Featured in the Ashburn District
Monthly Update Flyer
| |
Proposed Transmission Line Projects
| | | | Loudoun County and Virginia News | |
Upcoming Opportunities &
Community Engagement
| | | | Comprehensive Plan Amendments & Zoning Ordinance Amendments | |
-
Data Center Standards & Locations; CPAM-2024-0001 and ZOAM-2024-0001 (Scroll Down for More Information)
| | | | Legislative Applications for Development | | Significant By-Right Developments | |   | The link for this edition of the Ashburn District Flyer can be found under today's date, which is located above the table of contents. | |   | From the Office of the Ashburn Supervisor | | |
Greetings Ashburn/Lansdowne!
On February 19, 2026, the Supreme Court of Virginia upheld the State Corporation Commission’s decision against the Lansdowne Conservancy and Loudoun County’s petition to underground a three-mile portion of the Aspen to Golden transmission line along the south side of Route 7. Although we sought to underground the segment near homes, Belmont Manor, and the Route 7 viewshed, the Court agreed with the SCC that the petition should be rejected due to cost, engineering challenges, and timing.
While it was important to advocate for this undergrounding, the outcome was not surprising. These same reasons—cost, engineering issues, and timing—are consistently cited to deny undergrounding, including in the Golden to Mars corridor. Utilities continue to rely on a 135-year old model of transmitting mostly fossil fuel power from large, distant plants over long spans of overhead lines. This approach will not meet Loudoun County’s unique energy needs, and it’s time to consider alternatives.
Although burying 500 kV High Voltage Alternating Current (HVAC) lines is difficult and expensive, burying 500 kV High Voltage Direct Current (HVDC) lines is significantly easier and more efficient. Historically, HVDC has been used only for long distance, point-to-point transmission, but Loudoun County may be well positioned to pilot the nation’s first underground HVDC regional grid dedicated to data centers. This would provide three major benefits:
- The creation of a separate grid and billing structure exclusively for data centers;
- The curtailment of new unsightly overhead HVAC power lines;
- The creation of a more efficient way to deliver carbon neutral energy—such as solar and wind—directly to Data Center Alley across long distances.
This is just one potential solution. There were a lot of other ideas related to data centers in the state legislature this past year. One promising one was a bill sponsored by Delegate J.J. Singh and Delegate Kannan Srinivasan allowing the SCC to approve up to four pilot undergrounding projects if they meet specific criteria, including a requirement that the locality pay 50% (if it agrees) of the marginal cost through one or more possible funding mechanisms. This could also play an important role in kickstarting a regional HVDC network.
There is a lot happening in this space so stay tuned for more updates.
Cheers,
Mike Turner
Vice Chair | Ashburn District Supervisor
| | |
Senior Smart Trip Cards Now Available in Loudoun County | Loudoun County Transit and Commuter Services, in collaboration with the Washington Metropolitan Area Transit Authority, announces the local availability of the Senior Smart Trip card, a free, reloadable fare card that provides residents age 65 and older with a 50% discount on fares for Metro Rail, Metro Bus, Loudoun County Transit’s commuter bus and other regional transit services that accept Smart Trip. The card works like a standard Smart Trip card but automatically applies the senior discount when used for travel. Loudoun County is the first jurisdiction in the region expanding access to the cards by having them available at many convenient locations throughout the county. | | | | A Message from AARP Virginia | | |
AARP Virginia will be hosting two important educational events in Ashburn; they are free and open to all.
Spotting Scams & Staying Safe
Thursday, April 23, 2026 | 1:30 - 3 p.m.
Ashburn Library, 43316 Hay Road in Ashburn
How do you stay safe from scams? This is where AARP can help!
Scams can happen to anyone – but spotting and avoiding these criminals can become second nature when you know the right steps to take to protect yourself and your loved ones.
Join us for this free workshop where you can:
• Hear about the latest scams and what tactics are being used
• Build confidence, with steps you can take to protect yourself and loved ones
• Explore AARP tools and resources to help keep you up-to-date on the latest scams
Register today! Online events.aarp.org/SpotScamsAshburn or call: 877-926-8300
Practical Tools for Today’s Job Search
Friday, May 22, 2026 | 2 – 4 p.m.
