You have helped us finish (since April):
A. The 2nd floor (A little more furniture needed).
B. The 3rd floor we have completed both the mens and womens bathrooms and 4 dormitory rooms with ceramic and electric (need more furniture).
C. The directors apartment where we live
D. The 4th floor laundry rooms, water installation and hot water tank with propane gas installed!
E. The outside walkways (3 sides) and garage/patio floor
Yet to complete (generally speaking):
A. Ceramic and electric for 11 dorm rooms on the third floor; first floor classroom, computer lab and dining room.
B. Equipment for the commercial kitchen; our Missionary kid classroom and playground; Inside windows (in the center of building)
C. Outside: Construct front entrance; driveway; volleyball court; staircase to gazebo; and glass roof over garage and front entrance
|