The Leading Edge: Q2 - 2023
|
|
From our President
By: Chris Vandersluis
It has been a remarkable few weeks here at HMS. We are busy as usual but we’re also celebrating some great accomplishments. On the technical front, TimeControl 8.4 was released. That means coding of course but also testing, documentation, marketing materials, updates to TimeControl Online and so much more. On the marketing front we have renewed partnerships with Oracle and Microsoft for 26 and 28 years respectively. That’s not quite unique in the industry but pretty darned close. We’ve also been busy updating materials on TimeControl.com and our social media pages and we’ve taken a renewed interest in our YouTube channel where we’re working on uploading our content on a much more regular basis. All of that to say that whatever we have accomplished in this quarter is completely a team effort from one of the best technology teams in the business.
|
|
TimeControl Version 8.4 release is now complete
By: TimeControl Development
All versions of TimeControl, TimeControl Online, TimeControl Industrial, TimeControl Industrial Online and TimeControl Project have been updated to version 8.4. We’re delighted with the results. Some of the fabulous new features include a complete dashboard rewrite, support for Azure 365 Active Directory, a new type of integration link for Primavera to support the new Primavera REST API and enhancements to Start/Stop, Table default values, Table templates, an updated link for InEight Estimate, a complete update of the free TimeControl Mobile App and so much more. For more information on the new version, go to TimeControl.com/features/latest.
|
|
Have you tried TimeControl Project?
By: Sales and Marketing
TimeControl Project was updated as part of TimeControl 8.4 and we have re-instituted a 90 day free trial of this remarkable project management toolset. All TimeControl Online and TimeControl Industrial Online clients now have free access to TimeControl Project for a limited time. If you haven’t tried it yet, ask the sales team to give you a free demonstration and mini-training session at TimeControl.com/contact.
|
|
We’re already at work on TimeControl future versions!
After a new release makes it out the door, no one at HMS gets to sit back for long. We have already begun design and coding of TimeControl 8.5 and are working also on future editions of TimeControl. It’s too early to reveal much but by September we expect that we will be able share a lot more about the next release. Our targets for enhancements of TimeControl are at every level. We look at an architectural/design level, a security level, a database level, a performance level and, of course, at the application/feature level. The ideas for TimeControl come from multiple sources including innovations from our own staff, requests or suggestions from clients, evolution of partner products, and trends in the technology, project management and timesheet industry. It’s been 27 years since the first release of TimeControl and we’ve got a lot more planned for the future.
|
|
HMS and Oracle have renewed their technical alliance
By: Marketing
It’s been 26 years since HMS and Microsoft started their technical partnership. At the time we made two technical alliances at the same time. One with Primavera, the other with Oracle. A few years later Oracle would purchase Primavera and the multi-faceted two-company relationship came under one roof. We haven’t looked back. For more than a quarter century we have leveraged multiple Oracle products including Oracle and MySQL databases, Primavera Pro and Primavera EPPM, Oracle NetSuite and more. For more information on all the ways we link with Oracle technology, see the Oracle Portal at: Oracle.TimeControl.com.
|
|
Microsoft has once again named HMS as a partner
By: Marketing
HMS and Microsoft have had a partnership since before the Microsoft Partner Network was created. Way back in 1995, HMS joined what was then called the Microsoft Certified Solution Provider Program. We’ve been a part of the Microsoft ecosystem every since. This year we are celebrating our 28th year as part of the Microsoft Partner organization. It's been a remarkable collaboration between our two firms. Our ties occur at many levels on the technical, design and marketing fronts but the goal is always the same: providing a better solution for our mutual clients. Aside from our integration with all the variants of Microsoft Project, we have ties to so many other Microsoft technologies including Microsoft 365, SQL Server, Windows, IIS, Edge, and more. You can see some of our many links on our Microsoft Portal at Microsoft.TimeControl.com.
|
|
TimeControl was originally released in 1994. It was immediately successful in the project management sector and is recognized as a multi-function solution and used by companies worldwide. TimeControl is designed to serve the needs of Project Management, Finance and other corporate systems simultaneously. It includes features such as flexible user structures to allow for multiple levels of timesheet authorization and an open data architecture, which makes the product ideally suited for integration with existing data systems in any organization. TimeControl is designed to integrate with Oracle-Primavera Pro and Primavera EPPM, Microsoft Project, and Project Online, BrightWork, JIRA, SharePoint, Contruent and, InEight's Hard Dollar. TimeControl's remarkable flexibility allows it to be deployed for use simultaneously as a time and attendance, time and billing, project time and flex-time system.
TimeControl is available both as an in-the-cloud subscription service and for for purchase for an on-premises installation.
|
|
Gail Robinson
HMS Software
|
|
189 Hymus, Suite 402
Pointe Claire, QC H9R 1E9
514-695-8122
|
|
|
|
|
|
|
|