Ashburn Library, 43316 Hay Road in Ashburn
Looking for guidance in a career transition? This is where AARP can help!
Discover how you can age-proof your resume, use AI in your job search, network effectively and hone your interviewing skills!
Join us for this free, interactive workshop where you can:
• Connect with fellow job seekers
• Get tips to help strengthen your resume
• Explore how to optimize your online presence
• Prepare for tough interview questions
Before the workshop, you’ll gain access to a free, interactive resource with educational videos and exercises designed to help guide your job search journey with actionable steps.
Register today! Online: events.aarp.org/JobSearchAshburn or call 877-926-8300
| | Proposed Transmission Line Projects | |
|
Background: The Line 514 Corridor Upgrade project will stay within the existing right of way, with a possible exception of a small, non-residential area near an existing substation. The project will replace aging equipment, provide additional power to the region due to growing economic development, and help maintain overall grid reliability. The original purpose of this project was to replace outdated structures and conductors; however, through the PJM Open Window process this corridor was identified to be optimized with additional infrastructure in coordination with other regional utilities. The current corridor has an existing 500 kV lattice structure and a double circuit 230 kV monopole. The revised design will have two 500/230 kV monopoles and another 500 kV monopole. While these new and rebuilt lines will connect with FirstEnergy, PEPCO, and NextEra lines at the Potomac River crossing, Dominion Energy will construct and maintain the lines from the Potomac River to existing substations approximately 3.5 miles south near Leesburg.
For more information regarding the "Line 514 Corridor Update" click here.
| | | |
|
Previous Update: On February 19, 2025, the Virginia Supreme Court upheld the SCC's approval of SCC's decision to approve the Aspen to Golden transmission lines entirely above ground.
-
Previous Update: The Virginia Supreme Court heard the case on January 12, 2026. Once a decision has been reached, we will provide an update.
-
Previous Update: The County filed their petition to their Virginia Supreme Court on June 5, 2025, and the Court agreed to hear the case on June 18, 2025, at a later date.
-
Previous Update: In March 2025, Loudoun County joined the Lansdowne Conservancy in an appeal to the Virginia Supreme Court regarding the State Corporation Commission's (SCC) decision to overhead the transmission lines down a portion of Route 7.
-
Previous Update: On February 5, 2025, the SCC announced its final decision, approving both the Aspen to Golden and Apollo-Twin Creeks applications for above-ground high-voltage transmission lines. The Aspen to Golden Project decision was consolidated with the Apollo-Twin Creeks Project decision, and the final order can be downloaded here.
-
Previous Update: The SCC Examiner recommended to the SCC on November 1, 2024, to approve of the Aspen-Golden transmission line without any portion being underground. Click here to access the PDF of the SCC’s Hearing Examiner’s recommendation from 11/01/2024.
The county responded to the SCC Hearing Examiner’s Report. Here is a short summary of the county’s rebuttal. The rebuttal can be accessed here, the following summary is from page 33 of the PDF.
Undergrounding Aspen-Golden along as much of Route 7 as possible will not only conform with the County’s 2019 General Plan, preserve the Belmont Viewshed Easement, promote economic development, minimize adverse impacts to the extent reasonably practicable, and be responsive to public opinion. It will also educate the Company, the County, the Commission, and all of us, about the technical and logistical aspects of undergrounding, so that we do not look back on these proceedings ten years from now, throttled by criss-crossing transmission lines, wondering what could have been.
Background:  Dominion Energy has developed proposals for a project named “Aspen to Golden,” a potential transmission route that calls for the construction of new transmission lines that will run from a future Leesburg substation (Aspen) to a future Ashburn substation, near Loudoun County Parkway (Golden). During their virtual and in-person meetings on January 9, 2024, and January 11, 2024, Dominion announced updated proposed routes along Route 7 and Loudoun County Parkway. For more information regarding "Aspen to Golden" click here.
| | | | | |
Stay Informed:
-
General information landing page for Dominion’s NOVA projects: dominionenergy.com/nova
-
“GeoVoice,” an interactive mapping tool that gives members of the public the ability to review and provide feedback on Dominion’s proposed project routes: geovoice.com/dominion/LoudounCounty
-
“NOVA Virtual Open House,” an interactive website that includes information about all of Dominion’s transmission route plans for Loudoun County: engage.com/novareliability
Contact Dominion Energy:
Dominion Energy has provided the following contact information for questions:
More information about transmission line projects affecting Loudoun County can be found at loudoun.gov/TransmissionLines.
