Upcoming Amenity Improvement Schedule & Important Safety Reminders

We’re excited to share that improvement work is underway at both the Lifestyle Center and The Hearth to help preserve and enhance these community amenities. Over the next two weeks, crews will be cleaning, restoring, staining, repainting, and applying protective coatings to various wood and metal features throughout both locations.


Please note that portions of these amenities may be temporarily unavailable while work is being completed. We appreciate your patience as these improvements are made to keep our community looking its best.


Important Safety Reminders

The safety of our residents is our top priority. While work is taking place, please keep the following in mind:

  • Be aware of your surroundings and watch for construction equipment, work vehicles, tools, and designated work areas.
  • Please do not enter barricaded or restricted areas. These areas are closed for your safety while crews are actively working.
  • Children should never be left unattended near the work zones or playground during construction activities. Please ensure they remain with a responsible adult at all times.
  • Use extra caution when walking through the area and follow any posted signage or directions from the work crews.
  • Please help us keep everyone safe by allowing our contractors the space they need to complete the project efficiently.


Week 1: Lifestyle Center (July 27 – August 2)

  • July 27: Mobilization, site protection, pavilion cleaning, and playground preparation.
  • July 28: Cleaning and brightening of the pavilion ceiling, structural beams, and playground preparation.
  • July 29: Application of protective clear coatings to the pavilion ceiling, staining of structural timbers, and continued playground repairs.
  • July 30: Completion of pavilion coatings and staining, repainting of designated metal supports, and playground repainting.
  • July 31: Final playground repainting, touch-ups, quality inspections, cleanup, and preparation to move to The Hearth.
  • August 2 (Sunday): If needed, crews may complete any remaining work at the Lifestyle Center or begin mobilizing at The Hearth.


Week 2: The Hearth (August 3 – August 7)

  • August 3: Site setup, cleaning and preparation of the main pavilion, and metal support preparation.
  • August 4: Protective coating of the pavilion ceiling and staining of beams, trusses, and columns.
  • August 5: Completion of the main pavilion along with cleaning and preparation of the pool changing pavilion.
  • August 6: Coating and staining of the pool pavilion, repainting of metal supports, and restoration of ground timbers and decorative posts.
  • August 7: Completion of staining throughout The Hearth, including benches, walkway timbers, deck areas, hammock posts, light posts, fireplace wood repairs, final touch-ups, cleanup, and inspections.


We appreciate your patience and understanding while these improvements are completed. These maintenance projects help protect our community amenities and ensure they remain beautiful and enjoyable for years to come.


If weather or unforeseen conditions impact the schedule, updates will be communicated as needed.


Thank you for your cooperation!

undefined

The Groves Community Association Inc.

17317 Cathedral Pines Drive

Humble, TX 77346

832-777-0400

thegroves@ccmcnet.com

lifeatthegroves.com

Connect with us

Facebook  Instagram  LinkedIn