives on site.


Modernizing an Aging System


That work is already visible locally.


In July, Ameren Missouri energized an upgraded substation in Dellwood serving approximately 4,500 customers in north St. Louis County. The project replaced equipment that had been in service for more than 60 years and incorporated modern switchgear and automated controls designed to identify problems and restore service more efficiently.


A single substation project may not command the same attention as a new skyline-changing development, but investments like it are fundamental to the region’s ability to support both existing communities and future growth.

Beneath St. Louis: MSD's Nearly $1 Billion River Des Peres Tunnel

PROJECTS TO WATCH | REGIONAL INFRASTRUCTURE


Some of the region’s most substantial construction investments will never become part of its skyline.


Approximately 200 feet beneath St. Louis, a planned wastewater storage tunnel will help address a challenge facing many older communities: what happens when heavy rainfall overwhelms a combined sewer system.


MSD Project Clear’s Lower & Middle River Des Peres Storage Tunnel represents a major investment in that solution. MSD, an SLC3 owner member, describes an approximately nine-mile-long tunnel with a 30-foot inside diameterdesigned to capture and temporarily store combined stormwater and wastewater before it can overflow into River Des Peres.


For the architecture, engineering and construction community, the project offers a look at the scale and coordination behind essential underground infrastructure.


Managing Water Before It Reaches the River


In a combined sewer system, stormwater and wastewater travel through the same pipes. During heavy rain, flows can exceed the system’s capacity, resulting in combined sewer overflows into nearby waterways.


The planned tunnel will generally follow River Des Peres, capturing that mixed water before it enters the river. Drop shafts will carry flows from shallower sewers into the deep tunnel, where the water can be stored until it is treated at MSD’s Lemay Wastewater Treatment Plant.


That storage function is central to the project. By providing space to hold wet-weather flows, the tunnel will help the system manage periods when rainfall places the greatest demand on existing infrastructure.


A Substantial Underground Construction Program


The tunnel itself is only part of the planned work. MSD’s public project overview identifies several major components:

  • An approximately nine-mile main tunnel with a 30-foot inside diameter
  • Two connecting tunnels, each approximately half a mile long
  • Large construction shafts providing access to the underground work
  • Thirty-four intake structures
  • A substantial excavation for a future cavern-style pump station


MSD lists Jacobs as the design engineer and Black & Veatch as the construction manager. Its published project information identifies an estimated construction cost of $995 million, with construction anticipated to begin in 2029 and finish in 2038.


Those dates are planning estimates, but they illustrate the long delivery horizon associated with infrastructure of this scale.


Deep Construction, Surface-Level Coordination


Although much of the finished infrastructure will be underground, delivering it requires careful coordination above ground.


From a project-delivery perspective, shafts, intake structures and connections to existing sewers create interfaces with streets, utilities and surrounding neighborhoods. Construction access, material movement and site restoration must be considered alongside the tunneling work.


For owners and project teams, this highlights the importance of planning the entire system. The main tunnel, connecting structures and treatment operations must function together, while the construction approach must account for the communities above them.


Planning for the Long Term


MSD’s public project page includes materials from a June 2026 neighborhood meeting at Alaska Park, giving residents access to information about the planned work.


Community communication is particularly relevant for a project with a lengthy planning and construction period. Residents may experience individual work sites and construction phases without seeing the full underground system those activities support.


Clear explanations of the project’s purpose, local work and anticipated sequencing can help connect those visible activities to the broader infrastructure investment.


Built to Adapt:

SLC3 Brings Industry Leaders Together to Explore Project Adaptability

Snapshot of what was learned...

On October 8, SLC3 brought the architecture, engineering, and construction community together at Greenbriar Hills Country Club for BUILD Series: Build to Adapt, a training and education program focused on navigating the challenges that arise when project plans change.


The discussion brought together professionals whose different responsibilities offered a broad perspective on project adaptability, from the owner’s priorities to the coordination and decisions required across project teams.