| |
Board of Supervisors Adopts Fiscal Year 2027 Budget | The Loudoun County Board of Supervisors has approved a budget totaling approximately $5.4 billion in total appropriations for the general county government and school system for Fiscal Year (FY) 2027. The adopted budget maintains the current real property tax rate and lowers the personal property tax rate for vehicles next year, which will result in an overall net tax reduction for most Loudoun home and vehicle owners. | | | |
Expedited Attainable Housing Development Pilot Program Accepting Applications | Loudoun County’s new Expedited Attainable Housing Development (EAHD) Pilot Program is open and accepting a limited number of applications. The program is intended to promote the development of attainable housing units to help address the county’s unmet housing needs and will run until December 31, 2026. | | | |
Board Approves Measures Intended to Calm Traffic in Moorefield Station West | Two speed humps and associated signage along Old Ryan Road (Route 893) in the Moorefield Station West community approved by the Board of Supervisors during its March 17, 2026, meeting are intended to improve safety by slowing traffic. | | | |
Loudoun Commuter Bus Service Adjustments Begin April 1, 2026 | |
Beginning on Wednesday, April 1, 2026, Loudoun County Transit will implement the following commuter bus service adjustments to expand connections for commuters and implement reduced fares for seniors and people with disabilities:
-
Relocation of Commuter Bus Service from Dulles Transit Center to Loudoun Gateway: Provides an additional transit connection to the Silver Line Metrorail and free parking in the garage when using a SmarTrip card on an evening commuter bus return trip.
-
Bus Stop Change in Washington, D.C. for P.M. Pickups: A permanent evening stop change for passengers traveling from Washington, D.C. to Loudoun County.
-
New Reduced Fare Available for Seniors (65+) and Persons with Disabilities using SmarTrip Cards: Eligible riders will receive a 50 percent discount on commuter bus services.
| | | | Upcoming Opportunities & Community Engagement | |
Next Loudoun Household Hazardous Waste Event is April 25 in Hamilton | The next Loudoun County Household Hazardous Waste (HHW) collection event is scheduled for Saturday, Saturday, April 25, 2026, 8:30 a.m. - 2:30 p.m., at the Harmony Park and Ride, 39464 East Colonial Highway in Hamilton. Loudoun residents are welcome to bring HHW from their homes to the event, free of charge. | | | |
Loudoun Offers Behavioral Health Training Sessions | Loudoun County offers ongoing behavioral health training sessions free of charge. Seats are limited and registration is required, except for Rapid REVIVE! | | | |
Loudoun County to Host Pit Stops for Bike to Work Day Friday, May 15 | Loudoun County will host two pit stops in Leesburg and Sterling for Bike to Work Day on Friday, May 15, 2026. This free, annual event celebrates a healthy and fun way to get to work with over 100 different pit stops throughout the Washington Metropolitan area. Registered participants will bike to a pit stop, pick up a free T-shirt and giveaways, and enjoy refreshments before beginning their workday. | | | |
Loudoun Homeowners Can Explore Solar Power Options with Solarize Virginia | Loudoun County homeowners once again have the opportunity to sign up to learn more about solar power options specific to their property through Solarize Virginia, an initiative that reduces the cost and complexity of going solar. The 2026 campaign will focus on helping homeowners better understand the rapidly evolving solar power landscape. | | | |
Loudoun Offers Free Workshop for Landlords About County Programs for Tenants | |
Landlords and property managers will have two opportunities to attend a free workshop hosted by Loudoun County about the county’s Housing Choice Voucher program, Information and Referral program, the Homeless Prevention and Diversion program and fair housing:
-
Virtual: Tuesday, May 12, 2026 from 10:00 a.m. – 12:00 p.m.
