1.
Examine the architect's drawings closely for hoist-way measurements, distance of travel and other pertinent considerations.
2.
Obtain
typical drawings from Inclinator.
3.
Draw up
a budget consideration.
4.
Provide
Comprehensive Installation Agreement.
5.
Order
job specific drawings upon receiving deposit and signed agreement. This can take up to 5 to 7 days.
6.
Provide
site visit to check correct pit depth, condition of hoist-way, rail blocking in proper condition, and proper location of main power disconnect.
7.
Visit
showroom for cab selections and other available options and upgrades.