Moderated by Rick DiFani, Vice President of LUZCO Technologies, the panel featured:

  • Lusnail Haberberger, Founder and President, LUZCO Technologies
  • Frank Niemerg, Director of Project Management, Ameren
  • Trey Wiegmann, Vice President of Construction Services, Poettker Industrial Services
  • Nick Kampwerth, Engineer, Plocher Construction


Even the best project plans encounter changes. What matters is how teams recognize challenges, communicate their impact, and respond together.


SLC3’s Built to Adapt: Real-World Leadership for Projects That Don’t Go According to Plan brought owner, engineering, and construction perspectives together for a practical discussion about keeping projects moving. The conversation reinforced that adaptability begins well before a problem occurs—with thoughtful planning, clear responsibilities, and the trust to speak openly.


Here are six takeaways to bring back to your team.


1. Make the schedule a shared planning tool.


A schedule needs to do more than establish a baseline. It should help everyone understand current conditions, critical activities, dependencies, and the decisions required to maintain progress.


Diligent review of the critical path helps teams assess how changes affect the entire project. Owners need clarity from contractors, and contractors need timely input from owners and other stakeholders. Breaking activities into meaningful detail—including submittals, procurement, and approvals—helps expose potential delays earlier.


Put it into practice: Review what has changed, what is at risk, and who needs to act at each schedule meeting.


2. Plan for what could go wrong before it does.


Supplier delays, space constraints, and execution challenges can quickly reduce the time available to respond. Discussing those risks early gives teams more options.


Contingency planning should establish more than a backup idea. Teams need to understand what would trigger a change in approach, who can authorize it, and how the response would affect other work.


Put it into practice: For major risks, ask: “If this happens, what will we do—and who makes that decision?”


3. Communicate problems while there is still time to respond.



Teams cannot address problems they do not know about. Concerns should surface promptly, and changes should reach every stakeholder whose work or decisions may be affected.

That requires an environment where people feel comfortable raising an issue without fear of blame. Trust makes early communication possible; clear accountability turns that communication into action.


Put it into practice: Establish a clear process for reporting issues, identifying affected parties, and assigning follow-up.


4. Give people the authority to keep work moving.


Unclear decision-making creates roadblocks. Project teams need to know who owns each decision, when it is needed, and when to escalate.


Equipping managers closest to the work to make decisions within defined limits can prevent unnecessary delays. Speed still requires judgment: rushing without enough information can create rework.


much more..continued...

PICS

The Capacity Reset: The Power of “Not Right Now”

Here's a question:


How many things are currently sitting in the back of your mind that you feel like you should be doing?


Not necessarily today.


Not necessarily this week.


But they're there.


That idea you want to explore. The person you need to call. The process you want to improve. The professional organization you should become more involved with. The article you want to read. The project you haven't quite gotten to.


Individually, they may be small.


Collectively, they become mental clutter.


And for many high-performing professionals, there's another problem:


We're really bad at saying no.


But It Doesn't Have to Be Yes or No


Someone asks you to participate on a committee.


It's a great opportunity.


But you're already overloaded.


Someone suggests a new initiative.

Owner Perspective Series | Week 7

Lessons Learned: The Most Valuable Project Is the One That Improves the Next One


When a project reaches completion, the focus often shifts quickly to the next assignment. The ribbon is cut, the team disbands, and everyone moves on.


But one of the most valuable opportunities is often missed.


The Construction Industry Institute (CII) identifies Lessons Learned as a best practice because organizations that intentionally capture project knowledge consistently improve future project performance. Every project—whether highly successful or challenging—contains valuable insights that can reduce risk, improve efficiency, and strengthen decision-making on the next one.


Unfortunately, too often those lessons walk out the door with the project team.


The best organizations don’t wait until the end of a project to ask, “What did we learn?” Instead, they create a culture of continuous improvement by discussing successes and challenges throughout the project lifecycle.

 

CALL FOR COMMITTEE MEMBERS? TIME TO HELP...


Much of the work we do is driven by member volunteers, and right now our committees could use a few more voices and helping hands. Committee service offers an opportunity to influence priorities, collaborate with peers, and support initiatives that impact the industry and our region. If you’re willing to get involved—even in a small way—we invite you to sign up.

 

HELP US KEEP THE PICTURE CURRENT

The construction and development landscape across the region continues to move quickly—and keeping our information accurate and relevant matters.