-
In person: Thursday, May 14, 2026 from 10:00 a.m. – 12:00 p.m. at the Ashburn Recreation and Community Center (21105 Coopers Hawk Drive, Ashburn)
| | | |
Business Hazardous Waste Drop-Off Event April 30 | Loudoun County will host a hazardous waste drop-off event for businesses and other non-residential generators on Thursday, April 30, 2026. Pre-registration is required to participate, and must be received no later than 5:00 p.m. Friday, April 24. The program consists of two events a year where eligible hazardous waste generators may deliver toxic, reactive, ignitable and corrosive materials for proper disposal. | | | |
Loudoun Hosts Faith-Based Attainable Housing Summit May 6 | Loudoun County will host a housing summit May 6, 2026, for local faith-based organizations and nonprofit organizations to learn about building attainable housing on land owned by faith communities. Loudoun County defines attainable housing as housing affordable to households earning from 0 – 100% of the area median income. This represents a household of four earning up to $163,900. | | | |
Loudoun Hosts Monthly Virtual Foster Care Information Sessions This Spring | The Loudoun County Department of Family Services (DFS) continues to host monthly virtual foster care information sessions with dates scheduled in April, May and June 2026. | | | | Comprehensive Plan Amendments & Zoning Ordinance Amendments | |   | |
The Loudoun County Board has the authority to make changes to the 2019 Comprehensive Plan and the Loudoun County Zoning Ordinance through a Comprehensive Plan Amendment (CPAM) and a Zoning Ordinance Amendment (ZOAM) process.
The Zoning Ordinance regulates land use throughout the county and is the primary implementation tool for the 2019 Comprehensive Plan, a policy document that provides a flexible framework and implementation strategy to meet the county’s future land use and transportation needs. Although CPAMs and ZOAMs are frequently undertaken together, not every project requires both.
The priority for this section is to provide our constituents with up-to-date information about any Board initiated CPAMs and ZOAMs that will impact the Ashburn District
|  
|   | |
Data Center Standards & Locations
CPAM-2024-0001 and ZOAM-2024-0001
| | |
On February 6, 2024, the Loudoun County Board of Supervisors directed staff to move forward with a Comprehensive Plan Amendment (CPAM) and an associated Zoning Ordinance Amendment (ZOAM) to update the policies and standards for data center and electrical substation uses.
The Project Plan for Data Center Standards and Locations (CPAM-2024-0001 and ZOAM-2024-0001) will move forward in two phases, click here for more information on the phases.
On July 2, 2024, the Board approved an Intent to Amend the Zoning Ordinance as well as the Revised Project Plan to proceed to a September 24, 2024, Planning Commission public hearing.
On December 12, 2024, the Planning Commission forwarded this to the February 12, 2025, Board of Supervisors Public Hearing.
On February 12, 2025, the Board of Supervisors directed staff to return to the March 4, 2025, Board Business Meeting with draft Grandfathering Resolution options.
Click here for the action report to see the motions for the March 4, 2025, meeting.
On February 12, 2025, the Board also forwarded the CPAM and ZOAM to the March 18, 2025, Board of Supervisors Business Meeting for action.
On March 18, 2025, the Board approved Phase 1 of the Data Center Standard & Locations, Phase 2 is scheduled to come to the April 15, 2025, Board of Supervisors Business Meeting.
Click here for the action report to see the motions for the March 18, 2025, meeting.
| | LandMARC Progress Updates | |
|
On August 14, 2023, Loudoun County launched LandMARC (Land Management, Applications, Research, Coordination). LandMARC is the county's online land management system. More information about LandMARC can be found here.
Stay Informed
Beginning September 26, 2023 there will continue to be twice-weekly updates to share the progress in processing permits. These updates will be posted online at Loudoun.gov/bdpermits. The link to this information is also posted in the LandMARC self-service portal. Loudoun.gov/LandMARC remains the landing page for all industry to get information about the system, including system status, help and how-to guides, and read important updates on the LandMARC blog.
| | | | Legislative Applications for Development in the Ashburn District | |
Luck Stone Leesburg Plant
Application Number LEGI-2023-0084
| |
Description: "Luck Stone Leesburg Plant" is a Zoning Concept Plan Amendment (ZCPA) Application to amend proffers and development conditions to allow for expansion of mining operation in quarry B, on the east side of Goose Creek, underneath the current processing plant, resulting in the processing plant and point of sale to move to the west side of the property. On the west side of Goose Creek, the application is amending the development conditions to allow for Stonewater Lane to be used for shipping mined materials off-site and to rezone a portion of Luck Stone’s property to allow for data center uses. According to Luck Stone, if this application is approved, the timing of the relocation of the point of sale to Stonewater Lane and the expansion of mining operations in quarry B is subject to several variables but is not currently anticipated for approximately 25 years.
