Water Main Testing Notice
Testing of the newly installed water main is ongoing throughout the project area. You may notice small taps of running water. Please do not touch, turn off or tamper with these taps. These tests are required by the Florida Department of Health and must run their full course without interruption. If stopped, the contractor (Metro Equipment Service. Inc) would need to restart the process, which would cause delays. This testing is an important step to ensure the water system is safe and ready for use. We appreciate your cooperation and patience while it is completed. Please refer to the maps below for location details.
Once the testing period is over, construction crews are able to connect the newly installed water mains to the city system. FFP 2 is scheduling the new water main connections on 17 and 18 Streets for the week of July 27.
|