April - Construction Update

Welcome back to the City of Somerville's construction newsletter!

The start of a new season of construction can inspire dreams of safer streets and more efficient water delivery systems. It can also conjure the sounds of jackhammers and memories of time spent navigating periodic detours.  


With all of this in mind, we want to make sure you know what is happening, where it's happening, and how it ultimately benefits our city. That's what this email is for. 


As always, if you have any questions about the work below (or any work in the city) please don't hesitate to reach out to us at

construction@somervillema.gov.


What We're Sharing This Month: 


  • Intersection Improvements: Bow St. at Walnut St. and Washington St. at Merriam St.
  • Reconstruction Resumes on Tufts Street
  • More Streets Slated for Pavement and Sidewalk Improvements
  • 115 Sycamore Street School Building Newsletter
  • Subterranean Somerville – Coming Soon: A Large Diameter Trunk Drain
  • Keeping up to date 
  • We can’t cover all the work in one newsletter 

¿Quiere información sobre construcción en español? 


Si es que usted o algún vecino/conocido quisiera recibir noticias en español sobre las construcciones, suscríbase escribiendo un correo a dirigido a Magdalena Gomez al mgomez@somervillema.gov.  


Y recuerde que para toda información o evento de la Ciudad usted puede solicitar traducciones o interpretación en vivo contactando a la Oficina de Asuntos de Inmigrantes de Somerville escribiendo un correo a somerviva@somervillema.gov o llamando al 311 (617-666-3311). 

Intersection Improvements:

Washington Street at Merriam Street

Bow Street at Walnut Street

Late last year the City installed a new raised crossing, improved bus stops, and more at the intersection of Somerville Avenue and Central Street. This work was one of five targeted, high priority intersection improvement projects. 

New raised crossing installed late last year at the intersection of Central Street and Somerville Avenue.

This spring/summer City contractors will undertake work on the two remaining intersections, both located in the Union Square area.  


  • Washington Street at Merriam Street 
  • Bow Street at Walnut Street


More information on each of these efforts is included at the page below.

Tufts Street

Reconstruction Resumes

Work to make Tufts Street safer and more comfortable for everyone whether they are walking, rolling, biking, or driving, is back underway. 


Crews are back out on the streets following a winter's hiatus--installing new drainage structures and rebuilding the remaining sidewalks.

New drainage being installed on Tufts Street to support the new street design.

Remaining Work


Major items in anticipated order of operations:


  • Installation of remaining new drainage structures needed to better manage stormwater on the newly designed street. 
  • Reconstruction of remaining sidewalks (those not rebuilt last year) and adding other streetscape and traffic calming features. 
  • Repaving of the roadway. 
  • Construction of raised intersections.

Review the final street design and get updates as work progresses on the project webpage below.

More Streets Slated for Pavement and Sidewalk Improvements

Warmer spring temperatures means new concrete and asphalt can be installed to improve the quality of our sidewalks and roadways.


The City prioritizes roadway and sidewalk repairs through its Pavement and Sidewalk Management program, which uses a multi-phase, data-driven process to evaluate needs and select streets and sidewalks for reconstruction.

Fresh asphalt and paint on Holland Street following last year's paving.

In addition to the work described above, the below projects are now under contract and expected to get underway during the 2026 or 2027 construction seasons.


Curb-to-Curb Paving and New Sidewalks


Paving the roadway from one side of the street to the other and replacing sidewalks on both sides of the street.


  • Perry Street (from Washington St. to Marion St.)
  • Holyoke Road (Elm St. to Elm St.)
  • Aldersey Street (Vinal Avenue to Walnut Street)
  • Grandview Avenue (Vinal Avenue to Walnut Street)


Sidewalk Replacement


Fully replacing the sidewalks on both sides of the street.


  • Prescott Street (Highland Avenue to Summer Street)
  • Howe Street (Marshal Street to School Street)
  • Rush Street (Broadway to End of Street)


Complete Street Projects 


Wholesale redesign and reconstruction of streets to improve safety and accessibility for all users of the road.



Interested in learning more about how we prioritize pavement and sidewalk work? Or seeing which streets are slated for partial paving? 

Visit our paving and sidewalk management program page.

School Building Project Newslettter

Do you enjoy this email? Are you looking for a similar newsletter focused on the design and eventual construction of singular vertical asset that provides a modern learning environment for Somerville's students and additional space for community programming?

If so, you are in luck because Somerville is planning to build a new public school building at 115 Sycamore Street (the site of the former Winter Hill School building) and there is a newsletter dedicated to covering that process:


  • updates as the City moves through the state's funding process
  • opportunities to share your perspectives
  • insight into the design process


Check out
this month's update and sign up at the page below:

Subterranean Somerville:

Coming Soon a Large Diameter Trunk Drain

What is Subterranean Somerville?

Ever wonder what's under your feet when you cross Broadway to get to Foss Park? Or why we've been doing so much digging in Spring Hill?


Each month we'll use this space to highlight a different element of the world beneath our streets—the old, the new, and what it all means for the future of our city.

Design efforts are underway to bring more effective stormwater management to Winter Hill and Ten Hills. The Mystic River Sewer Separation and Outfall Project will increase system capacity and help reduce combined sewer overflows to the Mystic. 


A key component of this project will be the installation of a new large diameter trunk drain along Wheatland Street, across Mystic Avenue/I-93, and next to Fellsway that connects to a new stormwater outfall.

Diagram of trunk drain location shared as part of recent design-focused community meeting.

This trunk drain is expected to consist of:


  • an 8 ft x 4 ft concrete box culvert along Wheatland Street
  • 78-inch diameter fiberglass reinforced pipe (FRP) across Mystic Ave. and I-93
  • 78-inch diameter concrete pipe next to Fellsway


Adding high-capacity drainage and a new outfall is an effective tool for reducing flooding and combined sewer overflows when paired with other stormwater management.


Construction is currently expected to begin in 2027.

Stay Up to Date on Citywide Construction Projects

There is a lot of work being done in Somerville as we look to modernize and improve our city’s infrastructure, and we can’t cover it all in one email.


Stay up-to-date with what’s going on in your neighborhood and around the city via the following channels: 




Have questions?

Get in touch

Want to learn more about these projects? Or have questions about work in your neighborhood?


construction@somervillema.gov

Language and Accessibility

To request translation or an interpreter in your language, please contact the Somerville Office of Immigrant Affairs at languageaccess@somervillema.gov or by calling 311.

ADA icon with four sections depicting ASL mobility TTY and CART services

Persons with disabilities who need auxiliary aids or reasonable modifications to access information or attend a City meeting or event should contact Adrienne Pomeroy at 617-625-6600 x 2059 or ADA@somervillema.gov.