Status remains the same since the 05/23/2023 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
West Belmont
Application Number: LEGI-2024-0018
| |
Description: "West Belmont" is an application to rezone approximately 27 acres to allow for development approximately 318 dwelling units (previously 367) and 11,000 square feet of retail.
New Update: At its April 21, 2026, Business Meeting, the Board of Supervisors voted to approve this application. At the request of Vice Chair Turner, the application was revised to include one additional pedestrian crosswalk at Belmont Ridge Road and Portsmouth Boulevard and two additional pedestrian crosswalks with safety enhancements along Portsmouth Boulevard.
-
Previous Update: This application has been scheduled for the April 21, 2026, Board of Supervisors Business Meeting for action.
-
Previous Update: At the January 14, 2026, Board of Supervisors Public Hearing, the Board voted to send this application to a future Board of Supervisors Business Meeting for action.
-
Previous Update: This application is scheduled for the January 14, 2025, Board of Supervisors Public Hearing
-
Previous Update: On November 13, 2025, the Planning Commission decided to send this application to a future Board of Supervisors Public Hearing, with a recommendation of approval.
-
Previous Update: This application is scheduled to come to the November 13, 2025, Planning Commission Work Session.
-
Previous Update: This application is scheduled to come to the October 9, 2025, Planning Commission Work Session.
-
Previous Update: At its July 29, 2025, Public Hearing, the Planning Commission voted to send this application to a future Planning Commission Work Session (PCWS).
-
Previous Update: This application is scheduled to come to the July 29, 2025, Planning Commission Public Hearing.
-
Previous Update: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
National Conference Center Residential
Application Number: LEGI-2024-0024
| |
Description: "National Conference Center Residential" is an application for a Zoning Map Amendment of 46.62 acres to (Suburban Compact Neighborhood-8) SCN-8 (36.42 acres) and (Suburban Compact Neighborhood-16) SCN-16 (10.20 acres) to introduce a mix of single-family detached, single-family attached, and multifamily attached dwellings.
Status remains the same since the 07/02/2024 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with him via email at mike.turner@loudoun.gov.
| | | |
Spring Valley Technology Park
LEGI-2024-0074
| |
Description: A Zoning Map Amendment for 362 acres from TR-10 to IP, A Special Exception to establish 3 utility substations "Utility, Major", A Minor Special Exception to allow battery energy storage system on the property and a Minor Special Exception to reduce the setback adjacent to zoning districts permitting residential use.
Status remains the same since the 03/07/2025 newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with via email at mike.turner@loudoun.gov.
| | | |
|
Description: A Zoning Map Amendment of seven parcels totaling 4.871 acres from the Countryside Residential – 1 (CR-1) Legacy Zoning District and Single Family Residential – 2 (R-2) Legacy Zoning District to the Suburban Compact Neighborhood – 16 (SCN-16) Zoning District to allow infill development of 50 dwelling units composed of single-family attached and multi-family stacked (2 over-2 condominium units).
Status remains the same since our 11/03/2025 newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with via email at mike.turner@loudoun.gov.
| | | |
|
Description: A Zoning Map Amendment for 2.44 acres R-2 to SN-6 zoning district for the development of 13 single family attached dwelling units.
Status remains the same since our 11/03/2025 newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab. To leave a public comment for county staff, click here. Supervisor Turner also invites you to share your thoughts and opinions about this application with via email at mike.turner@loudoun.gov.
| | | | | Significant By-Right Developments in the Ashburn District | |   | By-right: A "by-right" development is an application that does not require approval from the Board of Supervisors. The approval/denial of applications for by-right developments are managed administratively by county staff and must conform to the current zoning ordinance. | |   |
|
Description: “CyrusOne Broadlands Data Center” is a by-right application which plans to build a 41,000sf data center on 58 acres. The underlying zoning in Planned-Development Industrial Park (PD-OP). Data Centers are allowed by-right on PD-OP zoned land.