We’ve recently updated our construction and development listings to reflect new projects, changes in scope, and activity across the greater St. Louis area. These updates help ensure that our members have access to timely, useful insight into what’s being built, redeveloped, and planned throughout the region.


That said, no one has a better pulse on what’s happening than the people working in it every day. If you’re aware of a project that’s underway, planned, or evolving—or if you notice something that needs to be updated—we invite you to share it with us. Your input helps strengthen the resource for everyone.


Keeping this information current is a collaborative effort, and we appreciate your help in making it as accurate and valuable as possible.


Have something to share? Reach out anytime—we’re always glad to hear from you.

ST. CHARLES COUNTY BIDS

ST. LOUIS COUNTY BIDS

CITY OF ST. LOUIS BIDS

JEFFERSON COUNTY BIDS

SIBA BIDS

 

GOLD SPONSORS

 
 
 
 
 
 

SEND US YOUR COMPANY UPDATES!

SILVER SPONSORS

Your SLC3 Membership, in your Pocket


Stay connected wherever the workday takes you. With the free MemberPlus app, you can browse upcoming SLC3 events, register from your phone, catch up on news, find fellow members in the directory, and access member resources. You can also update your profile on the go.


Download MemberPlus from the Apple App Store or Google Play, then sign in with your existing InfoHub credentials. Your app access will match your InfoHub access.

 

SLC3 2026 Officers:

Michael Hargrave (BJC Health) - President

Vince Nutt, (BJC Health)- 1st Vice President

Mark Flannery (Bayer), 2nd Vice President

Tiffanie Toles, (Kwame Building Group)

Secretary

Danielle Thomas (Hazelwood SD), Treasurer

Frank Niemerg (Ameren), Immediate Past President

Kelly Jackson, Executive Director

If you are considering joining us, contact Morgan McDevitt about Membership. Don't miss our member-only activities and perks!

 October: Did You Know?


🏗️ Our most famous construction project has an October birthday.


The Gateway Arch’s final section was installed on October 28, 1965. That means our skyline’s signature landmark turns 61 this month! 


⚾ St. Louis once hosted both sides of the World Series.


In October 1944, the Cardinals faced the St. Louis Browns, with every game played at Sportsman’s Park. The Cardinals won four games to two. Talk about a hometown rivalry! 


🍂 Missouri’s fall color show can last longer than you think.


Because our trees, shrubs, and woody vines change at different times, Missouri’s fall color season can stretch six to eight weeks. Sassafras, sumac, and Virginia creeper are among the early performers. 


📅 Missouri has its own day—and it’s in October.


The third Wednesday in October is officially Missouri Day, celebrating our state’s history. This year, it falls on October 21. Consider it an excuse to brush up on your Missouri trivia!

DON'T FORGET: If you are a member of the SLC3 you can access all our members in the InfoHub. Make sure to login and regularly check it out!

Architectural Designer

Oculus, Inc


Transmission Project Manager

Luzco



VDC Specialist

Guarantee Electrical Company



Signage & Brand Production Designer

Arcturis


Architect

CDG Engineers


Sr. Mechanical Engineer

CDG Engineers


Electrical Engineer

CDG Engineers


Structural Engineer

CDG Engineers


Architectural Designer

Lawrence Group


Sr. Architect or Sr. Architectural Designer

Lawrence Group


Architectural Project Manager

Lawrence Group

Project Manager (Transportation, All Offices)

Horner & Shifrin



Associate Project Manager

Archkey Solutions

 

Looking to fill a position? Send us your roles and we will promote them!


WE SHARE POSTINGS FOR FREE TO THOUSANDS!

 

BRONZE SPONSORS

(WE SHOULD HAVE MORE SPONSORS HERE????)

 
 
 

St. Louis Council of Construction Consumers

301 Sovereign Ct, Suite 101, Ballwin, MO 63011

636.394.6200 | info@slccc.net | slccc.net


Staff:

Kelly Jackson // Executive Director

Morgan McDevitt // Membership Engagement Manager

CONNECT, INTERACT & SHARE WITH US!

Facebook  Linkedin  Instagram

Please note unsubscribing from this communication will unsubscribe you from ALL communications from the SLC3.