|
1. The mandated rooftop rainwater harvesting system has been completed.
2. The required fire safety equipment was installed in the school.
3. The water filtration installation is completed, ensuring safe drinking water for the children.
4. The road is now elevated above the flood line, allowing our students to walk safely on dry ground during the monsoon season.
5. The conference room is finally furnished and in use for teacher training.
|