Status remains the same since the 01/26/2024 Newsletter: County staff from multiple departments are reviewing this application with the applicant.
For more information on this administrative application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | | |
|
Description: “Belmont Landbay KK Data Center” is a by-right site plan approval request to develop data centers on approximately 51 acres that is zoned for Planned Development Office Park (PD-OP). The applicant proposes developing two data center buildings, one substation and one office building.
Update remains the same as the 11/03/2025 newsletter: On October 6, 2025, county staff confirmed conditional approval of the site plan submitted through the by-right application process.
-
Previous Update: County staff from multiple departments are reviewing this application.
For more information on this administrative application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | | Road Improvements in the Ashburn District | |
|
Waxpool Road & Faulkner Parkway Roundabout
Application Number: CPAP-2021-0039
(Road Improvement)
| |
Description: CPAP-2021-0039 is a construction plan profile (CPAP) for the design of a two-lane roundabout, to be built at the T-intersection of Waxpool Road and Faulkner Parkway. This roundabout was proffered as a part of the Waxpool Crossing application (ZMAP-2019-0020), which was approved by the Board of Supervisors in 2021.
Status remains the same since the 09/07/2025 newsletter: A groundbreaking for the Waxpool Road and Faulkner Parkway Roundabout construction was held on July 29, 2025.
Previous Update: The Construction Plans and Profiles (CPAP-2021-0039) for the Waxpool Road and Faulkner Parkway Roundabout have received final approval from Loudoun County on November 4, 2024. Please see above for a photo of the final plan. The project, which includes a two-lane roundabout at the intersection, is now ready to proceed, with the following remaining permit requirements:
- Soil Tests & Pavement Approval: Soil tests must be conducted on the constructed subgrade to determine actual CBR values and must be approved before paving.
- Grading Permit: If offsite grading is required, letters of permission must be obtained before submitting the grading permit application.
- VDOT Permit: Any work within the VDOT right-of-way requires a permit from the Leesburg VDOT office before construction begins.
-
Previous Update: The applicant is working to secure permits for this project, as well as acquiring easements from adjoining property owners, and coordinating utility relocations with Dominion Energy, Verizon and Washington Gas. The outstanding permits for this project are a grading permit, a VDOT Right of Way (ROW) permit, as well as VDOT's approval of the proposed Maintenance of Traffic Plan.
-
Previous Update: Engineering plans have been approved. County staff is working with the applicant to complete any outstanding items that remain.
-
Previous Update: Engineering plans were submitted by the applicant and are being reviewed by county staff from multiple county departments.
For more information on this application, click here. To review the application documents, scroll down to the middle of the page and click the “Attachments” tab.
| | | |
VDOT 511
511 provides users with real-time, accurate traffic information from the Virginia Department of Transportation (VDOT) about road conditions, traffic congestion, and highway construction anywhere you are, anytime you need it.
More information on VDOT 511 can be found here.
| |
Online Process for Building Permits, Land Development Applications
Homeowners and residential contractors can submit their completed application form and supporting documentation, including drawings and plats, in PDF format for most residential construction projects to the Department of Building and Development online. More information about the online submission process and requirements is available here.
| |
Residential Traffic Calming Guide
Loudoun County’s Department of Transportation and Capital Infrastructure (DTCI) manages an eight-phase process to address traffic calming, which considers residents’ concerns regarding speeding, safety and overall quality of life on publicly-maintained residential streets.
| |
Who Maintains my Street?
To identify which entity responsible for maintaining your road/street, Loudoun County made an online color coded mapping system which helps residents determine who to contact when work needs to be done.
| |
Report a road problem
VDOT created an easy to use online form to report unsafe and hazardous road conditions. Similarly, work requests for state-maintained roads can also be made here.
| |
Paving Schedule
VDOT reports what roads will be paved during the fiscal year and updates their website with progress updates.
See VDOT's Paving Schedule here.
| |   | As your representative on the Loudoun County Board of Supervisors, my top priority has been to serve your needs and work towards the betterment of our community. Please don’t hesitate to contact me directly or my staff with any input and ideas you may have for the Ashburn District. The best way to reach me is by email, which I monitor on a regular basis. | |   | | | |