Hi all and hope you are having a good week.
Recently, we are starting to see some observations or at least tracer activity around clinical alarms again. Tracer activity to evaluate clinical alarms usually begins in areas such as the Telemetry Unit, a visit to the Monitor Technician area, and units where remote monitoring occurs such as higher acuity Medical Units.
Surveyors will often let the tracer guide toward clinical alarm issues. For example, when I am reviewing orders for a patient who has been placed on a telemetry monitor, I look, first that an order exists to apply a heart monitor then evaluate the order further whether the patient can leave the unit with or without the telemetry monitor on.
Next, I review the alarm safety policy with the team involved in the tracer for the following:
- Awareness of a hospital clinical alarm policy and do they know where to access the policy.
- Awareness of alarm safety is a leader's priority? Are leaders aware alarm safety being a national patient safety goal and the risks associated with clinical alarms?
- If an issue with an alarm is identified, what is done to immediately address the issue? Is an issue with an alarm reported as a patient safety issue in the variance reporting system?
- Do staff members know what serious risks are associated with alarms that have been silenced, or alarms where the parameters have been changed to eliminate the alarm?
- Further questions come with significant patient impact: Source: (NPSG.06.01.01 EP 2)
- When alarm signals can be disabled and parameters can be changed? I often hear different answers between the monitor technicians and the nursing staff. The policy should provide definitive guidance, staff members should be giving consistent answers and if not, I look at competencies.
- Who has the authority to set alarm parameters and who has the authority to set alarms to “off?” Turning alarms “off” often occurs with patients on palliative care or a patient who is actively moving. When this observation is noted during a tracer, I review the policy with the staff member and then review how the policy addresses turning the alarms off. Usually, the policy will state that no one can turn an alarm off unless ordered by the provider. Next, I look for an order. If no order, the finding will be scored. Since this NPSG has been in place for a long time, competencies are also often missed so that finding also gets scored in HR.01.06.01.
- How are alarm signals monitored and what is the process and time frame for responding to alarm signals? This is an interesting part of the tracer. I usually talk to the monitor technicians about the nursing response times and response times are documented or monitored in some way. Usually, I find, that response times are monitored when an issue has been identified, such as, when unit nurses were not responding within five minutes (time is internal policy dependent) and a patient suffered an adverse event or a near miss. Unfortunately, patient sentinel events have occurred due to a lack of monitoring or delayed response times.
- Who is responsible for checking alarm signals for accurate settings, proper operation, and detectability? In tracer activity, ensure that the patient’s primary nurse is performing this task or has oversite. Tasks such as checking alarms can be delegated as long as the RN is acutely aware, and the staff member has had requisite training to check alarms.
Alarm Safety Policy and Procedure Multidisciplinary Team:
- When performing a tracer and reviewing the clinical alarm policy, ask staff members and unit leaders how the policy was created. For example: Was the policy written in a multidisciplinary manner to include medical staff, nursing staff, respiratory therapists, monitor technicians, biomedical technicians, facilities staff members, and a member of senior leadership?
- Does medical equipment risk crosswalk to the environment of care? Biomedical engineering and the facilities department play a critical role in the management of the alarms, facilitating proper functioning of all high-risk equipment, and also play a role in clinical staff education. During tracer activity, I often call the biomedical technician on duty and discuss their role in developing the policy as part of the multidisciplinary team.
The NPSG .06.01.01 primarily focuses on equipment and devices that monitor a patient’s physiological status; other alarms can be included in the policy which often involves biomedical engineering and the facilities team. In some units or standalone psychiatric hospitals, the NPSG may have limited application.
During tracer activity, to evaluate whether the clinical alarm policy was created in a multidisciplinary project approach, all members of the project team should be able to indicate that they evaluated the need to manage alarms and why they concluded which alarms should or should not be managed as described by the NPSG.
An R3 Report was published on December 11, 2013, addressing the critical importance of alarm safety and later went on to say the following: ’The Joint Commission Sentinel Event database contains 98 reports of alarm events between January 2009 and June 2012. Eighty of those events resulted in patient death. In addition, a Food and Drug Administration (FDA) database contains 566 alarm-related patient deaths between January 2005 and June 2010.”
In the Sentinel Event Alert, April 8, 2013, the alert discusses Leadership and organizational planning: “Establish a cross-disciplinary team that includes representation from clinicians, clinical engineering, information technology, and risk management, to address alarm safety and the potential impact of alarm fatigue in all patient care areas. Establish a process for continual improvement and constant optimizing of alarm systems policies and configurations.” We have included these publications in our weekly News for your convenience. The Alert and R3 are still current and always worth a re-review.
|